R1 IMAT: Clearwater National Forest - Musselshell Creek Channel Relocation
Award Notice Posted
- Solicitation number
- AG-02RC-S-12-0063
- Agency
-
Region 1 - Northern Region
Forest Service, Department of Agriculture
- Awarded
- to A & K Construction Inc.
- Set-aside
- HUBZone
Opportunity facts
- Contract number
- AG-02RC-C-12-0036 Federal contract award
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- PSC
- Not on record
- Place of performance
- Clearwater National Forest 12730 Highway 12 Orofino, Idaho 83544, United States
Notice details come from SAM.gov. Updated .
Notice text
3 versions
Update #3 · Latest ·
R1 Idaho-Montana Acquisition Team (IMAT)
for the Clearwater National Forest
AG-02RC-S-12-0063
with Amendment 01, dated 5/14/2012
The project consists of relocating Musselshell Creek adjacent to Forest Service Road No. 540, milepost 3.65. The current channel goes through "Musselshell Tunnel." A 400 linear feet of channel will be realigned around the tunnel. Improvements consist of, but are not limited to, dewatering and rewatering the site, excavating material to shape and regrade the stream channel, installing streambed simulation material, installing instream structures for habitat, installing a new cross drain culvert, revegetating and seeding disturbed areas, realigning and surfacing Road No. 540 for approximately 350 linear feet and excavation and embankment of the roadway.
The project is located on the Lochsa Ranger District, Clearwater National Forest, Idaho County, Idaho. From Kamiah, Idaho travel to MP 28.8 on FS Road 100, Glenwood Road, and turn right at junction of FS Road 535. Continue on Road 535 to MP 1.9 and the junction of FS Road 540 on the left. The project site is located at MP 3.65 on FS Road 540.
The price range is between $100,000 and $250,000.
The period of performance expected to be from mid-June through October 31, 2012.
This is a HUBZone Small Business set-aside project.
Update #2 ·
R1 Idaho-Montana Acquisition Team (IMAT)
for the Clearwater National Forest
AG-02RC-S-12-0063
The project consists of relocating Musselshell Creek adjacent to Forest Service Road No. 540, milepost 3.65. The current channel goes through "Musselshell Tunnel." A 400 linear feet of channel will be realigned around the tunnel. Improvements consist of, but are not limited to, dewatering and rewatering the site, excavating material to shape and regrade the stream channel, installing streambed simulation material, installing instream structures for habitat, installing a new cross drain culvert, revegetating and seeding disturbed areas, realigning and surfacing Road No. 540 for approximately 350 linear feet and excavation and embankment of the roadway.
The project is located on the Lochsa Ranger District, Clearwater National Forest, Idaho County, Idaho. From Kamiah, Idaho travel to MP 28.8 on FS Road 100, Glenwood Road, and turn right at junction of FS Road 535. Continue on Road 535 to MP 1.9 and the junction of FS Road 540 on the left. The project site is located at MP 3.65 on FS Road 540.
The price range is between $100,000 and $250,000.
The period of performance expected to be from mid-June through October 31, 2012.
This is a HUBZone Small Business set-aside project.
Update #1 ·
R1 Idaho-Montana Acquisition Team (IMAT)
for the Clearwater National Forest
AG-02RC-S-12-0063
The project consists of relocating Musselshell Creek adjacent to Forest Service Road No. 540, milepost 3.65. The current channel goes through "Musselshell Tunnel." A 400 linear feet of channel will be realigned around the tunnel. Improvements consist of, but are not limited to, dewatering and rewatering the site, excavating material to shape and regrade the stream channel, installing streambed simulation material, installing instream structures for habitat, installing a new cross drain culvert, revegetating and seeding disturbed areas, realigning and surfacing Road No. 540 for approximately 350 linear feet and excavation and embankment of the roadway.
The project is located on the Lochsa Ranger District, Clearwater National Forest, Idaho County, Idaho. From Kamiah, Idaho travel to MP 28.8 on FS Road 100, Glenwood Road, and turn right at junction of FS Road 535. Continue on Road 535 to MP 1.9 and the junction of FS Road 540 on the left. The project site is located at MP 3.65 on FS Road 540.
The price range is between $100,000 and $250,000.
The period of performance expected to be from mid-June through October 31, 2012.
The Government anticipates the solicitation will be uploaded to FBO on approximately April 27, 2012 with an anticipated response date of May 30, 2012.
This is a HUBZone Small Business set-aside project.
Files
| File | Type | Posted |
|---|---|---|
| SF30_AG02RCS120063_Amend.pdf | ||
| SOL_AG02RCS120063_AMEND_01_Musselshell.pdf | ||
| SOL_AG02RCS120063_Musselshell.doc | DOC document | |
| Attachment_4_IdahoWCI.doc | DOC document | |
| Attachment_5_SF24BidBondFillForm.pdf | ||
| Attachment_3_Musselshell_Final_Drawings.pdf | ||
| Attachment_1_DBWageDetermination.docx | DOCX document | |
| Attachment_6_OwnerPastPerformanceSurvey.docx | DOCX document | |
| Attachment_2_Musselshell Tunnel_FSSS_Revised.doc | DOC document | |
| Attachment_7_DETOUR_PLAN.pdf |