Radar Warning Systems (RWR) Integration Program
Closed Pre-Solicitation Posted
- Solicitation number
- FA8553-26-C130H_AN-ALR-69
- Agency
-
AFLCMC Robins AFB
Lifecycle Management Center, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 336411 Aircraft Manufacturing
- PSC
- Not on record
- Place of performance
- Bydgoszcz Kujawsko-Pomorskie Poland
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Air Force Materiel Command Lifecycle Management Center at Robins Air Force Base is conducting market research to gather information for a C-130 Foreign Military Sales (FMS) Radar Warning Systems (RWR) Integration Program. The procurement involves integrating AN/ALR-69 radar warning systems into two Partner Nation C-130H aircraft, requiring comprehensive engineering design, manufacturing, installation, testing, and certification activities. Contractors must demonstrate capability in system integration, technical documentation development, ground and flight testing coordination, and application of specific technical order modifications. Responses must be submitted in three parts: a Contractor Questionnaire addressing business information and capabilities, a Technical Solution describing the integration approach and technical considerations, and Financial Information providing past contract history or estimated pricing. The deadline for submission is 11:00 PM EST on Monday, March 16, 2026, with inquiries directed to primary contact Adrienne Taylor or alternates Melody Wimberly and Jason Timothy at the specified Air Force email addresses.
This is a Sources Sought Synopsis for market research and planning purposes only, not a formal solicitation, and participation does not guarantee future contract awards or solicitation participation. No set-aside designations have been applied to this opportunity. The notice does not identify any incumbent contractors or provide a specific award value or budget range, as the government is developing a cost estimate to support the acquisition strategy. The requirement encompasses integration work on two C-130H aircraft with deliverables including Kit A for system integration, Trial Kit Installation support, technical documentation, support equipment, and coordination of comprehensive testing activities. The government emphasizes that only non-classified information should be submitted and that responses must conform to the specified format to ensure review and consideration for government use.
Notice text
C-130 Foreign Military Sales Radar Warning Systems (RWR) Integration Program
Agency: Department of the Air Force
Office: AFLCMC/WLNI, Location: Robins Air Force Base, GA
Contracting POCs:
- Primary: Adrienne Taylor at: adrienne.taylor.3@us.af.mil
- Alternate: Melody Wimberly at: melody.wimberly@us.af.mil
- Alternate: Jason Timothy at: jason.timothy.4@us.af.mil
CAUTION: This is not a solicitation but rather market research to determine potential program costs, schedule, and information for planning purposes only. The level of security clearance and amount of foreign participation in this requirement has not been determined. Contractors/Institutions responding to this market research are placed on notice that participation in this survey may not ensure participation in future solicitations or contract awards. The government will not reimburse participants for any expenses associated with their participation in this survey. Only non-classified information shall be provided in your response. Copies of the submitted information may be reproduced for Government review.
The Government is preparing documentation to respond to a Partner Nation request for information and potentially move forward with an acquisition strategy. To meet this requirement, the United States Air Force (USAF) needs to accomplish a Government Cost Estimate. This Sources Sought Synopsis (Sources Sought) is for information and budget planning only, and neither constitutes a solicitation, nor a commitment by either the Government or the Sources Sought respondent.
The Government requests all submissions fully address the requirements in this Sources Sought and conform to the format discussed later in this Sources Sought. Submitted data not complying with the requested format may not be reviewed for Government use.
Finally, this Sources Sought seeks knowledge of any anticipated teaming arrangements, along with a description of similar services offered to the Government and to commercial customers for the past five years.
PROGRAM DETAILS: The Government is conducting Market Research to identify qualified Contractors to accomplish Integration of AN/ALR-69 on two (2) Partner Nation C-130H aircraft. The scope of the effort will require a Contractor to perform, provide, and/or support activities pertaining to design, integration, installation, ground test, flight test, certification, documentation, delivery, of two (2) modified C-130H aircraft.
This AN/ALR-69 Integration Program includes the following requirements:
- The vendor shall be responsible for completing the engineering design activities required for the kit to interface with the current C-130H aircraft configuration. The Kit A will be provided by the Contractor, and when combined with the Partner Nation’s Kit B, will allow the Government to install an AN/ALR-69 Operational Flight Program (OFP).
- Upon completion of Kit A development per the agreed upon schedule, Trial Kit Installation (TKI) shall be accomplished. The purpose of the TKI is to prove the validity of the installation design, completeness of material content, system performance through specified testing, and validation of the Technical Data Package (TDP). The Contractor shall furnish all manpower, parts, and materials for the manufacture, installation, and support of the TKI of Kit A and Government furnished Kit B. This shall include any test equipment required. TKI will include a fit check of the Kit A and required testing. The Contractor shall complete the retrofit of the TKI aircraft if any configuration items require a design change which cannot be incorporated during the TKI or post-TKI.
- The Contractor shall package, store, and ship all kits. Using the most current version of MIL-STD-2073-1 as guidance, the Contractor shall ensure packing and preservation methods are utilized to protect material/items against corrosion, physical and mechanical damage, and other forms of degradation during storage, handling and shipment. Furthermore, Contractor shall ensure all items arrive at the destination corrosion free in a safe and undamaged condition. Packaged kits shall be kept in a dedicated bonded storage area provided by the Contractor in preparation for shipment.
- The Contractor shall provide all support equipment required for the installation, integration, ground, and flight testing.
- The Contractor shall be responsible for coordinating support needed for ground and flight testing.
- The Contractor shall be responsible for developing and acquiring all technical documentation associated with the integration (e.g., installation drawings, technical manuals, test plan and test reports) required for airworthiness certification.
- The vendor shall be responsible for the application and modification of the following TCTO: 1C-130-1479.
GOVERNMENT REQUEST: Interested Contractors need to submit a letter of interest and responses per the below Government response format. The Government will use this information to help determine the best acquisition strategy for this program.
Interested offerors should send Sources Sought responses to the Contracting POCs listed. Responses should be submitted by 11:00PM EST, Monday, 16 March 2026. Responses must be sent via email to the following email addresses:
- Primary: Adrienne Taylor at: adrienne.taylor.3@us.af.mil
- Alternate: Melody Wimberly at: melody.wimberly@us.af.mil
- Alternate: Jason Timothy at: jason.timothy.4@us.af.mil
Annotate the Subject Line of the email response as: “C-130H FMS RWR Integration Program Sources Sought Synopsis”.
Contracting Office Address:
Department of the Air Force,
C-130 Hercules System Program Office
440 Richard Ray Blvd Suite 2F-1A
Robins AFB, GA 31098-1670
[Note: The information provided is for the Government's market research and is given understanding the Government has no obligation to pay for the information. This information may be used in developing a request for proposals (RFP) but does not obligate the Government.
GOVERNMENT RESPONSE FORMAT - C-130H FMS RWR Integration Program
Part I: Contractor Questionnaire
(Format note: This part is requested in searchable PDF Format) The Government will treat your questionnaire responses as proprietary data that will not be shared with any individuals other than those with signed Non-Disclosure Agreements (NDA) in an Advisory and Assistance Service role with the Government.
A. Business Information
1. Company/Institute Name:
2. CAGE Code:
3. Company Point of Contact:
a. Name:
b. Telephone number:
c. Email address:
4. Physical Address:
5. Government proposed North American Industry Classification System (NAICS) Code: 336411
6. System of Award Management (SAM) (Yes / No)
7. A statement as to whether your company is domestically or foreign owned (if foreign, please indicate country of ownership).
B. Capability Survey Questions
1. Are you anticipating a teaming arrangement with other Contractors? If so, do you have a preliminary concept of the delineation of work that will be accomplished by the Prime and the work accomplished by the teaming partner(s)?
C. General Capability Questions
1. Briefly describe the capabilities of your company and the nature of the goods and/or services you provide. Include a description of your staff composition and management structure.
2. Describe your company's experience working on military transport aircraft projects similar in complexity to this requirement. Include a brief description of the work performed, period of performance, and agency/organization supported.
3. Describe your company's capabilities and experience in generating technical data, and Electronic Technical Manuals (ETMs). Identify what software programs are utilized to generate these data products and what formats are available for delivered items.
4. If a company can meet some, but not all the requirements stated in this Sources Sought, please provide a response that explains the requirements that you are capable of meeting.
D. Commerciality Question: Identify any requirements in this Sources Sought you consider to be commercial (see FAR Part 2 definitions). Please, provide supporting rationale (based on the FAR Part 2 definition).
Part II: Technical Solution
(Format note: This part is requested in searchable PDF format.)
This part shall not include any cost data. If any cost data is included in Part II, the Sources Sought response will not be reviewed for Government use. This part will be provided to the Partner Nation for their evaluation. The Government will treat your technical solution responses as proprietary data that will not be shared with any individuals other than the Partner Nation and those with signed Non-Disclosure Agreements (NDA) in an Advisory and Assistance Service role with the Government. Provide your company’s approach to address all requirements in this Sources Sought. In your response, address the following considerations and questions as they relate to this RWR Integration Program and your approach.
A. Topics for consideration in response:
1. Provide a brief description of the anticipated development activities in support of required certification.
2. Provide a brief description of the anticipated manufacturing needs to support the integration.
3. Provide a brief description of the anticipated installation activities including an install schedule.
4. Provide a brief description of the anticipated logistical needs to support the integration.
5. Identify any assumptions as part of your proposed solution.
6. Identify the top risks associated with this program.
7. Discuss any foreseeable data rights limitations.
8. Discuss known/envisioned obsolescence issues and ability to rectify.
B. Integration Questions
1. Describe your suggested approach for integrating it into the aircraft. Include a top-level system diagram.
2. Describe your capability and experiences in the integration of AN/ALR-69 on military aircraft platforms. Describe your similar integration efforts and scope. Discuss any differences between the fielded systems and what would be required/recommended for C-130?
3. Describe your capability and experience in developing Technical Order (T.O.) for systems integration; provide examples.
4. Describe impacts of this integration to existing C-130 systems including but not limited to the air data system, communications, surveillance system, flight controls, and instrumentation.
5. Discuss any capabilities (standard or unique) your company utilizes associated with design, lean manufacturing processes, test capability, and supply chain management that reduce overall program risk.
6. What other information can you provide to help the Air Force understand the technical requirements of this effort.
Part III: Financial Information
Demonstrate your ability and experience for the same or similar services, which are currently provided in the commercial and/or military environment by providing the following information on the same or similar items:
a) Contract Number
b) Procuring Agency
c) Contract Value
d) Services Provided
If past procurement history is unavailable, an overall estimated price to perform the services required is requested to aid the country partner in estimating costs.
Files
| File | Type | Posted |
|---|---|---|
| C-130 FMS ALR69 RWR SSS 15 Jan 2026.pdf |
Similar open opportunities
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity