Recovery Act Watershed Dam Repairs - Upper Brushy Site 29 and Lower Brushy Site 8

Award Notice Posted

Solicitation number
AG-7442-S-10-0036
Agency
Awarded
to Ranger Excavating LP
Set-aside
No set-aside

Opportunity facts

Contract number
AG-7442-C-10-0042 Federal contract award
NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Not on record
Place of performance
Site Showing Information: March 18, 2010 at 9:30am CST at Taylor City Council Chambers, 400 Porter Street Taylor, Texas 76574, United States

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

RECOVERY FUNDED Project: Repair of slope slides to Lower Brushy Creek Watershed Site 8 and Upper Brushy Creek Watershed Site 29 by installing lime treated earthfill.

Update #2 ·

RECOVERY: Site Showing Location: Taylor City Council Chambers, 400 Porter Street, Taylor, Texas 76574 at 9:30 am, CST on March 18, 2010.









Recovery Funded: USDA-Natural Resources Conservation Service is announcing a project under the American Recovery and Reinvestment Act. The work includes repairs to two Watershed dams, Upper Brushy Creek Site 29 and Lower Brushy Creek Site 8. The designs for these sites will address the repair of slope slides along the embankment by lime-treatment and will consist of: preparing the access and campsite; removing fences from the work area; clearing grubbing the work area; stripping and stockpiling the topsoil from the embankment and lime processing area; excavating the embankment slopes; backfilling the embankment slopes with lime-treated earthfill and earthfill (as appropriate); placing topsoil 1-foot thick normal to the slope over the lime treated earthfill; and vegetating the disturbed areas. The contractor will be required to repair both dams concurrently. Location of the dam are in Williamson and Milam Counties, Texas.



Solicitation package will be posted o/a March 4, 2010.





Site Showing will be conducted on March 18, 2010. See above.



Range: $1,000,000 to $5,000,000



Update #1 ·

Recovery Funded: USDA-Natural Resources Conservation Service is announcing a project under the American Recovery and Reinvestment Act. The work includes repairs to two Watershed dams, Upper Brushy Creek Site 29 and Lower Brushy Creek Site 8. The designs for these sites will address the repair of slope slides along the embankment by lime-treatment and will consist of: preparing the access and campsite; removing fences from the work area; clearing grubbing the work area; stripping and stockpiling the topsoil from the embankment and lime processing area; excavating the embankment slopes; backfilling the embankment slopes with lime-treated earthfill and earthfill (as appropriate); placing topsoil 1-foot thick normal to the slope over the lime treated earthfill; and vegetating the disturbed areas. The contractor will be required to repair both dams concurrently. Location of the dam are in Williamson and Milam Counties, Texas.





Site Showing will be conducted on March 18, 2010. Location and time to be determined.



Range: $1,000,000 to $5,000,000



Files

Show all 29

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors