Quality Assurance Essentials and Case Studies for Accelerated Bridge Construction

Awarded Award Notice Posted

Solicitation number
DTFH6116R00023
Agency
Federal Highway Administration Department of Transportation
Awarded
to WSP USA Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
DTFH6116C00014 Federal contract award
NAICS code
541330 Engineering Services
PSC
Not on record

Notice details come from SAM.gov. Updated .

Notice text

Added: Jun 07, 2016 11:42 am ABC is defined as bridge construction that uses innovative planning, design, materials, and construction methods in a safe and cost-effective manner to reduce the onsite construction time that occurs when building new bridges or replacing and rehabilitating existing bridges quickly. Conventional construction methods involve onsite activities that are time consuming and weather dependent. Nevertheless, speed is the primary difference between ABC and conventional bridge construction, but ABC can introduce other unique challenges such as: shipping and handling of large/irregular prefabricated elements, special lifting/erecting and element "fit-up" in the field, all of which could have special QA requirements.  There are three particular ABC technologies being promoted under EDC-2 which are: Prefabricated Bridge Elements and Systems (PBES), Slide-In Bridge Construction (SIBC), and Geosynthetic Reinforced Soil - Integrated Bridge System (GRS-IBS).  ABC is a paradigm shift in the project planning and procurement approach where the need to minimize mobility impacts which occur due to onsite construction activities are elevated to a higher priority. Conventional bridge construction is bridge construction that does not significantly reduce the onsite construction time that is needed to build, replace, or rehabilitate a single, or group of bridge projects.

Attachments

Files attached to this notice, newest first
File Type Posted
00023_RFP_QUESTIONS.docx DOCX document
J.2_Shipping_Label_00023.docx DOCX document
J.1_Disclose_of_Lobbying_Activity_00023.pdf PDF
DTFH6116R00023_AMENDMENT_000001.pdf PDF
DTFH6116R00023_Revised__RFP__Amendment_000001_6-10-16.pdf PDF
DTFH6116R00023.pdf PDF

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Quality Assurance Essentials and Case Studies for Accelerated Bridge Construction This notice · Latest Award Notice
Quality Assurance Essentials and Case Studies for Accelerated Bridge Construction Original Award Notice

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity