Quality Assurance Essentials and Case Studies for Accelerated Bridge Construction
Awarded Award Notice Posted
- Solicitation number
- DTFH6116R00023
- Agency
- Federal Highway Administration Department of Transportation
- Awarded
- to WSP USA Inc.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- DTFH6116C00014 Federal contract award
- NAICS code
- 541330 Engineering Services
- PSC
- Not on record
Notice details come from SAM.gov. Updated .
Notice text
Added: Jun 07, 2016 11:42 am ABC is defined as bridge construction that uses innovative planning, design, materials, and construction methods in a safe and cost-effective manner to reduce the onsite construction time that occurs when building new bridges or replacing and rehabilitating existing bridges quickly. Conventional construction methods involve onsite activities that are time consuming and weather dependent. Nevertheless, speed is the primary difference between ABC and conventional bridge construction, but ABC can introduce other unique challenges such as: shipping and handling of large/irregular prefabricated elements, special lifting/erecting and element "fit-up" in the field, all of which could have special QA requirements. There are three particular ABC technologies being promoted under EDC-2 which are: Prefabricated Bridge Elements and Systems (PBES), Slide-In Bridge Construction (SIBC), and Geosynthetic Reinforced Soil - Integrated Bridge System (GRS-IBS). ABC is a paradigm shift in the project planning and procurement approach where the need to minimize mobility impacts which occur due to onsite construction activities are elevated to a higher priority. Conventional bridge construction is bridge construction that does not significantly reduce the onsite construction time that is needed to build, replace, or rehabilitate a single, or group of bridge projects.
Attachments
| File | Type | Posted |
|---|---|---|
| 00023_RFP_QUESTIONS.docx | DOCX document | |
| J.2_Shipping_Label_00023.docx | DOCX document | |
| J.1_Disclose_of_Lobbying_Activity_00023.pdf | ||
| DTFH6116R00023_AMENDMENT_000001.pdf | ||
| DTFH6116R00023_Revised__RFP__Amendment_000001_6-10-16.pdf | ||
| DTFH6116R00023.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Quality Assurance Essentials and Case Studies for Accelerated Bridge Construction | Award Notice | |
| Quality Assurance Essentials and Case Studies for Accelerated Bridge Construction | Award Notice |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity