Ready Relevant Learning (RRL)

Closed Solicitation Posted

A newer solicitation was posted. See the latest solicitation from .

Solicitation number
N6883624Q0008A0002
Agency
Naval Supply Systems Command Department of the Navy, Department of Defense
Responses due
Set-aside
Service-Disabled Veteran-Owned Small Business

Opportunity facts

NAICS code
561499 All Other Business Support Services
PSC
R699 Support- Administrative: Other
Place of performance
Panama City Beach, Florida 32407, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation from the Department of the Navy Naval Supply Systems Command seeks proposals to provide Ready Relevant Learning support services for the Center for Explosive Ordnance Disposal and Diving. Offerors must meet qualifications for program management, technical writing, graphic design, data management, and EOD and diving process facilitation. Proposals will be evaluated based on technical approach, past performance, and price. Questions are due by January 19, 2024.

The opportunity is set aside for Service-Disabled Veteran-Owned Small Businesses. The predominate NAICS code is 611430 and PSC code is R499. The single place of performance is located in Panama City Beach, Florida. The amendment provides clarification on questions regarding contractor versus government-furnished equipment and facilities, subcontractor documentation and past performance submissions, page limits, and applicable wage determinations.

Notice text

Amendment 002 is to answer industry's question. 

Part 4.1 of the PWS states the Government will provide equipment, utilities, materials, and facilities, etc. Part 1 and Part 5 states the Contractor will provide these.

  1. Can the Government state specifically what equipment / instruments/ materials/ supplies / facilities, if any, are offerors required to provide for this contract?

Answer: “The government shall amend PWS Part 5.1.1. to clarify that the Contractor shall provide all labor, supervision, transportation, vehicles, supplies, equipment, material, facilities, and services not listed in Part 4. The government shall only furnish the property, equipment, and services listed in Part 4.” 

  1. Moreover, if any, recommend the Government allow for ODCs within the pricing quote. If none are required, recommend the Government remove “transportation, vehicles, supplies, equipment, materials, facilities, etc.” from this statement in all applicable sections.

Answer: The Government will not alter the existing CLIN structure.

  1. Were sections 2.5 and 2.6 of the PWS Part 2 left out intentionally?

Answer: There are no sections 2.5 or 2.6. The Government will revised this typo.

  1. Can the Government confirm that a link will be posted to this SAM solicitation that provides access to an electronic exchange portal where vendors can easily submit all volumes?

Otherwise, recommend that the Government accept offers through email to the CS/KO.

Answer: Yes, quotes may be received by email to the Contract Specialist Joseph Tolbert at joseph.d.tolbert.civ@us.mil and the Contracting Officer Rolondo Turner at Rolondo.r.turner.civ@us.navy.mil.

  1. Are offerors permitted to include a TOC, Compliance Matrix, and List of Tables & Figures within each volume and is the page count limit exclusive of all?

Answer: A table of contents and list of tables can be excluded from the page limit.

  1. What supporting documents are required for Subcontractors performing more than 10% of workshare?

Answer: “No supporting documents are required beyond the Limitations on Subcontracting certification.”

  1. Can past performance also be submitted for Subcontractors performing more than 10% of workshare?

Answer: “Subcontractor past performance will not be considered.”

  1. Moreover, if so, are consent and client authorization letters required?

Answer: “Subcontractor past performance will not be considered.”

  1. Can Subcontractors providing their past performance as a reference for Volume III submit their CPARS directly to the CS/KO, or does the Prime Offeror need to submit them?

Answer: “Subcontractor past performance will not be considered.”

  1. Will the Government allow offerors to submit a condensed version of the QCP within Volume II, considering the 10-page limit, and the complete version within 5 days upon award?

Answer: See PWS – (will not affect the 10-page limit) a complete version is required within the 5 days of award.

  1. Is this an SCA contract? (WD reference pg 82 of Final RFQ)

Answer: “Yes, this is an SCA contract.”

The Data Management/Integration Quals, Ed, Cert. listed is identical to the requirements for the Graphic Design/Web Content qualifications.

  1. Is this a mistake, and if so, please provide the correct qual/ed/certs for this position.

Answer: 2.2.1.1Qualifications, Educations, and Experience.

  1. Qualifications – Qualified US Navy Master Diver, US Navy Master EOD Technician, or EOD Officer (O3 or above).
  2. Experience.  Have minimum two (2) years of experience at a NETC Learning Center.  Have a minimum of two (2) years of experience with the EOD and ND Supply Chain Working Group (SCWG) process and requirements. 
  3. Have minimum two (2) years of experience with the NETC End to End process (Job Duty Task Analysis, Front End Analysis, Integrated Master Schedule and Master Plan, and Business Case Analysis).
  4. Minimum one (1) year experience with Program Objective Memorandum (POM) process and requirements.
  5. Ability to communicate effectively, concisely and authoritatively in English both orally and in writing.  Experience in preparing correspondence, written reports, and briefs.
  6. Ability to use databases and manipulate spreadsheets, fluent in Microsoft Office products such as Excel, and Word.  

For the 6 positions listed, The Program Lead, EOD Process Facilitator, & ND Process Facilitator all have an estimated workload of 2080hrs/year; however, no estimated workload is listed for Technical writing, graphic design/web content, or Data management/Integration.

  1. Will the government provide an estimated annual workload for these positions as well?

Answer: NOTE: Historical workload averages 690 per position in base year with expectation of 2080 hours annually per position in each option years). 

Section 2.4.3.1 Qualifications, Educations, and Experience for Data Management/Integration has the same description as the section above 2.4.2.1, Qualifications, Educations, and Experience for Graphic design/Web content.

  1. Looks to be a “cut and paste” error.  Will the Govt. pls update Section 2.4.3.1 with the appropriate information?

Answer: Same response as question 12.

Most of the positions are identified to be place of work Bay County however, the Okaloosa County wage determination is the only contained in the solicitation.  Our assumption is we should price positions in Bay County using the wage determination for that locale. 

  1. Will the Govt. pls amend and add the Bay County WD?

Answer: The EOD Process Facilitator will work out of Okaloosa Countyand is subject to the Okaloosa SCA Wage Determination.  In addition, the other positions will be Bay County. Bay Co. wage determination will be added for the five positions.

Attachments

Files attached to this notice, newest first
File Type Posted
2.11 002 RFQAmend.pdf PDF

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Ready Relevant Learning (RRL) Latest solicitation Solicitation
Ready Relevant Learning (RRL) Solicitation
Ready Relevant Learning (RRL) This notice Solicitation
Ready Relevant Learning (RRL) Solicitation
Ready Relevant Learning (RRL) Solicitation
Ready Relevant Learning (RRL) Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity