Long Abstract Brushy Creeks Sites.xlsx
XLSX spreadsheet 61 KB Posted
- Solicitation number
- AG-7442-S-10-0036
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| FOR GOVERNMENT USE ONLY. | 1. SOLICITATION NUMBER | 2. DATE ISSUED | 3. DATE OPENED | PAGE | |||||
| ABSTRACT OF OFFERS - | AG-7442-S-10-0036 | 2/17/10 | 4/5/10 | 1 of 6 | |||||
| 4. ISSUING OFFICE | I CERTIFY that I have opened, | NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE) | |||||||
| USDA Natural Resources Conservation Service | read, and recorded on this abstract | Kathleen Pinckney | |||||||
| 101 South Main Street | all offers received in response to | Contracting Officer | |||||||
| Temple, Texas 76501-7602 | this solicitation. | SIGNATURE DATED: | DATE SIGNED | ||||||
| /s/ | 4/5/10 | ||||||||
| 5. PROJECT TITLE | 6. GOVERNMENT ESTIMATE | 7. OFFERS | |||||||
| (Check A, B, or C and complete D, E, and F) | NO. 1 | NO. 2 | NO. 3 | NO. 4 | |||||
| Upper Brushy Creek 29 & Lower Brushy Creek 8 | A. HIRED LABOR | A. OFFEROR | A. OFFEROR | A. OFFEROR | A. OFFEROR | ||||
| ARRA Funded Watershed Repairs | B. REASONABLE CONTRACT | Ranger Excavating | AMS Company, Inc | MAC, Inc | Austin Engineering Co, Inc | ||||
| (Without Profit) | Austin, TX | Cleburne, TX | Austin, TX | Austin, TX |
| B. BID SECURITY | B. BID SECURITY | B. BID SECURITY | B. BID SECURITY | ||||||||||
| 8. NUMBER OF AMENDMENTS ISSUED | C. REASONABLE CONTRACT | yes | yes | yes | yes | ||||||||
| (Including Profit) | C. AMENDMENTS | C. AMENDMENTS | C. AMENDMENTS | C. AMENDMENTS | |||||||||
| Lower Brushy Site 8 | 1 | 1 | 1 | 1 | |||||||||
| 7A | c. | D. | E. | F. | G. | H. | |||||||
| Item | 7B.. DESCRIPTION OF OFFERED ITEM | QTY. | UNIT | UNIT PRICE | GOV. ESTIMATE | PRICE | AMOUNT | PRICE | AMOUNT | PRICE | AMOUNT | PRICE | AMOUNT |
| 1 | Pollution Control | 1 | JB | $15,000.00 | $15,000.00 | $10,000.00 | $10,000.00 | $11,224.49 | $11,224.49 | $2,500.00 | $2,500.00 | $15,000.00 | $15,000.00 |
| 2 | Sediment Filters | 2,500 | LF | $3.00 | $7,500.00 | $2.00 | $5,000.00 | $1.68 | $4,200.00 | $2.00 | $5,000.00 | $2.00 | $5,000.00 |
| 3 | Vegetation, Sprigging | 9.0 | AC | $2,000.00 | $18,000.00 | $1,200.00 | $10,800.00 | $5,612.25 | $50,510.25 | $2,000.00 | $18,000.00 | $1,500.00 | $13,500.00 |
| 4 | construction surveys | 1 | JB | $30,000.00 | $30,000.00 | $8,000.00 | $8,000.00 | $7,612.24 | $7,612.24 | $5,000.00 | $5,000.00 | $15,000.00 | $15,000.00 |
| 5 | Mobilization & Demobilization | 1 | JB | $40,000.00 | $40,000.00 | $40,000.00 | $40,000.00 | $82,095.58 | $82,095.58 | $30,000.00 | $30,000.00 | $60,000.00 | $60,000.00 |
| 6 | Removal of Water | 1 | JB | $15,000.00 | $15,000.00 | $6,000.00 | $6,000.00 | $8,989.00 | $8,989.00 | $5,000.00 | $5,000.00 | $25,000.00 | $25,000.00 |
| 7 | Excavation, common;embankment | 11,463 | CY | $5.00 | $57,315.00 | $3.25 | $37,254.75 | $6.31 | $72,331.53 | $4.00 | $45,852.00 | $19.00 | $217,797.00 |
| 8 | Excavation, common; brem | 1,920 | CY | $6.00 | $11,520.00 | $3.25 | $6,240.00 | $2.53 | $4,857.60 | $5.00 | $9,600.00 | $19.00 | $36,480.00 |
| 9 | Earthfill | 2,031 | CY | $5.25 | $10,662.75 | $2.00 | $4,062.00 | $4.86 | $9,870.66 | $3.00 | $6,093.00 | $14.00 | $28,434.00 |
| 10 | Topsoil, Embankment | 11,119 | SY | $3.00 | $33,357.00 | $2.00 | $22,238.00 | $2.06 | $22,905.14 | $3.00 | $33,357.00 | $2.00 | $22,238.00 |
| 11 | Topsoil, Lime Processing Area | 12,140 | SY | $2.50 | $30,350.00 | $1.40 | $16,996.00 | $1.18 | $14,325.20 | $3.00 | $36,420.00 | $2.00 | $24,280.00 |
| 12 | Topsoil, Left & Right Abutments | 600 | SY | $5.00 | $3,000.00 | $2.00 | $1,200.00 | $2.00 | $1,200.00 | $3.00 | $1,800.00 | $2.00 | $1,200.00 |
| 13 | Lime-treated earthfill | 15,247 | CY | $8.00 | $121,976.00 | $6.60 | $100,630.20 | $5.29 | $80,656.63 | $8.00 | $121,976.00 | $11.00 | $167,717.00 |
| 14 | Furnishing & Handling Lime, quickline | 906 | TN | 150.00 | $135,900.00 | $120.00 | $108,720.00 | $145.00 | $131,370.00 | $140.00 | $126,840.00 | $158.00 | $143,148.00 |
| 15 | Fences, Barbed wire | 3,400 | LF | $5.00 | $17,000.00 | $5.00 | $17,000.00 | $8.00 | $27,200.00 | $5.00 | $17,000.00 | $8.00 | $27,200.00 |
| 16 | Contractor Quality Control | 1 | JB | $40,000.00 | $40,000.00 | $7,000.00 | $7,000.00 | $31,000.00 | $31,000.00 | $25,000.00 | $25,000.00 | $48,000.00 | $48,000.00 |
| 17 | Shaping | 1 | JB | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $3,000.00 | $3,000.00 | $10,000.00 | $10,000.00 | $15,000.00 | $15,000.00 |
| $499,438.00 | |||||||||||||
| Subtotal page 1: | $588,580.75 | $403,140.95 | $563,348.32 | ESB | $864,994.00 | ||||||||
| Small Business (SB); Small Disadvantaged Business (SDB); HUBZone Small Business Concern (HBC); Veteran-Owned (VO);Black Owned (OY); Native American Owned (NB) |
| FOR GOVERNMENT USE ONLY. | 1. SOLICITATION NUMBER | 2. DATE ISSUED | 3. DATE OPENED | PAGE | |||||
| ABSTRACT OF OFFERS - | AG-7442-S-10-0036 | 2/17/10 | 4/5/10 | 2 of 6 | |||||
| 4. ISSUING OFFICE | I CERTIFY that I have opened, | NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE) | |||||||
| USDA Natural Resources Conservation Service | read, and recorded on this abstract | Kathleen Pinckney | |||||||
| 101 South Main Street | all offers received in response to | Contracting Officer | |||||||
| Temple, Texas 76501-7602 | this solicitation. | SIGNATURE DATED: | DATE SIGNED | ||||||
| /s/ | 4/5/10 | ||||||||
| 5. PROJECT TITLE | 6. GOVERNMENT ESTIMATE | 7. OFFERS | |||||||
| (Check A, B, or C and complete D, E, and F) | NO. 1 | NO. 2 | NO. 3 | NO. 4 | |||||
| Upper Brushy Creek 29 & Lower Brushy Creek 8 | A. HIRED LABOR | A. OFFEROR | A. OFFEROR | A. OFFEROR | A. OFFEROR | ||||
| ARRA Funded Watershed Repairs | B. REASONABLE CONTRACT | Ranger Excavating | AMS Company, Inc | MAC, Inc | Austin Engineering Co, Inc | ||||
| (Without Profit) | Austin, TX | Cleburne, TX | Austin, TX | Austin, TX |
| B. BID SECURITY | B. BID SECURITY | B. BID SECURITY | B. BID SECURITY | ||||||||||
| 8. NUMBER OF AMENDMENTS ISSUED | C. REASONABLE CONTRACT | yes | yes | yes | yes | ||||||||
| (Including Profit) | C. AMENDMENTS | C. AMENDMENTS | C. AMENDMENTS | C. AMENDMENTS | |||||||||
| Upper Brushy Site 29 | 1 | 1 | 1 | 1 | |||||||||
| 7A | c. | D. | E. | F. | G. | H. | |||||||
| Item | 7B.. DESCRIPTION OF OFFERED ITEM | QTY. | UNIT | UNIT PRICE | GOV. ESTIMATE | PRICE | AMOUNT | PRICE | AMOUNT | PRICE | AMOUNT | PRICE | AMOUNT |
| 1 | Pollution Control | 1 | JB | $10,000.00 | $10,000.00 | $10,000.00 | $10,000.00 | $11,224.49 | $11,224.49 | $2,500.00 | $2,500.00 | $15,000.00 | $15,000.00 |
| 2 | Sediment Filters | 3,640 | LF | $3.00 | $10,920.00 | $2.00 | $7,280.00 | $1.68 | $6,115.20 | $2.00 | $7,280.00 | $2.00 | $7,280.00 |
| 3 | Vegetation,sprigging | 15.1 | AC | $2,000.00 | $30,200.00 | $1,200.00 | $18,120.00 | $5,612.25 | $84,744.98 | $2,000.00 | $30,200.00 | $1,500.00 | $22,650.00 |
| 4 | construction surveys | 1 | JB | $25,000.00 | $25,000.00 | $8,000.00 | $8,000.00 | 9612.24 | $9,612.24 | $10,000.00 | $10,000.00 | $10,000.00 | $10,000.00 |
| 5 | Mobilization & Demobilization | 1 | JB | $40,000.00 | $40,000.00 | $56,000.00 | $56,000.00 | $76,550.00 | $76,550.00 | $30,000.00 | $30,000.00 | $60,000.00 | $60,000.00 |
| 6 | Removal of Water | 1 | JB | $10,000.00 | $10,000.00 | $8,000.00 | $8,000.00 | $8,980.00 | $8,980.00 | $5,000.00 | $5,000.00 | $50,000.00 | $50,000.00 |
| 7 | Excavation, common, embankment | 19,664 | CY | $5.00 | $98,320.00 | $3.25 | $63,908.00 | $6.31 | $124,079.84 | $4.00 | $78,656.00 | $19.00 | $373,616.00 |
| 8 | Topsoil, Embankment | 20,352 | SY | $2.75 | $55,968.00 | $2.00 | $40,704.00 | $2.06 | $41,925.12 | $2.50 | $50,880.00 | $3.00 | $61,056.00 |
| 9 | Topsoil, Lime Processing Area | 17,337 | SY | $2.25 | $39,008.25 | $1.40 | $24,271.80 | $1.18 | $20,457.66 | $2.50 | $43,342.50 | $2.00 | $34,674.00 |
| 10 | Topsoil, Right Abutment | 2,739 | SY | $5.00 | $13,695.00 | $2.00 | $5,478.00 | $2.00 | $5,478.00 | $2.50 | $6,847.50 | $2.00 | $5,478.00 |
| 11 | Lime-treated earthfill | 19,658 | CY | $7.75 | $152,349.50 | $5.80 | $114,016.40 | $4.94 | $97,110.52 | $8.00 | $157,264.00 | $11.00 | $216,238.00 |
| 12 | Furnishing & Handling Lime, quickline | 1,168 | TN | $150.00 | $175,200.00 | $120.00 | $140,160.00 | $145.00 | $169,360.00 | $140.00 | $163,520.00 | $158.00 | $184,544.00 |
| 13 | Rock Rirpap | 125 | TN | $70.00 | $8,750.00 | $30.00 | $3,750.00 | $40.00 | $5,000.00 | $70.00 | $8,750.00 | $100.00 | $12,500.00 |
| 14 | Fences, Barbed wire | 6,839 | LF | $5.00 | $34,195.00 | $5.00 | $34,195.00 | $8.00 | $54,712.00 | $5.00 | $34,195.00 | $8.00 | $54,712.00 |
| 15 | Contractor Quality Control | 1 | JB | 40,000.00 | $40,000.00 | $7,000.00 | $7,000.00 | $31,000.00 | $31,000.00 | $30,000.00 | $30,000.00 | $48,000.00 | $48,000.00 |
| 16 | Shaping | 1 | JB | 5,000.00 | $5,000.00 | $2,000.00 | $2,000.00 | $3,000.00 | $3,000.00 | $10,000.00 | $10,000.00 | $15,000.00 | $15,000.00 |
| Subtotal page 2: | $748,605.75 | $542,883.20 | $749,350.05 | $668,435.00 | math error | $1,170,748.00 | |||||||
| Subtotal page 1: | $588,580.75 | $403,140.95 | $563,339.32 | $499,438.00 | $964,994.00 | ||||||||
| TOTAL: | $1,337,186.50 | $946,024.15 | $1,312,689.37 | $1,167,873.00 | $2,135,742.00 | ||||||||
| BID RANKING: | 1 | 5 | 2 | 9 | |||||||||
| BUSINESS TYPE: | LB | ESB/VO | ESB | ||||||||||
| Small Business (SB); Small Disadvantaged Business (SDB); HUBZone Small Business Concern (HBC); Veteran-Owned (VO);Black Owned (OY); Native American Owned (NB) |
| FOR GOVERNMENT USE ONLY. | 1. SOLICITATION NUMBER | 2. DATE ISSUED | 3. DATE OPENED | PAGE | |||||
| ABSTRACT OF OFFERS - | AG-7442-S-10-0036 | 2/17/10 | 4/5/10 | 3 of 6 | |||||
| 4. ISSUING OFFICE | I CERTIFY that I have opened, | NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE) | |||||||
| USDA Natural Resources Conservation Service | read, and recorded on this abstract | Kathleen Pinckney | |||||||
| 101 South Main Street | all offers received in response to | Contracting Officer | |||||||
| Temple, Texas 76501-7602 | this solicitation. | SIGNATURE DATED: | DATE SIGNED | ||||||
| /s/ | 4/5/10 | ||||||||
| 5. PROJECT TITLE | 6. GOVERNMENT ESTIMATE | 7. OFFERS | |||||||
| (Check A, B, or C and complete D, E, and F) | NO. 1 | NO. 2 | NO. 3 | NO. 4 | |||||
| Upper Brushy Creek 29 & Lower Brushy Creek 8 | A. HIRED LABOR | A. OFFEROR | A. OFFEROR | A. OFFEROR | A. OFFEROR | ||||
| ARRA Funded Watershed Repairs | B. REASONABLE CONTRACT | RGM Constructors, LP | Patin Construction LLC | AMBRECO, Ltd | Pitts Construction | ||||
| (Without Profit) | Pflugerville, TX | Taylor, TX | Belton, TX | Austin, TX |
| B. BID SECURITY | B. BID SECURITY | B. BID SECURITY | B. BID SECURITY | ||||||||||
| 8. NUMBER OF AMENDMENTS ISSUED | C. REASONABLE CONTRACT | yes | yes | yes | yes | ||||||||
| (Including Profit) | C. AMENDMENTS | C. AMENDMENTS | C. AMENDMENTS | C. AMENDMENTS | |||||||||
| Lower Brushy Site 8 | 1 | 1 | 1 | 1 | |||||||||
| 7A | c. | D. | E. | F. | 1 | H. | |||||||
| Item | 7B.. DESCRIPTION OF OFFERED ITEM | QTY. | UNIT | UNIT PRICE | GOV. ESTIMATE | PRICE | AMOUNT | PRICE | AMOUNT | PRICE | AMOUNT | PRICE | AMOUNT |
| 1 | Pollution Control | 1 | JB | $15,000.00 | $15,000.00 | $20,000.00 | $20,000.00 | $10,000.00 | $10,000.00 | $12,941.00 | $12,941.00 | $3,000.00 | $3,000.00 |
| 2 | Sediment Filters | 2,500 | LF | $3.50 | $8,750.00 | $2.50 | $6,250.00 | $2.00 | $5,000.00 | $2.34 | $5,850.00 | $2.50 | $6,250.00 |
| 3 | Vegetation, Sprigging | 9.0 | AC | $2,000.00 | $18,000.00 | $1,500.00 | $13,500.00 | $500.00 | $4,500.00 | $1,150.00 | $10,350.00 | $1,250.00 | $11,250.00 |
| 4 | construction surveys | 1 | JB | $20,000.00 | $20,000.00 | $10,000.00 | $10,000.00 | $2,500.00 | $2,500.00 | $12,222.00 | $12,222.00 | $5,250.00 | $5,250.00 |
| 5 | Mobilization & Demobilization | 1 | JB | $50,000.00 | $50,000.00 | $45,000.00 | $45,000.00 | $15,000.00 | $15,000.00 | $45,313.00 | $45,313.00 | $3,000.00 | $3,000.00 |
| 6 | Removal of Water | 1 | JB | $10,000.00 | $10,000.00 | $270,000.00 | $270,000.00 | $15,000.00 | $15,000.00 | $10,049.00 | $10,049.00 | $5,200.00 | $5,200.00 |
| 7 | Excavation, common;embankment | 11,463 | CY | $6.25 | $71,643.75 | $4.00 | $45,852.00 | $4.00 | $45,852.00 | $3.08 | $35,306.04 | $4.00 | $45,852.00 |
| 8 | Excavation, common; brem | 1,920 | CY | $3.50 | $6,720.00 | $5.00 | $9,600.00 | $5.00 | $9,600.00 | $2.72 | $5,222.40 | $2.00 | $3,840.00 |
| 9 | Earthfill | 2,031 | CY | $3.00 | $6,093.00 | $4.50 | $9,139.50 | $10.00 | $20,310.00 | $4.07 | $8,266.17 | $4.00 | $8,124.00 |
| 10 | Topsoil, Embankment | 11,119 | SY | $8.00 | $88,952.00 | $2.00 | $22,238.00 | $8.00 | $88,952.00 | $2.47 | $27,463.93 | $2.00 | $22,238.00 |
| 11 | Topsoil, Lime Processing Area | 12,140 | SY | $150.00 | $1,821,000.00 | $1.50 | $18,210.00 | $8.00 | $97,120.00 | $2.06 | $25,008.40 | $2.00 | $24,280.00 |
| 12 | Topsoil, Left & Right Abutments | 600 | SY | $5.00 | $3,000.00 | $3.00 | $1,800.00 | $8.00 | $4,800.00 | $8.32 | $4,992.00 | $2.00 | $1,200.00 |
| 13 | Lime-treated earthfill | 15,247 | CY | 40,000.00 | $609,880,000.00 | $10.00 | $152,470.00 | $12.00 | $182,964.00 | $5.87 | $89,499.89 | $8.25 | $125,787.75 |
| 14 | Furnishing & Handling Lime, quickline | 906 | TN | $197.00 | $178,482.00 | $220.00 | $199,320.00 | $174.50 | $158,097.00 | $120.00 | $108,720.00 | ||
| 15 | Fences, Barbed wire | 3,400 | LF | $611,999,158.75 | $6.00 | $20,400.00 | $6.00 | $20,400.00 | $6.19 | $21,046.00 | $5.00 | $17,000.00 | |
| 16 | Contractor Quality Control | 1 | JB | $412,359.50 | $35,000.00 | $35,000.00 | $20,000.00 | $20,000.00 | $57,717.17 | $57,717.17 | $40,000.00 | $40,000.00 | |
| 17 | Shaping | 1 | JB | $612,411,518.25 | $10,000.00 | $10,000.00 | $15,000.00 | $15,000.00 | $6,790.00 | $6,790.00 | $45,000.00 | $45,000.00 | |
| math error | |||||||||||||
| Subtotal page 1: | $867,941.50 | $756,318.00 | $536,134.00 | math error | $475,991.75 | ||||||||
| Small Business (SB); Small Disadvantaged Business (SDB); HUBZone Small Business Concern (HBC); Veteran-Owned (VO);Black Owned (OY); Native American Owned (NB) |
| FOR GOVERNMENT USE ONLY. | 1. SOLICITATION NUMBER | 2. DATE ISSUED | 3. DATE OPENED | PAGE | |||||
| ABSTRACT OF OFFERS - | AG-7442-S-10-0036 | 2/17/10 | 4/5/10 | 4 of 6 | |||||
| 4. ISSUING OFFICE | I CERTIFY that I have opened, | NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE) | |||||||
| USDA Natural Resources Conservation Service | read, and recorded on this abstract | Kathleen Pinckney | |||||||
| 101 South Main Street | all offers received in response to | Contracting Officer | |||||||
| Temple, Texas 76501-7602 | this solicitation. | SIGNATURE DATED: | DATE SIGNED | ||||||
| /s/ | 4/5/10 | ||||||||
| 5. PROJECT TITLE | 6. GOVERNMENT ESTIMATE | 7. OFFERS | |||||||
| (Check A, B, or C and complete D, E, and F) | NO. 1 | NO. 2 | NO. 3 | NO. 4 | |||||
| Upper Brushy Creek 29 & Lower Brushy Creek 8 | A. HIRED LABOR | A. OFFEROR | A. OFFEROR | A. OFFEROR | A. OFFEROR | ||||
| ARRA Funded Watershed Repairs | B. REASONABLE CONTRACT | RGM Constructors, LP | Patin Construction LLC | AMBRECO, Ltd | Pitts Construction | ||||
| (Without Profit) | Pflugerville, TX | Taylor, TX | Belton, TX | Austin, TX |
| B. BID SECURITY | B. BID SECURITY | B. BID SECURITY | B. BID SECURITY | ||||||||||
| 8. NUMBER OF AMENDMENTS ISSUED | C. REASONABLE CONTRACT | yes | yes | yes | yes | ||||||||
| (Including Profit) | C. AMENDMENTS | C. AMENDMENTS | C. AMENDMENTS | C. AMENDMENTS | |||||||||
| Lower Brushy Site 8 | 1 | 1 | 1 | 1 | |||||||||
| 7A | c. | D. | E. | F. | G. | H. | |||||||
| Item | 7B.. DESCRIPTION OF OFFERED ITEM | QTY. | UNIT | UNIT PRICE | GOV. ESTIMATE | PRICE | AMOUNT | PRICE | AMOUNT | PRICE | AMOUNT | PRICE | AMOUNT |
| 1 | Pollution Control | 1 | JB | $10,000.00 | $10,000.00 | $90,000.00 | $90,000.00 | $20,000.00 | $20,000.00 | $12,092.00 | $12,092.00 | $7,500.00 | $7,500.00 |
| 2 | Sediment Filters | 3,640 | LF | $3.00 | $10,920.00 | $2.50 | $9,100.00 | $2.00 | $7,280.00 | $2.33 | $8,481.20 | $2.50 | $9,100.00 |
| 3 | Vegetation,sprigging | 15.1 | AC | $2,000.00 | $30,200.00 | $1,500.00 | $22,650.00 | $500.00 | $7,550.00 | $1,142.00 | $17,244.20 | $1,250.00 | $18,875.00 |
| 4 | construction surveys | 1 | JB | $25,000.00 | $25,000.00 | $15,000.00 | $15,000.00 | $4,000.00 | $4,000.00 | $12,135.00 | $12,135.00 | $10,000.00 | $10,000.00 |
| 5 | Mobilization & Demobilization | 1 | JB | $40,000.00 | $40,000.00 | $15,000.00 | $15,000.00 | $15,000.00 | $15,000.00 | $73,909.00 | $73,909.00 | $40,000.00 | $40,000.00 |
| 6 | Removal of Water | 1 | JB | $10,000.00 | $10,000.00 | $300,000.00 | $300,000.00 | $20,000.00 | $20,000.00 | $9,978.00 | $9,978.00 | $7,500.00 | $7,500.00 |
| 7 | Excavation, common, embankment | 19,664 | CY | $5.00 | $98,320.00 | $3.50 | $68,824.00 | $4.00 | $78,656.00 | $2.86 | $56,239.04 | $4.00 | $78,656.00 |
| 8 | Topsoil, Embankment | 20,352 | SY | $2.75 | $55,968.00 | $2.00 | $40,704.00 | $8.00 | $162,816.00 | $2.13 | $43,349.76 | $2.00 | $40,704.00 |
| 9 | Topsoil, Lime Processing Area | 17,337 | SY | $2.25 | $39,008.25 | $1.50 | $26,005.50 | $8.00 | $138,696.00 | $2.13 | $36,927.81 | $2.00 | $34,674.00 |
| 10 | Topsoil, Right Abutment | 2,739 | SY | $5.00 | $13,695.00 | $3.00 | $8,217.00 | $8.00 | $21,912.00 | $1.50 | $4,108.50 | $2.00 | $5,478.00 |
| 11 | Lime-treated earthfill | 19,658 | CY | $7.75 | $152,349.50 | $10.00 | $196,580.00 | $12.00 | $235,896.00 | $6.97 | $137,016.26 | $8.25 | $162,178.50 |
| 12 | Furnishing & Handling Lime, quickline | 1,168 | TN | $150.00 | $175,200.00 | $195.00 | $227,760.00 | $220.00 | $256,960.00 | $173.27 | $202,379.36 | $120.00 | $140,160.00 |
| 13 | Rock Rirpap | 125 | TN | $70.00 | $8,750.00 | $25.00 | $3,125.00 | $100.00 | $12,500.00 | $33.71 | $4,213.75 | $74.00 | $9,250.00 |
| 14 | Fences, Barbed wire | 6,839 | LF | $5.00 | $34,195.00 | $6.00 | $41,034.00 | $6.00 | $41,034.00 | $3.54 | $24,210.06 | $5.00 | $34,195.00 |
| 15 | Contractor Quality Control | 1 | JB | 40,000.00 | $40,000.00 | $35,000.00 | $35,000.00 | $25,000.00 | $25,000.00 | $68,817.06 | $68,817.06 | $50,000.00 | $50,000.00 |
| 16 | Shaping | 1 | JB | 5,000.00 | $5,000.00 | $10,000.00 | $10,000.00 | $30,000.00 | $30,000.00 | $6,742.00 | $6,742.00 | $61,000.00 | $61,000.00 |
| Subtotal page 2: | $748,605.75 | $1,108,999.50 | math error | $1,077,300.00 | $10,000.00 | $717,843.00 | $709,270.50 | ||||||
| Subtotal page 1: | $588,580.75 | math error | $867,941.50 | $756,318.00 | $536,134.00 | math error | $475,991.75 | ||||||
| TOTAL: | $1,337,186.50 | $1,976,941.00 | $1,833,618.00 | $1,253,977.00 | $1,185,262.25 | ||||||||
| BID RANKING: | 8 | 7 | 4 | 3 | |||||||||
| BUSINESS TYPE: | ESB | WO/ESB | |||||||||||
| Small Business (SB); Small Disadvantaged Business (SDB); HUBZone Small Business Concern (HBC); Veteran-Owned (VO);Black Owned (OY); Native American Owned (NB) |
| FOR GOVERNMENT USE ONLY. | 1. SOLICITATION NUMBER | 2. DATE ISSUED | 3. DATE OPENED | PAGE | |||||
| ABSTRACT OF OFFERS - | AG-7442-S-10-0036 | 2/17/10 | 4/5/10 | 5 of 6 | |||||
| 4. ISSUING OFFICE | I CERTIFY that I have opened, | NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE) | |||||||
| USDA Natural Resources Conservation Service | read, and recorded on this abstract | Kathleen Pinckney | |||||||
| 101 South Main Street | all offers received in response to | Contracting Officer | |||||||
| Temple, Texas 76501-7602 | this solicitation. | SIGNATURE DATED: | DATE SIGNED | ||||||
| /s/ | 4/5/10 | ||||||||
| 5. PROJECT TITLE | 6. GOVERNMENT ESTIMATE | 7. OFFERS | |||||||
| (Check A, B, or C and complete D, E, and F) | NO. 1 | NO. 2 | NO. 3 | NO. 4 | |||||
| Upper Brushy Creek 29 & Lower Brushy Creek 8 | A. HIRED LABOR | A. OFFEROR | A. OFFEROR | A. OFFEROR | A. OFFEROR | ||||
| ARRA Funded Watershed Repairs | B. REASONABLE CONTRACT | Brazos Valley Contracting | |||||||
| (Without Profit) | Waco, TX |
| B. BID SECURITY | B. BID SECURITY | B. BID SECURITY | B. BID SECURITY | ||||||||||
| 8. NUMBER OF AMENDMENTS ISSUED | C. REASONABLE CONTRACT | yes | |||||||||||
| (Including Profit) | C. AMENDMENTS | C. AMENDMENTS | C. AMENDMENTS | C. AMENDMENTS | |||||||||
| Lower Brushy Site 8 | 1 | ||||||||||||
| 7A | c. | D. | E. | F. | G. | H. | |||||||
| Item | 7B.. DESCRIPTION OF OFFERED ITEM | QTY. | UNIT | UNIT PRICE | GOV. ESTIMATE | PRICE | AMOUNT | PRICE | AMOUNT | PRICE | AMOUNT | PRICE | AMOUNT |
| 1 | Pollution Control | 1 | JB | $15,000.00 | $15,000.00 | $10,000.00 | $10,000.00 | ||||||
| 2 | Sediment Filters | 2,500 | LF | $3.00 | $7,500.00 | $3.00 | $7,500.00 | ||||||
| 3 | Vegetation, Sprigging | 9.0 | AC | $2,000.00 | $18,000.00 | $1,500.00 | $13,500.00 | ||||||
| 4 | construction surveys | 1 | JB | $30,000.00 | $30,000.00 | $10,000.00 | $10,000.00 | ||||||
| 5 | Mobilization & Demobilization | 1 | JB | $40,000.00 | $40,000.00 | $25,000.00 | $25,000.00 | ||||||
| 6 | Removal of Water | 1 | JB | $15,000.00 | $15,000.00 | $10,000.00 | $10,000.00 | ||||||
| 7 | Excavation, common;embankment | 11,463 | CY | $5.00 | $57,315.00 | $4.50 | $51,583.50 | ||||||
| 8 | Excavation, common; brem | 1,920 | CY | $6.00 | $11,520.00 | $4.00 | $7,680.00 | ||||||
| 9 | Earthfill | 2,031 | CY | $5.25 | $10,662.75 | $4.00 | $8,124.00 | ||||||
| 10 | Topsoil, Embankment | 11,119 | SY | $3.00 | $33,357.00 | $2.00 | $22,238.00 | ||||||
| 11 | Topsoil, Lime Processing Area | 12,140 | SY | $2.50 | $30,350.00 | $1.50 | $18,210.00 | ||||||
| 12 | Topsoil, Left & Right Abutments | 600 | SY | $5.00 | $3,000.00 | $2.00 | $1,200.00 | ||||||
| 13 | Lime-treated earthfill | 15,247 | CY | $8.00 | $121,976.00 | $15.00 | $228,705.00 | ||||||
| 14 | Furnishing & Handling Lime, quickline | 906 | TN | 150.00 | $135,900.00 | $150.00 | $135,900.00 | ||||||
| 15 | Fences, Barbed wire | 3,400 | LF | $5.00 | $17,000.00 | $5.00 | $17,000.00 | ||||||
| 16 | Contractor Quality Control | 1 | JB | $40,000.00 | $40,000.00 | $50,000.00 | $50,000.00 | ||||||
| 17 | Shaping | 1 | JB | $2,000.00 | $2,000.00 | $3,000.00 | $3,000.00 |
| Subtotal page 1: | $588,580.75 | $619,640.50 | |
| Small Business (SB); Small Disadvantaged Business (SDB); HUBZone Small Business Concern (HBC); Veteran-Owned (VO);Black Owned (OY); Native American Owned (NB) |
| FOR GOVERNMENT USE ONLY. | 1. SOLICITATION NUMBER | 2. DATE ISSUED | 3. DATE OPENED | PAGE | |||||
| ABSTRACT OF OFFERS - | AG-7442-S-10-0036 | 2/17/10 | 4/5/10 | 6 of 6 | |||||
| 4. ISSUING OFFICE | I CERTIFY that I have opened, | NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE) | |||||||
| USDA Natural Resources Conservation Service | read, and recorded on this abstract | Kathleen Pinckney | |||||||
| 101 South Main Street | all offers received in response to | Contracting Officer | |||||||
| Temple, Texas 76501-7602 | this solicitation. | SIGNATURE DATED: | DATE SIGNED | ||||||
| /s/ | 4/5/10 | ||||||||
| 5. PROJECT TITLE | 6. GOVERNMENT ESTIMATE | 7. OFFERS | |||||||
| (Check A, B, or C and complete D, E, and F) | NO. 1 | NO. 2 | NO. 3 | NO. 4 | |||||
| Upper Brushy Creek 29 & Lower Brushy Creek 8 | A. HIRED LABOR | A. OFFEROR | A. OFFEROR | A. OFFEROR | A. OFFEROR | ||||
| ARRA Funded Watershed Repairs | B. REASONABLE CONTRACT | Brazos Valley Contracting | |||||||
| (Without Profit) | Waco, TX |
| B. BID SECURITY | B. BID SECURITY | B. BID SECURITY | B. BID SECURITY | ||||||||||
| 8. NUMBER OF AMENDMENTS ISSUED | C. REASONABLE CONTRACT | yes | |||||||||||
| (Including Profit) | C. AMENDMENTS | C. AMENDMENTS | C. AMENDMENTS | C. AMENDMENTS | |||||||||
| Upper Brushy Site 29 | 1 | ||||||||||||
| 7A | c. | D. | E. | F. | G. | H. | |||||||
| Item | 7B.. DESCRIPTION OF OFFERED ITEM | QTY. | UNIT | UNIT PRICE | GOV. ESTIMATE | PRICE | AMOUNT | PRICE | AMOUNT | PRICE | AMOUNT | PRICE | AMOUNT |
| 1 | Pollution Control | 1 | JB | $10,000.00 | $10,000.00 | $10,000.00 | $10,000.00 | ||||||
| 2 | Sediment Filters | 3,640 | LF | $3.00 | $10,920.00 | $3.00 | $10,920.00 | ||||||
| 3 | Vegetation,sprigging | 15.1 | AC | $2,000.00 | $30,200.00 | $1,500.00 | $22,650.00 | ||||||
| 4 | construction surveys | 1 | JB | $25,000.00 | $25,000.00 | $10,000.00 | $10,000.00 | ||||||
| 5 | Mobilization & Demobilization | 1 | JB | $40,000.00 | $40,000.00 | $25,000.00 | $25,000.00 | ||||||
| 6 | Removal of Water | 1 | JB | $10,000.00 | $10,000.00 | $10,000.00 | $10,000.00 | ||||||
| 7 | Excavation, common, embankment | 19,664 | CY | $5.00 | $98,320.00 | $4.50 | $88,488.00 | ||||||
| 8 | Topsoil, Embankment | 20,352 | SY | $2.75 | $55,968.00 | $2.00 | $40,704.00 | ||||||
| 9 | Topsoil, Lime Processing Area | 17,337 | SY | $2.25 | $39,008.25 | $1.50 | $26,005.50 | ||||||
| 10 | Topsoil, Right Abutment | 2,739 | SY | $5.00 | $13,695.00 | $2.00 | $5,478.00 | ||||||
| 11 | Lime-treated earthfill | 19,658 | CY | $7.75 | $152,349.50 | $15.00 | $294,870.00 | ||||||
| 12 | Furnishing & Handling Lime, quickline | 1,168 | TN | $150.00 | $175,200.00 | $150.00 | $175,200.00 | ||||||
| 13 | Rock Rirpap | 125 | TN | $70.00 | $8,750.00 | $70.00 | $8,750.00 | ||||||
| 14 | Fences, Barbed wire | 6,839 | LF | $5.00 | $34,195.00 | $5.00 | $34,195.00 | ||||||
| 15 | Contractor Quality Control | 1 | JB | 40,000.00 | $40,000.00 | $50,000.00 | $50,000.00 | ||||||
| 16 | Shaping | 1 | JB | 5,000.00 | $5,000.00 | $3,000.00 | $3,000.00 | ||||||
| Subtotal page 2: | $748,605.75 | $815,260.50 | |||||||||||
| Subtotal page 1: | $588,580.75 | $619,640.50 | |||||||||||
| TOTAL: | $1,337,186.50 | $1,434,901.00 | |||||||||||
| BID RANKING: | 6 | ||||||||||||
| BUSINESS TYPE: | ESB | ||||||||||||
| Small Business (SB); Small Disadvantaged Business (SDB); HUBZone Small Business Concern (HBC); Veteran-Owned (VO);Black Owned (OY); Native American Owned (NB) |