Reaches 21 Utility Potholing
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 140R4025Q0014
- Agency
- Bureau of Reclamation Department of the Interior
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238910 Site Preparation Contractors
- Points of contact
-
- Brittney Nielson bnielson@usbr.gov
- Philoma Singer psinger@usbr.gov (505) 324-5033
Notice details come from SAM.gov. Updated .
About this opportunity
The Bureau of Reclamation is seeking utility potholing services for the Navajo-Gallup Water Supply Project, specifically for Reach 21 and Reach 2 near Farmington, New Mexico. The solicitation requires a contractor to locate and verify underground utilities at six specific locations, including Enterprise Products gas lines, an NTUA water line, and a Farmers Mutual Ditch irrigation line. Contractors must use air or hydro-excavation techniques to expose utilities for GPS survey measurements, with requirements to backfill holes and submit a Job Hazard Analysis prior to work commencement. The evaluation will prioritize price over technical capability and past performance, with proposals due by January 17, 2025, at 5:00 PM EST. A mandatory site visit was originally scheduled for January 2, 2025, at the Bureau of Reclamation facility in Farmington, New Mexico.
The contract is set aside exclusively for small businesses under NAICS code 238910 with a size standard of $19 million. The period of performance is from January 15, 2025, to February 15, 2025, with an estimated work duration of 1-3 business days and two required mobilizations. While specific award value is not explicitly stated, the solicitation indicates the work involves potholing at six locations with contractors required to provide per-hole pricing that includes all associated costs. The work will be performed in San Juan County, New Mexico, specifically around the Reach 21 Regulating Tank 3 site and one location at Reach 2. The Bureau of Reclamation will provide surveyors to record utility data, and contractors must handle their own water, waste disposal, and implement necessary traffic control measures during the project.
Notice text
Reaches 21 Utility Potholing
Attachments
| File | Type | Posted |
|---|---|---|
| Sol_140R4025Q0014_Amd_0004.pdf | ||
| Sol_140R4025Q0014_Amd_0003.pdf | ||
| Sol_140R4025Q0014_Amd_0002.pdf | ||
| Sol_140R4025Q0014_Amd_0001.pdf | ||
| Sol_140R4025Q0014.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Reaches 21 & Reach 2 Utility Potholing | Award Notice | |
| Reaches 21 Utility Potholing | Solicitation | |
| Reaches 21 Utility Potholing | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity