Q4 FY26 Baltimore Harbor and Channels Maintenance Dredging, Maryland Channels, Chesapeake Bay, MD
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W912DR26BA011
- Agency
-
ENDIST Baltimore
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Z1KF Maintenance Of Dredging Facilities
- Place of performance
- Baltimore, MD 21201
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Army Corps of Engineers Baltimore District solicited maintenance dredging of approximately 2,250,000 cubic yards from deep-draft federal navigation channels serving the Port of Baltimore, with bids opened September 1, 2026. No set-aside applies. The solicitation was amended twice; the bid submission deadline was extended to September 1, 2026, 10:00 AM EDT, and the virtual bid opening was rescheduled to 11:00 AM EDT on the same date.
Place of performance is Baltimore, Maryland. Work runs between November 2026 and March 2027, approximately 120 calendar days from receipt of Notice-to-Proceed. Approximately 1,538,000 cubic yards will be dredged from Maryland approach channels (Craighill Entrance, Craighill Angle, Cutoff Angle, and Upper Range Channels) and placed at the Paul S. Sarbanes Ecosystems Restoration Project at Poplar Island. Approximately 700,000 cubic yards will be dredged from Baltimore Harbor Channels (Brewerton Angle and Curtis Bay Channels) and placed at the Cox Creek Dredged Material Containment Facility. Dredging depth for all channels is 50 feet mean lower low water with an additional one-half foot of allowable overdepth. Equipment required commonly consists of two 30 plus cubic yard clamshell dredges, one 24–30-inch hydraulic unloader, six to eight large tugs, six to eight 2,500–6,000 cubic yard material scows, a drag bar and barge, and appropriate attendant plant and pipeline.
Three contractors submitted bids: Curtin Maritime Corp. (Long Beach, CA) at $31,671,146.59 (lowest); Kokosing Industrial, Inc. (Westerville, OH) at $42,091,073.09; and Cashman Dredging & Marine Contracting Co. LLC (Quincy, MA) at $38,696,700.00. The government estimate was $39,140,073.09. NAICS 237990, Other Heavy and Civil Engineering Construction; PSC Z1KF, Maintenance Of Dredging Facilities.
Notice text
5 versions
Update #5 · Latest ·
The purpose of this alert is to correct a bid abstract for the bid reading that took place on 01 September 2026, at 11:00 AM EDT.
Update #4 ·
The purpose of this alert is to publish the bid abstract for the bid reading that took place on 01 September 2026, at 11:00 AM EDT.
Update #3 ·
The purpose of this amendment is to provide responses to Requests for Information (RFIs) and distribute the topographic surveys.The Bid Submission Deadline remains September 01, 2026, at 10:00 AM EDT.The Bid Opening Date and Time remains September 01, 2026, at 11:00 AM EDT.All other terms and conditions remain unchanged.
Update #2 ·
**Amendment 0001 Key Changes Summary: Milestone Extensions:-ProjNet RFI Cutoff: Extended to 13 August 2026, 10:00 AM EDT (originally 03 August).-Bid Submission Deadline: Extended to 01 September 2026, 10:00 AM EDT (originally 25 August).-Virtual Bid Opening: Rescheduled to 01 September 2026, 11:00 AM EDT (originally 25 August).Geotechnical and Sediment Data:-Incorporates four (4) sediment reports for: Craighill Entrance, Craighill Angle, Craighill Upper Range, and Cutoff Angle.-Clarifies that geotechnical data is unavailable and will not be provided for Curtis Bay and Brewerton Angle. Plan Sheet Revisions:-Sheet V116 (Coordinates): Removes F1 from the Dredge Area Coordinates box and updates the coordinates for points F1 and F9.Sheet V112 (Poplar Island): Adds Inflow Point 8 to the Poplar Island drawings. **END Amendment 0001 Key Changes Summary****The project consists of maintenance dredging approximately 2,250,000 cubic yards (cy) from the deep-draft federal navigation channels serving the Port of Baltimore. The work is to be performed between November 2026 through March 2027. The dredging depth for all channels is 50 feet mean lower low water (ft MLLW) with an additional 1 ? 2 foot of allowable overdepth. Approximately 1,538,000 cy will be dredged from the Maryland approach channels (Craighill Entrance, Craighill Angle, Cutoff Angle, and Upper Range Channels) and placed at the Paul S. Sarbanes Ecosystems Restoration Project at Poplar Island. Approximately 700,000 cy will be dredged from Baltimore Harbor Channels (Brewerton Angle and Curtis Bay Channels) and placed at the Cox Creek Dredged Material Containment Facility. The work areas are within heavy commercial waterways supporting the Port of Baltimore. The equipment required for this work commonly consists of two 30 plus cubic yard clamshell dredges, one 24 ? 30-inch hydraulic unloader, six to eight large tugs, six to eight 2,500 ? 6,000 cubic yard material scows, a drag bar and barge, and appropriate attendant plant and pipeline. The material will be dredged by clamshell/bucket and scow and placed within a period of performance of approximately 120 calendar days from receipt of Notice-to-Proceed.
Update #1 ·
The project consists of maintenance dredging approximately 2,250,000 cubic yards (cy) from the deep-draft federal navigation channels serving the Port of Baltimore. The work is to be performed between November 2026 through March 2027. The dredging depth for all channels is 50 feet mean lower low water (ft MLLW) with an additional 1 ? 2 foot of allowable overdepth. Approximately 1,538,000 cy will be dredged from the Maryland approach channels (Craighill Entrance, Craighill Angle, Cutoff Angle, and Upper Range Channels) and placed at the Paul S. Sarbanes Ecosystems Restoration Project at Poplar Island. Approximately 700,000 cy will be dredged from Baltimore Harbor Channels (Brewerton Angle and Curtis Bay Channels) and placed at the Cox Creek Dredged Material Containment Facility. The work areas are within heavy commercial waterways supporting the Port of Baltimore. The equipment required for this work commonly consists of two 30 plus cubic yard clamshell dredges, one 24 ? 30-inch hydraulic unloader, six to eight large tugs, six to eight 2,500 ? 6,000 cubic yard material scows, a drag bar and barge, and appropriate attendant plant and pipeline. The material will be dredged by clamshell/bucket and scow and placed within a period of performance of approximately 120 calendar days from receipt of Notice-to-Proceed.
Files
| File | Type | Posted |
|---|---|---|
| Abstract of Bids - W912DR26BA011 01SEP2026.pdf | ||
| BID ABSTRACT_01SEPTEMBER26.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Q4 FY26 Baltimore Harbor and Channels Maintenance Dredging, Maryland Channels, Chesapeake Bay, MD | Award Notice | |
| This notice | Solicitation | |
| Q4 FY26 Baltimore Harbor and Channels Maintenance Dredging, Maryland Channels, Chesapeake Bay, MD | Pre-Solicitation | |
| Q4 FY26 Baltimore Harbor and Channels Maintenance Dredging, Maryland Channels, Chesapeake Bay, MD | Pre-Solicitation | |
| FY26 Q4 Baltimore Harbor and Channels Maintenance Dredging, Maryland Channels, Chesapeake Bay, MD | Pre-Solicitation |
Similar open opportunities
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity