Q301--Administrative & Technical Support Services Final question/answer posting.
Closed Solicitation Posted
- Solicitation number
- 36C24E21R0022
- Agency
- Veterans Integrated Service Network 4 Veterans Health Administration, Department of Veterans Affairs
- Responses due
- Set-aside
- Service-Disabled Veteran-Owned Small Business
Opportunity facts
- NAICS code
- 541611 Administrative Management and General Management Consulting Services
- PSC
- Q301 Reference Laboratory Testing
Notice details come from SAM.gov. Updated .
Notice text
6 versions
Update #6 · Latest ·
See attached question 3 document.
Update #5 ·
Michael Haydo is currently out of the office until August 23, 2021. The purpose of this action is to extend the solicitation to 8/31/21 at 10AM. This action also extends the question period until Sunday, 8/22/2021 at 4PM. Michael will post an amendment to the solicitation addressing questions upon his return. Questions related to the solicitation and this action, may only be sent to Michael Haydo only at michae.haydo@va.gov. Any questions sent to any other person or in any other manner will not be forwarded to and/or addressed by Michael.
Update #4 ·
Admin and Tech Support.
Update #3 ·
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued.
The solicitation number 36C24E21R0022 is issued as a Request for Proposal (RFP). The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2005-92.
This requirement will be made using a cascading set-aside under the associated NAICS code 541611 Administrative Management and General Management Consulting Services with a small business size standard of $16.5 Million.
The full solicitation document is included as an attachment to this notice; to include: a list of contract line items, a Description of requirements for the items to be acquired, SOW, Date(s) and place(s) of delivery, instructions and applicable clauses and provisions.
Evaluation procedures: Evaluation of offers will be made in accordance with FAR 13.106-2, and award made on the basis of Best Value through a Tiered Set-Aside. Evaluation Factors include the following: Contract Forms and Administration, Technical Capability to include an assessment of Proposed Personnel (submission of resumes for Key Personnel is required), Technical Approach, and Experience and Management; Past Performance; and Price.
Question submission: All questions are due before 7/29/2021 at 10:00 AM (EST). No questions will be accepted after that date/time.
Due date and submission of quotes:
The quotes are due on 8/23/2021 at 10:00 AM (EST) and shall be directed electronically to Michael.haydo@va.gov. Quotes shall be marked with the solicitation number.
Information regarding the solicitation can be addressed to the Contracting Officer, Michael Haydo, michael.haydo@va.gov
Update #2 ·
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued.
The solicitation number 36C24E21R0022 is issued as a Request for Proposal (RFP). The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2005-92.
This requirement will be made using a cascading set-aside under the associated NAICS code 541611 Administrative Management and General Management Consulting Services with a small business size standard of $16.5 Million.
The full solicitation document is included as an attachment to this notice; to include: a list of contract line items, a Description of requirements for the items to be acquired, SOW, Date(s) and place(s) of delivery, and applicable clauses and provisions.
Evaluation procedures: Evaluation of offers will be made in accordance with FAR 13.106-2, and award made on the basis of Best Value. Evaluation Factors include the following: Technical Capability to include an assessment of Proposed Personnel (submission of resumes for Key Personnel is required), Technical Approach, and Corporate Experience and Management; Past Performance; and Price (to include a labor breakdown, work breakdown structure (WBS), and a price/cost realism analysis).
Statement of Work
Administrative and Technical Support Services Contract
1.0 BACKGROUND
The Department of Veterans Affairs (VA) Office of Research and Development (ORD) oversees thousands of research projects in such research areas as aging, women s health, post-traumatic stress disorder, cancer, and genomics. A secondary benefit of these research endeavors is the transfer to the healthcare delivery system of new and beneficial technologies resulting from research conducted throughout the VA medical centers. ORD consists of four research services that together form a cohesive whole to explore all phases of Veterans' health care needs: Biomedical Laboratory Research & Development (BLRD); Clinical Science Research & Development (CSRD); Health Services Research & Development (HSRD) and Rehabilitation Research & Development (RRD). Additional Research Programs within ORD include the Quality Enhancement Research Initiative (QUERI), the Office of Research Protection, Policy and Education (ORPP&E), the Million Veteran Program (MVP), Technology Transfer Program (TTP) and the Cooperative Studies Program (CSP). The mission of the Office of Research Protections, Policy, and Education (ORPP&E) is to protect participants in VA human research. ORPP&E is responsible for: all policy development and guidance for human research protection in the VA; all training and education in human research protection throughout the VA; and oversight of the administrative operation of the VA Central Institutional Review Board (VA CIRB), which reviews and has oversight of designated VA multi-site and single site projects. ORPP&E's vision is to make VA human research as safe as possible.
Additional information about ORPP&E can be found at https://www.research.va.gov/programs/orppe/default.cfm.
The intended contract seeks to acquire technical and administrative support for the following functions:
ORPP&E s regulatory policy team is responsible for developing policy and guidance for the 108 VA facilities engaged in human subject research. As part of this effort, ORPP&E maintains a total of five mailboxes and one database to manage the receipt of questions from VA facilities. In 2020, an estimated 800 questions were received in the various mailboxes ORPP&E manages. ORPP&E also manages five listservs to facilitate the sharing of information and best practices amongst VA facilities engaged in human subject research. ORPP&E s regulatory policy team is also responsible for managing VA s national implementation of the Cooperative Research Provision/Single IRB Requirement found in 38 CFR 16.114. Programmatic responsibilities include managing the process by which study teams request exceptions to the single IRB requirement and facilitating the process by which study team s obtain ORD approval to rely on ORD approved commercial IRBs for industry-sponsored multisite non-exempt research. A total of 200 single IRB exception requests and 153 applications to rely on a commercial IRB were processed in 2020.
ORPP&E s education and training team is responsible for conducting training and education for the 108 VA facilities and their university affiliates that are engaged in human subject research. A total of 35 education and training sessions were offered in FY20 to over 12,343 attendees. The team is responsible for hosting both in-person and remote educational training sessions on issues pertaining to the conduct and oversight of research involving human subjects. The team is also responsible for the dissemination of guidance and tools to VA facilities involved in the conduct and oversight of VA research involving human subjects.
The VA Innovation and Research Review System (VAIRRS) is the VA's enterprise instance of IRBNet. VAIRRS is the research committee software management platform for all VA medical centers with research programs and is uniquely positioned to withstand the changing pressures of research needs, including:
oversight needs of the research programs and institutions
collaborative needs of dually appointed VHA investigators
regulatory changes of the new Common Rule (2019).
As of November 2020, a total of 48 VA facilities have transitioned to the VAIRRS platform, with the remaining facilities scheduled to transition onto the platform by the end of FY21. The VAIRRS platform houses a library of over 60 forms and templates that are used by VA facilities in the conduct and oversight of research involving human subjects.
The VA Central IRB has been in existence for over 12 years and is responsible for providing IRB oversight of human subject research for VA facilities nationwide. The VA CIRB currently has Memorandums of Understanding (MOUs) with 108 VA facilities for which it serves as an IRB of record. The VA CIRB is currently comprised of two IRB panels, with a third panel scheduled to begin operation in 2021. As of December 31, 2018, the two panels had oversight of 228 studies involving 1,490 local sites. In 2019, the VA Central IRB received 35 new studies and approximately 44 new protocol applications, which includes 199 associated LSI applications. With the implementation of the single IRB requirement in 2020, this number is expected to only increase. The two existing panels review, approve, and provide continuing oversight of human subject research for which more than one VA facility is engaged in human subjects research. The third panel will be responsible for reviewing single site human subjects research conducted at smaller VA facilities that do not have a primary IRB of record.
2.0 PURPOSE AND SCOPE
The purpose of this contract is to obtain administrative and technical assistance in support of the Office of Research Protections, Policy, and Education. To support the tasks identified below requires an experienced and cohesive team of technical and administrative professionals who can demonstrate a comprehensive understanding of the regulatory and policy requirements governing the conduct and oversight of human subjects research and the infrastructure needed to support these activities for approximately 108 VA facilities nationwide.
Support to ORPP&E s regulatory policy team shall include (1) providing administrative support to maintain the five mailboxes and FAQ database, to include updating the database with questions and responses received and (2) providing administrative support to track and process single IRB exception requests and applications to rely on commercial IRB s for multisite non-exempt research.
Support to ORPP&E s education and training team includes providing administrative assistance with educational trainings to include assisting with pre-and post-event activities and assisting with the administration of webinars using platforms available to ORPP&E (e.g. gotowebinar, CISCO Webex, Microsoft Teams).
Support to the VAIRRS team includes providing administrative support with the planning and hosting of meetings pertaining to the VAIRRS program and providing administrative support with managing the document review process for the creation and revision of templates and forms related to the VAIRRS program.
Support to the VA CIRB will include providing both technical and administrative assistance in managing the receipt and processing of human subject research applications, to include new submissions as well as post-approval monitoring (i.e. amendments/modifications, continuing reviews, and reportable events). Additional duties of the Contractor shall include (1) providing meeting support to include scheduling panel meetings, ensuring distribution of meeting materials electronically to IRB panel members and staff, and preparing meeting agendas and minutes for VA CIRB panel meetings; (2) assisting in the preparation and review of Standard Operating Procedures and related forms for the VA CIRB; and (3) conducting annual file audits of a select number of VA CIRB study folders.
3.0 PLACE OF PERFORMANCE
The contract services and activities will take place primarily at the VA ORD in Washington D.C. or at approved Contractor facilities mutually agreed to by the Contractor and the VA, to include the option of telework.
4.0 PERIOD OF PERFORMANCE
The period of performance shall be one base period of twelve months and three option periods of twelve months each. Only the VA under authority of the VA Contracting Officer has the authority to exercise an option under this Agreement.
5.0 GENERAL REQUIREMENTS
The Contractor shall contact the Contracting Officer and Contracting Officer Representative (COR) to set up a contract award kick-off meeting within the first 15 calendar days of the contract award date.
The Contractor will provide a plan, the Project Management Plan (PMP) , as to how tasks will be successfully completed.
The PMP shall include a narrative and graphic format displaying schedule, specifically defined milestones, risks, communications, and resource support. The PMP shall explain how the Contractor will coordinate and execute planned, routine, and ad hoc requirements as identified in the PWS. A list of staff assignments supporting each task shall be included once they are determined.
The PMP will be submitted within 30 calendar days of contract award.
Upon acceptance, the initial PMP will be considered baseline and shall be updated as needed.
The Contractor will contact the COR to set up semi-annual evaluation meetings to discuss the status of the contract, deliverables, and contract performance. Prior to meeting, the VA COR will coordinate schedules for VA staff to receive input for the evaluation of the performance of the Contractor.
The Contractor will prepare agendas and minutes for the semi-annual contract meetings. At the request of the VA COR, the Contractor shall take minutes of conference calls and/or meetings held with the Contractor management, VA COR, and Stakeholders. Copies of these minutes shall be provided to the COR.
Hours of Operation: the hours of operation will be specified in the approved Project Management Plan.
Travel: Travel is not anticipated under this contract.
6.0 SPECIFIC TASKS AND DELIVERABLES
Contractor personnel shall provide all administrative and technical support for the tasks outlined below:
Task 1: Administrative Helpdesk Support
The Contractor shall provide administrative helpdesk support to ORPP&E.
Deliverable 1.1 The Contractor shall have experience working with Microsoft Access Databases. The Contractor shall transfer questions and responses received from the five mailboxes managed by ORPP&E as well as questions and responses from newly published FAQs and guidance documents into the FAQ database monthly.
Deliverable 1.2 The Contractor shall be responsible for maintaining ORPP&E mailboxes, to include organizing and collating questions and responses and purging redundant questions monthly.
Deliverable 1.3 The Contractor shall add VA email addresses of individuals to the various listservs that ORPP&E manages (e.g. IRB Chairs, IRB Administrators, Training and Education, R&D Committee, and Small Research Programs) on an ongoing basis.
Task 2: Meeting and Training Support: Education and Training
The Contractor shall provide administrative support to ORPP&E s education and training program.
Deliverable 2.1 The Contractor shall be responsible for scheduling and conducting tech walks with first time webinar presenters, to include all individuals granted open mics, prior to ORPP&E scheduled webinars. The Contractor shall send emails requesting availability for a tech walk a minimum of one week before the webinar to ensure tech walks occur for all presenters before the day of the scheduled webinar.
Deliverable 2.2 The Contractor shall assist with administering/hosting webinars using the platform available to ORPP&E. Activities will include adding requisite information to the webinar platform, to include the title and duration of the webinar; speakers names, titles and email addresses; handouts, polls and surveys; opening the webinar platform at the designated time; managing questions received during the webinar to include displaying questions on the screen for viewers at the appropriate time; displaying presenter slides when necessary; and helping to resolve any issues that may come up during the course of the webinar.
Deliverable 2.3 The Contractor shall assist with post webinar activities, to include preparing survey and data analytics generated from the webinar platform, to include attendee registration information, attendance records, questions submitted, response to post-webinar evaluation surveys and sending webinar recordings, associated handouts, presenter information, key words used to tag each webinar for search functionality, and transcripts to ORPP&E s webmaster for posting to the webpage.
Task 3: Meeting and Training Support: VAIRRS Program
The Contractor shall provide administrative support to the VAIRRS Program.
Deliverable 3.1 The Contractor shall be responsible for scheduling project management and workgroup session meetings for the VAIRRS program. The Contractor shall maintain workgroup rosters and coordinate availability of workgroup members and meeting participants for workgroup and project management meetings, respectively. The Contractor shall coordinate availability of meeting participants and set up in-person and remote meetings using approved meeting platform. The Contractor shall solicit agenda topics from meeting participants; prepare and disseminate meeting agendas; attend meetings, track open tasks and action items; and prepare meeting minutes.
Deliverable 3.2 The Contractor shall be responsible for scheduling monthly webinars, obtaining webinar materials from presenters and attending webinars and managing presentations as necessary.
Deliverable 3.3 The Contractor shall be responsible for assisting with VAIRRS program communication efforts to include the following: Drafting monthly program updates for posting on the VAIRRS external webpage or the internal SharePoint site; monitoring and responding to questions received in the VAIRRS program mailbox; and elevating questions to the VAIRRS Program Manager as appropriate.
Deliverable 3.4 The Contractor shall be responsible for drafting revisions to the VAIRRS library of forms and templates based on input received during document review sessions, tracking changes made to forms and templates, and maintaining a list of the most current versions of all forms.
Task 4: VA Central IRB Support Protocol Review and Processing
The Contractor shall support the VA CIRB by processing new study submissions and managing post-approval monitoring (amendments, continuing review, and reportable events) for all assigned human subjects research studies. The Contractor shall ensure that all documents produced by and in support of the VA CIRB are written clearly, concisely, and incorporate all required regulatory and VA policy requirements.
Deliverable 4.1 The Contractor shall use the approved IRB platform for managing research studies (e.g. IRBNet and VA CIRB database). All protocol actions must be processed in accordance with VA CIRB SOPs.
Deliverable 4.2 The Contractor manages both PI applications and Local Site Applications from all local participating sites for the assigned study (which can involve anywhere from 1 site to over 50 sites per study nationwide), notifying all sites of the requirement for local review, collecting all comments and summarizing them for review by the IRB, and highlighting any problems or concerns that may require additional required changes or modifications to the study for review by the IRB.
Deliverable 4.3 The Contractor shall perform administrative and technical reviews of assigned study applications to identify missing or incomplete documentation and to highlight areas that may be deficient or require clarification. The contractor will complete required review forms and communicate findings to the study team and/or assigned IRB members as necessary.
Deliverable 4.4 The Contractor shall coordinate review of the study submission among the study team and assigned IRB members to include information security, regulatory, privacy, and VA Central IRB voting primary, secondary, and informed consent reviewers, ensuring that all reviews are completed in a timely manner, summarizing comments, and contacting the study team to request additional information and/or changes to the project or forms.
Deliverable 4.5 The Contractor shall maintain a complete file of all submitted study documents, results of all reviews by assigned reviewers, and all correspondence in accordance with VA CIRB SOPS and other regulatory requirements. The Contractor shall ensure strict document and version control to preserve the integrity of approved documents.
Deliverable 4.6 The Contractor shall prepare interim and final letters to the study team for actions eligible for expedited review, notifying all relevant parties, including but not limited to the national study team, all local participating sites, local participating research offices, and coordinating centers, of the results of each review and the regulatory basis for requested changes, until the study team has satisfied all identified reviewer and regulatory concerns and a final approval letter from the IRB is issued. The Contractor is responsible for ensuring that all expedited actions are appropriately reported to the next convened meeting of the IRB.
Deliverable 4.7 The Contractor shall ensure all databases and tracking logs are kept up to date, so the exact status of a given project is known at all times.
Deliverable 4.8 The Contractor shall manage communication with, and provides advice and guidance to Principal Investigators, Study Chairs, and Study Teams, throughout all stages of the study, from application submission to conclusion of the study.
Deliverable 4.9 The contractor shall manage all post-approval monitoring activities as assigned by VA Central IRB Management staff to include the processing of modifications to approved studies, continuing review or annual reports as required, and the processing of reportable event reports to include unanticipated problems, protocol deviation and violations, local RCO and other audit reports, and complaints. In managing these actions, the tasks delineating in deliverables 4.1 through 4.8 also apply.
Task 5: VA Central IRB Support Meeting Support
The Contractor shall provide pre-meeting, meeting, and post-meeting support to all panels of the VA CIRB. The Contractor shall ensure that all documents produced by and in support of the VA CIRB are written clearly, concisely, and incorporate all required regulatory and VA policy requirements.
Deliverable 5.1 The Contractor shall assist with generating agendas for VA CIRB meetings, to include coordinating schedules with VA CIRB members to ensure both quorum and appropriate placement of items on the agenda with sufficient allocation of time to agenda items.
Deliverable 5.2 The Contractor shall ensure that actions that require review by the convened IRB are placed on the appropriate meeting agenda for review and that all project documents are received from the study and available to IRB members for review. The Contractor is responsible for alerting the IRB Panel Manager if experts are needed for the review of the protocol and ensuring the study team s availability at the meeting when necessary.
Deliverable 5.3 The Contractor shall attend IRB meetings where his/her assigned protocol will be reviewed and shall be responsible for taking accurate, detailed, and comprehensive notes during the meeting and drafting letters that accurately capture required changes and recommendations made by the convened IRB, ensuring that all letters are clear and reflect the regulatory basis for the actions and determinations by the IRB during the meeting.
Deliverable 5.4 The Contractor shall provide support to the VA CIRB panel administrator during meetings by attending meetings, tracking attendance throughout the duration of the meeting, and taking detailed notes during the meeting.
Deliverable 5.5 The Contractor shall prepare accurate, detailed, and complete meeting minutes of VA CIRB meetings, ensuring that meeting minutes are compliant with VA and other federal requirements as well as VA CIRB SOPs. The Contractor will assist with publishing final minutes to IRBNet and the VA CIRB SharePoint site as necessary.
Task 6: VA Central IRB Support Administrative Support
Deliverable 6.1 The Contractor shall assist with revising VA CIRB SOPs as requested by VA Central IRB management personnel.
Deliverable 6.2 The Contractor shall assist with updating forms, checklists, templates, and reports used by the VA CIRB as requested by VA Central IRB Management personnel.
Deliverable 6.3 The Contractor shall perform file audits of up to 20 VA CIRB Principal Investigator protocols on an annual basis. Protocols to be audited will be designated by VA Central IRB Management personnel.
Deliverable 6.4 The Contractor shall assist with preparing for oversight inspections and site visits as necessary.
Deliverable 6.5 In rotation with other VA CIRB staff, the Contractor shall be responsible for answering calls received on the national VA Central IRB toll free line, logging in the calls, and providing and appropriate response or forwarding the call to VA Central IRB staff if indicated.
Task 7: Regulatory and Policy Support Implementation of the Cooperative Research Provision/Single IRB Requirement
The contractor shall provide administrative support to ORPPE s cooperative research provision/single IRB program.
Deliverable 7.1 The Contractor shall ensure that all checklists and other required documents for the Non-VA Institutional Review Board Application Process are included in the application process, entering applications into the tracking system, and routing documents appropriately to required reviewers.
Deliverable 7.2 The Contractor shall maintain and track records of the status of IRB reliance agreements and Federal Wide Assurance (FWA) for non-VA Institutional Review Board including maintaining a database of when IRB reliance agreements are executed, modified, renewed, suspended, or terminated.
Deliverable 7.3 The Contractor shall maintain a database of the status of Federal Wide Assurances for any non-VA IRB used by a VA Facility, including when it is executed with an Office of Research Oversight addendum, modified, suspended, or terminated.
6.1 DELIVERABLES TABLE
TASK
DELIVERABLE
PLANNED COMPLETION DATE
Task 1: Administrative Help Desk Support
1.1 The Contractor shall have experience working with Microsoft Access Databases. The Contractor shall transfer questions and responses received from the five mailboxes managed by ORPP&E as well as questions and responses from newly published FAQs and guidance documents into the FAQ database on a monthly basis.
As outlined in task order.
Task 1: Administrative Help Desk Support
1.2 The Contractor shall be responsible for maintaining ORPP&E mailboxes, to include organizing and collating questions and responses and purging redundant questions on a monthly basis.
As outlined in task order.
Task 1: Administrative Help Desk Support
1.3 The Contractor shall add VA email addresses of individuals to the various listservs that ORPP&E manages (e.g. IRB Chairs, IRB Administrators, Training and Education, R&D Committee, and Small Research Programs) on an ongoing basis.
As outlined in task order.
Task 2: Meeting and Training Support Education and Training Program
2.1 The Contractor shall be responsible for scheduling and conducting tech walks with first time webinar presenters, to include all individuals granted open mics, prior to ORPP&E scheduled webinars.
As outlined in task order.
Task 2: Meeting and Training Support Education and Training Program
2.2 The Contractor shall assist with administering/hosting webinars using the platform available to ORPP&E.
As outlined in task order.
Task 2: Meeting and Training Support Education and Training Program
2.3 The Contractor shall assist with post webinar activities.
As outlined in task order.
Task 3: Meeting and Training Support VAIRRS Program
3.1 The Contractor shall be responsible for scheduling project management and workgroup session meetings for the VAIRRS program.
As outlined in task order.
Task 3: Meeting and Training Support VAIRRS Program
3.2 The Contractor shall be responsible for scheduling monthly webinars, obtaining webinar materials from presenters and attending webinars and managing presentations as necessary.
As outlined in task order.
Task 3: Meeting and Training Support VAIRRS Program
3.3 The Contractor shall be responsible for assisting with VAIRRS program communication efforts.
As outlined in task order.
Task 3: Meeting and Training Support VAIRRS Program
3.4 The Contractor shall be responsible for drafting revisions to the VAIRRS library of forms and templates.
As outlined in task order.
Task 4: VA CIRB Support Protocol Review and Processing
4.1 The Contractor shall use the approved IRB platform for processing research applications (e.g. IRBNet and VA CIRB database). All protocol actions must be processed in accordance with VA CIRB SOPs.
As outlined in task order.
Task 4: VA CIRB Support Protocol Review and Processing
4.2 The Contractor manages both PI applications and Local Site Applications from all local participating sites for the assigned study
As outlined in task order.
Task 4: VA CIRB Support Protocol Review and Processing
4.3 The Contractor shall perform administrative and technical reviews of assigned study applications.
As outlined in task order.
Task 4: VA CIRB Support Protocol Review and Processing
4.4 The Contractor shall coordinate review of the study submission among the study team and assigned IRB members.
As outlined in task order.
Task 4: VA CIRB Support Protocol Review and Processing
4.5 The Contractor shall maintain a complete file of all submitted study documents, results of all reviews by assigned reviewers, and all correspondence
As outlined in task order.
Task 4: VA CIRB Support Protocol Review and Processing
4.6 The Contractor shall prepare interim and final letters to the study team for actions eligible for expedited review.
As outlined in task order.
Task 4: VA CIRB Support Protocol Review and Processing
4.7 The Contractor shall ensure all databases and tracking logs are kept up to date.
As outlined in task order.
Task 4: VA CIRB Support Protocol Review and Processing
4.8 The Contractor shall manage communication with, and provides advice and guidance to Principal Investigators, Study Chairs, and Study Teams.
As outlined in task order.
Task 4: VA CIRB Support Protocol Review and Processing
4.9 The contractor shall manage all post-approval monitoring activities as assigned by VA Central IRB Management staff.
As outlined in task order.
Task 5: VA CIRB Support Meeting Support
5.1 The Contractor shall assist with generating agendas for VA CIRB meetings.
As outlined in task order.
Task 5: VA CIRB Support Meeting Support
5.2 The Contractor shall ensure that actions that require review by the convened IRB are placed on the appropriate meeting agenda and reviewed by the convened IRB.
As outlined in task order.
Task 5: VA CIRB Support Meeting Support
5.3 The Contractor shall attend IRB meetings where his/her assigned protocol will be reviewed and shall be responsible for taking accurate, detailed, and comprehensive notes during the meeting and drafting letters.
As outlined in task order.
Task 5: VA CIRB Support Meeting Support
5.4 The Contractor shall provide support to the VA CIRB panel administrator during meetings.
As outlined in task order.
Task 5: VA CIRB Support Meeting Support
5.5 The Contractor shall prepare accurate, detailed, and complete meeting minutes of VA CIRB meetings
As outlined in task order.
Task 6: VA CIRB Support Administrative Support
6.1 The Contractor shall assist with revising VA CIRB SOPs as requested.
As outlined in task order.
Task 6: VA CIRB Support Administrative Support
6.2 The Contractor shall assist with updating forms, checklists, templates, and reports used by the VA CIRB as requested.
As outlined in task order.
Task 6: VA CIRB Support Administrative Support
6.3 The Contractor shall perform file audits of up to 20 VA CIRB Principal Investigator protocols on an annual basis.
As outlined in task order.
Task 6: VA CIRB Support Administrative Support
6.4 The Contractor shall assist with preparing for oversight inspections and site visits as necessary.
As outlined in task order.
Task 6: VA CIRB Support Administrative Support
6.5 In rotation with other VA CIRB staff, the Contractor shall be responsible for answering calls received on the national VA Central IRB toll free line, logging them in, and providing an appropriate response and forwarding the question or problem to another VA Central IRB staff member.
As outlined in task order.
Task 7: Regulatory and Policy Support Implementation of the Cooperative Research Provision/Single IRB Requirement
7.1 The Contractor shall ensure that all checklists and other required documents for the Non-VA Institutional Review Board Application Process are included in the application process.
As outlined in task order.
Task 7: Regulatory and Policy Support Implementation of the Cooperative Research Provision/Single IRB Requirement
7.2 The Contractor shall maintain and track records of the status of IRB reliance agreements and Federal Wide Assurance (FWA) for non-VA Institutional Review Board.
As outlined in task order.
Task 7: Regulatory and Policy Support Implementation of the Cooperative Research Provision/Single IRB Requirement
7.3 The Contractor shall maintain a database of the status of Federal Wide Assurances for any non-VA IRB used by a VA Facility
As outlined in task order.
Table 1: Task/Deliverable Summary
Indicator/Task/Deliverable
Performance Standard
Min Level
Review Method(s)
Frequency
The Contractor shall contact the Contracting Officer and COR to set up a contract award kick-off meeting within the first 15 calendar days of the contract award date
The kick-off meeting was held within 15 days of award
100%
100% Inspection
Once
The Contractor shall provide project management support. A Project Management Plan (PMP) that lays out the Contractor s approach, timeline and tools shall be provided.
A quality PMP is provided and updated annually.
95%
Contractor-provided data
Annually
The Contractor shall contact the COR to set up semiannual evaluation meetings
Semi-annual meetings are held
90%
100% Inspection
Semi-annually
The Contractor shall prepare agendas and minutes for semi-annual contract meetings
Agendas and minutes for semi-annual meetings are prepared
85%
Contractor-provided Data
Semi-annually
The Contractor will complete all government-mandated training as required
All required training for all contract staff is completed before an over-due report is generated
100%
100% Inspection
Annually
1. Administrative Help Desk Support: The Contractor will provide administrative support to ORPP&E.
All deliverables completed according to timeline and standards in the approved PMP
90%
Random Sampling;
100% Inspection
In accordance with the approved PMP
2. Meeting and Training Support Education and Training: The Contractor shall provide administrative support to ORPP&E s education and training program.
All deliverables completed according to timeline and standards in the approved PMP.
90%
Random Sampling;
100% Inspection
In accordance with the approved PMP
3. Meeting and Training Support VAIRRS Program: The Contractor shall provide administrative support to the VAIRRS Program.
All deliverables completed according to timeline and standards in the approved PMP.
90%
Random Sampling;
100% Inspection
In accordance with the approved PMP
4. VA Central IRB Protocol Review and Processing: The Contractor shall support the VA CIRB by processing new study submissions and managing post-approval monitoring.
All deliverables completed according to timeline and standards in the approved PMP.
90%
Random Sampling; 100% Inspection
In accordance with the approved PMP
5. VA Central IRB Support Meeting Support: The Contractor shall provide pre-meeting, meeting and post-meeting support to all panels of the VA CIRB.
All deliverables completed according to timeline and standards in the approved PMP.
90%
Random Sampling; 100% Inspection
In accordance with the approved PMP
VA Central IRB Support Administrative Support: The Contractor shall provide administrative support to the VA CIRB as needed.
All deliverables completed according to timeline and standards in the approved PMP.
90%
Random Sampling; 100% Inspection
In accordance with the approved PMP
Regulatory and Policy Support Implementation of the Cooperative Research Provision/Single IRB Requirement
All deliverables completed according to timeline and standards in the approved PMP.
90%
Random Sampling; 100% Inspection
In accordance with the approved PMP
7.0 TASK REVIEWS
The Contractor shall notify the CO/COR and VA PM as soon as it becomes apparent to the Contractor that a scheduled delivery shall be late. The Contractor shall include in the notification the rationale for late delivery, the expected date for the delivery and the projected impact. The CO/COR will review the proposed schedule and provide guidance to the Contractor; all contract changes will be via written modification signed by the Contracting Officer. Prompt notification of delay does not limit the Government's right to all rights and remedies up to and including termination.
All deliverables will be reviewed for content, completeness, accuracy, and conformance to task order requirements by the CO/COR and/or his/her presentative. Reviews will include validation of information as specified in the contract. All deliverables will be checked to ensure the completeness, quality, and adequacy of all deliverables.
The Government requires a period not to exceed thirty (30) days after receipt of written deliverable items for inspection and acceptance or rejection. Inspection and acceptance of all work performance, reports and other deliverables under this task order shall be performed by the COR. The Government s written approval of the draft and final documents shall constitute acceptance by the VA.
8.0 KEY PERSONNEL
a. The Contractor will propose labor categories they deem essential for successful contractor accomplishment of the work to be performed under this contract and subsequent task orders and option. These individuals are defined as Key Personnel and are those persons whose résumés shall be submitted and marked by the contractor as Key Personnel through submission of the Technical Capability. Substitutions shall only be accepted if in compliance with the Substitution of Key Personnel provision identified below.
b. Key Personnel shall include as a minimum: one Program Manager, five Protocol Coordinators, and one qualified technical writer/editor. Additional positions may be added by agreement between the government and the contract and outlined on a contract modification.
c. The Program Manager is responsible for direct communication with the VA COR. She/he shall have a Master s Degree from a recognized institute of higher education; shall have a minimum of 5 years experience in research administration and oversight and a minimum of 3 years of management and supervisory experience.
d. The Protocol Coordinators shall be assigned to the VA CIRB and may support any of the VA CIRB panels. Protocol Coordinators shall be technically sufficient in written and oral communication and shall have a minimum of 3 years experience working in an IRB performing reviews of non-exempt human subject research.
e. The Technical Writer/Editor is responsible for preparing the IRB agenda and meeting minutes and ensuring that all prepared meeting minutes meet all regulatory and policy requirements as well as all requirements specified in VA CIRB SOPs. In addition to the preparation of VA CIRB meeting agenda and meeting minutes, the Technical Writer shall assist the VA CIRB Panel and Network Administrators in the preparation, review and editing of letters, forms, and VA CIRB SOPs. This includes development of document and email templates with periodic review for consistency, accuracy, and as needed personalization based on review/specific situation. The Technical Writer/Editor shall hold at least a Baccalaureate degree in English, Journalism, or other appropriate field of study and have a minimum of 3 years experience with an IRB.
f. The Contractor shall demonstrate the appropriate mix and balance of education, academic excellence, training and experience.
g. The proposed Key Personnel shall be familiar with the functions of the Institutional Review Board, the Common Rule, and FDA regulations.
h. The Contractor shall identify the specific responsibilities for each key role within the Management Plan.
i. The Contractor shall be available for consultation with VA from 8 am to 4:30 pm Eastern Time.
j. The Contractor shall notify VA CO in writing within 10 business days of any changes in management plan.
All departing key personnel shall be replaced within 60 calendar days from the last date of employment. The Contractor shall make every effort to replace departing personnel as quickly as possible. The Contractor will provide written notification of departure, indicating the last date of employment.
8.1 Substitution of Key Personnel.
Any personnel the contractor offers as substitutes shall have the ability and qualifications equal to or better than the key personnel who are being replaced. Requests to substitute personnel must be approved by the COR and the CO. All requests for approval of substitutions in personnel shall be submitted to the COR and the CO within 30 calendar days prior to making any change in key personnel. The request shall be written and provide a detailed explanation of the circumstances necessitating the proposed substitution. The contractor shall submit a complete resume for the proposed substitute.
The Contractor shall be responsible for managing and overseeing the activities of all Contractor personnel, as well as subcontractor efforts used in performance of this effort, if applicable. The Contractor s management responsibilities shall include all activities necessary to ensure the accomplishment of timely, effective, professional, and high-quality support, performed in accordance with the requirements contained herein.
9.0 GOVERNMENT-FURNISHED EQUIPMENT (GFE)/GOVERNMENT-FURNISHED INFORMATION (GFI)
The contractor will be loaned a VA computer, PIV and CAG access.
10.0 SECURITY REQUIREMENTS
The contractor will need access to VA systems to perform work on this contract. The following security requirements apply to the contractor:
10.1 POSITION/TASK RISK DESIGNATION LEVEL(S)
Position Sensitivity
Background Investigation (in accordance with Department of Veterans Affairs 0710 Handbook, Personnel Suitability and Security Program, Appendix A)
Low / Tier 1
Tier 1 / National Agency Check with Written Inquiries (NACI) A Tier 1/NACI is conducted by OPM and covers a 5-year period. It consists of a review of records contained in the OPM Security Investigations Index (SII) and the DOD Defense Central Investigations Index (DCII), Federal Bureau of Investigation (FBI) name check, FBI fingerprint check, and written inquiries to previous employers and references listed on the application for employment. In VA it is used for Non-sensitive or Low Risk positions.
Moderate / Tier 2
Tier 2 / Moderate Background Investigation (MBI) A Tier 2/MBI is conducted by OPM and covers a 5-year period. It consists of a review of National Agency Check (NAC) records [OPM Security Investigations Index (SII), DOD Defense Central Investigations Index (DCII), FBI name check, and a FBI fingerprint check], a credit report covering a period of 5 years, written inquiries to previous employers and references listed on the application for employment; an interview with the subject, law enforcement check; and a verification of the educational degree.
High / Tier 4
Tier 4 / Background Investigation (BI) A Tier 4/BI is conducted by OPM and covers a 10-year period. It consists of a review of National Agency Check (NAC) records [OPM Security Investigations Index (SII), DOD Defense Central Investigations Index (DCII), FBI name check, and a FBI fingerprint check report], a credit report covering a period of 10 years, written inquiries to previous employers and references listed on the application for employment; an interview with the subject, spouse, neighbors, supervisor, co-workers; court records, law enforcement check, and a verification of the educational degree.
The position sensitivity and the level of background investigation commensurate with the required level of access for the following tasks within the PWS are:
Position Sensitivity and Background Investigation Requirements by Task
Task Number
Tier1 / Low / NACI
Tier 2 / Moderate / MBI
Tier 4 / High / BI
All Tasks
x
The Tasks identified above and the resulting Position Sensitivity and Background Investigation requirements identify, in effect, the Background Investigation requirements for Contractor individuals, based upon the tasks the particular Contractor individual will be working. The submitted Contractor Staff Roster must indicate the required Background Investigation Level for each Contractor individual based upon the tasks the Contractor individual will be working, in accordance with their submitted proposal.
The C&A requirements do not apply, and a Security Accreditation Package is not required.
10.2 CONTRACTOR PERSONNEL SECURITY REQUIREMENTS
Contractor Responsibilities:
The Contractor shall prescreen all personnel requiring access to the computer systems to ensure they maintain the appropriate Background Investigation.
The Contractor shall bear the expense of obtaining background investigations.
Within 3 business days after award, the Contractor shall provide a roster of Contractor and Subcontractor employees to the COR to begin their background investigations. The roster shall contain the Contractor s Full Name, Full Social Security Number, Date of Birth, Place of Birth, and individual background investigation level requirement. The preferred method to send the Contractor Staff Roster or Social Security Number is by encrypted e-mail. If unable to send encrypted e-mail, other methods which comply with FIPS 140-2 are to encrypt the file, use a secure fax, or use a traceable mail service.
The Contractor should coordinate the location of the nearest VA fingerprinting office through the COR. Only electronic fingerprints are authorized.
The following forms are required to be completed:
Optional Form 306;
Self-Certification of Continuous Service;
VA Form 0710; and
Completed Security and Investigations Center (SIC) Fingerprint Request Form.
The Contractor personnel will receive an email notification from the Security and Investigation Center (SIC), through the Electronics Questionnaire for Investigations Processes (e-QIP) identifying the website link that includes detailed instructions regarding completion of the investigation documents (NACI-SF85). The Contractor personnel shall submit all required information related to their background investigations utilizing the Office of Personnel Management s (OPM) Electronic Questionnaire for Investigations Processing (e-QIP).
The Contractor shall complete the e-QIP questionnaire and digitally sign e-QIP within 7 days of receipt of initiation email. The Contractor shall print the signature pages, and send them to the COR for electronic submission to the SIC. These should be submitted to the COR within 7 days of receipt of the e-QIP notification email.
The Contractor shall be responsible for the actions of all personnel provided to work for VA under this contract. In the event that damages arise from work performed by Contractor provided personnel, under the auspices of this contract, the Contractor shall be responsible for all resources necessary to remedy the incident.
A Contractor may be granted unescorted access to VA facilities and/or access to VA Information Technology resources (network and/or protected data) with a favorably adjudicated Special Agreement Check (SAC) or Closed, No Issues (SAC) finger print results, training delineated in VA Handbook 6500.6 (Appendix C, Section 9), and, the signed Contractor Rules of Behavior. However, the Contractor will be responsible for the actions of the Contractor personnel they provide to perform work for VA. The investigative history for Contractor personnel working under this contract must be maintained in the database of the Office of Personnel Management (OPM).
The Contractor, when notified of an unfavorably adjudicated background investigation on a Contractor employee as determined by the Government, shall withdraw the employee from consideration in working under the contract.
Failure to comply with the Contractor personnel security investigative requirements may result in termination of the contract for default.
Attachment 1: FY21 VA CIRB Meeting Schedule
2021 VA Central IRB Panel Meeting Dates
Application forms for submission of new projects to the VA Central IRB can be found on the VA Central IRB public website at:
http://www.research.va.gov/vacentralirb/forms/default.cfm.
Study teams should contact the VA Central IRB Administrator prior to submitting a new study application for additional guidance. All required documents must be submitted and the application complete before a project is added to a meeting agenda.
This schedule reflects the first six months of the year. The schedule will be re-evaluated mid-year and then the schedule for the rest of the year will be published.
Panel 1 Panel 2
January 15 January 8
January 29 February 5
February 19 February 26
March 5 March 12
March 19 March 26
April 2 April 9
April 16 April 23
April 30 May 7
May 14 May 21
June 4 June 11
June 18 June 25
This is a requirement for administrative and technical assistance as detailed in the SOW. All responses shall include information which demonstrates, as a minimum, equivalency to the characteristics shown above.
The attached solicitation contains all applicable provisions and clauses which apply to this acquisition:
Additional contract requirement(s) or terms and conditions determined by the contracting officer:
Set Aside Cascading set-aside procedures.
Any award resulting from this solicitation will be made using a cascading set-aside order of precedence as follows:
1. In accordance with FAR Subpart 19.1405 and VAAR Subpart 819.7005, any award under this solicitation will be made on a competitive basis first to an eligible Service Disabled Veteran Owned small business [SDVOSB] concern provided that the conditions of 38 U.S.C. 8127(d) are met (the VA Rule of Two) whereby the Contracting Officer receives adequate competition of two or more small business concerns owned and controlled by Veterans, and that the award can be made at a fair and reasonable price that offers the best value to the United States.
2. If there is inadequate competition for award to an SDVOSB concern, the SDVOSB set-aside shall be withdrawn and cascaded to the next contracting order of priority in accordance with VAAR 819.7004, which is Veteran Owned Small Businesses (VOSB) and conducted in accordance with the procedures set forth in VAAR 819.7006 provided that the conditions of 38 U.S.C. 8127(d) are met (the VA Rule of Two) whereby the Contracting Officer receives adequate competition of two or more small business concerns owned and controlled by Veterans, and that the award can be made at a fair and reasonable price that offers the best value to the United States.
3. If there continues to be inadequate competition between SDVOSB and VOSB concerns, the cascading will continue through the contracting order of priority in accordance with VAAR 819.7004 and FAR 19.203. If the contracting officer determines that offers from small business concerns do not meet the solicitation requirements in terms of technical acceptability, past performance, and fair market price, the small business set-aside[s] will be withdrawn and award will be made on the basis of full and open competition.
Adequate competition:
Adequate competition shall be deemed to exist if At least two competitive offers are received from qualified, responsible business concerns at the set-aside tier under consideration; and Award could be made at fair market price as determined in accordance with FAR 19.202-6.
The VA contracting officer reserves the right to consider competitive proposals submitted from all responsible offerors (including large businesses) in determining the fair market price.
Question submission: All questions are due before 7/29/2021 at 10:00 AM (EST). No questions will be accepted after that date/time.
Due date and submission of quotes:
The quotes are due on 8/25/2021 at 10:00 AM (EST) and shall be directed electronically to Michael.haydo@va.gov. Quotes shall be marked with the solicitation number.
Information regarding the solicitation can be addressed to the Contracting Officer, Michael Haydo, michael.haydo@va.gov
Update #1 ·
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued.
The solicitation number 36C24E21R0022 is issued as a Request for Proposal (RFP). The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2005-92.
This requirement will be made using a cascading set-aside under the associated NAICS code 541611 Administrative Management and General Management Consulting Services with a small business size standard of $16.5 Million.
The full solicitation document is included as an attachment to this notice; to include: a list of contract line items, a Description of requirements for the items to be acquired, SOW, Date(s) and place(s) of delivery, and applicable clauses and provisions.
Evaluation procedures: Evaluation of offers will be made in accordance with FAR 13.106-2, and award made on the basis of Best Value. Evaluation Factors include the following: Technical Capability to include an assessment of Proposed Personnel (submission of resumes for Key Personnel is required), Technical Approach, and Corporate Experience and Management; Past Performance; and Price (to include a labor breakdown, work breakdown structure (WBS), and a price/cost realism analysis).
Statement of Work
Administrative and Technical Support Services Contract
1.0 BACKGROUND
The Department of Veterans Affairs (VA) Office of Research and Development (ORD) oversees thousands of research projects in such research areas as aging, women s health, post-traumatic stress disorder, cancer, and genomics. A secondary benefit of these research endeavors is the transfer to the healthcare delivery system of new and beneficial technologies resulting from research conducted throughout the VA medical centers. ORD consists of four research services that together form a cohesive whole to explore all phases of Veterans' health care needs: Biomedical Laboratory Research & Development (BLRD); Clinical Science Research & Development (CSRD); Health Services Research & Development (HSRD) and Rehabilitation Research & Development (RRD). Additional Research Programs within ORD include the Quality Enhancement Research Initiative (QUERI), the Office of Research Protection, Policy and Education (ORPP&E), the Million Veteran Program (MVP), Technology Transfer Program (TTP) and the Cooperative Studies Program (CSP). The mission of the Office of Research Protections, Policy, and Education (ORPP&E) is to protect participants in VA human research. ORPP&E is responsible for: all policy development and guidance for human research protection in the VA; all training and education in human research protection throughout the VA; and oversight of the administrative operation of the VA Central Institutional Review Board (VA CIRB), which reviews and has oversight of designated VA multi-site and single site projects. ORPP&E's vision is to make VA human research as safe as possible.
Additional information about ORPP&E can be found at https://www.research.va.gov/programs/orppe/default.cfm.
The intended contract seeks to acquire technical and administrative support for the following functions:
ORPP&E s regulatory policy team is responsible for developing policy and guidance for the 108 VA facilities engaged in human subject research. As part of this effort, ORPP&E maintains a total of five mailboxes and one database to manage the receipt of questions from VA facilities. In 2020, an estimated 800 questions were received in the various mailboxes ORPP&E manages. ORPP&E also manages five listservs to facilitate the sharing of information and best practices amongst VA facilities engaged in human subject research. ORPP&E s regulatory policy team is also responsible for managing VA s national implementation of the Cooperative Research Provision/Single IRB Requirement found in 38 CFR 16.114. Programmatic responsibilities include managing the process by which study teams request exceptions to the single IRB requirement and facilitating the process by which study team s obtain ORD approval to rely on ORD approved commercial IRBs for industry-sponsored multisite non-exempt research. A total of 200 single IRB exception requests and 153 applications to rely on a commercial IRB were processed in 2020.
ORPP&E s education and training team is responsible for conducting training and education for the 108 VA facilities and their university affiliates that are engaged in human subject research. A total of 35 education and training sessions were offered in FY20 to over 12,343 attendees. The team is responsible for hosting both in-person and remote educational training sessions on issues pertaining to the conduct and oversight of research involving human subjects. The team is also responsible for the dissemination of guidance and tools to VA facilities involved in the conduct and oversight of VA research involving human subjects.
The VA Innovation and Research Review System (VAIRRS) is the VA's enterprise instance of IRBNet. VAIRRS is the research committee software management platform for all VA medical centers with research programs and is uniquely positioned to withstand the changing pressures of research needs, including:
oversight needs of the research programs and institutions
collaborative needs of dually appointed VHA investigators
regulatory changes of the new Common Rule (2019).
As of November 2020, a total of 48 VA facilities have transitioned to the VAIRRS platform, with the remaining facilities scheduled to transition onto the platform by the end of FY21. The VAIRRS platform houses a library of over 60 forms and templates that are used by VA facilities in the conduct and oversight of research involving human subjects.
The VA Central IRB has been in existence for over 12 years and is responsible for providing IRB oversight of human subject research for VA facilities nationwide. The VA CIRB currently has Memorandums of Understanding (MOUs) with 108 VA facilities for which it serves as an IRB of record. The VA CIRB is currently comprised of two IRB panels, with a third panel scheduled to begin operation in 2021. As of December 31, 2018, the two panels had oversight of 228 studies involving 1,490 local sites. In 2019, the VA Central IRB received 35 new studies and approximately 44 new protocol applications, which includes 199 associated LSI applications. With the implementation of the single IRB requirement in 2020, this number is expected to only increase. The two existing panels review, approve, and provide continuing oversight of human subject research for which more than one VA facility is engaged in human subjects research. The third panel will be responsible for reviewing single site human subjects research conducted at smaller VA facilities that do not have a primary IRB of record.
2.0 PURPOSE AND SCOPE
The purpose of this contract is to obtain administrative and technical assistance in support of the Office of Research Protections, Policy, and Education. To support the tasks identified below requires an experienced and cohesive team of technical and administrative professionals who can demonstrate a comprehensive understanding of the regulatory and policy requirements governing the conduct and oversight of human subjects research and the infrastructure needed to support these activities for approximately 108 VA facilities nationwide.
Support to ORPP&E s regulatory policy team shall include (1) providing administrative support to maintain the five mailboxes and FAQ database, to include updating the database with questions and responses received and (2) providing administrative support to track and process single IRB exception requests and applications to rely on commercial IRB s for multisite non-exempt research.
Support to ORPP&E s education and training team includes providing administrative assistance with educational trainings to include assisting with pre-and post-event activities and assisting with the administration of webinars using platforms available to ORPP&E (e.g. gotowebinar, CISCO Webex, Microsoft Teams).
Support to the VAIRRS team includes providing administrative support with the planning and hosting of meetings pertaining to the VAIRRS program and providing administrative support with managing the document review process for the creation and revision of templates and forms related to the VAIRRS program.
Support to the VA CIRB will include providing both technical and administrative assistance in managing the receipt and processing of human subject research applications, to include new submissions as well as post-approval monitoring (i.e. amendments/modifications, continuing reviews, and reportable events). Additional duties of the Contractor shall include (1) providing meeting support to include scheduling panel meetings, ensuring distribution of meeting materials electronically to IRB panel members and staff, and preparing meeting agendas and minutes for VA CIRB panel meetings; (2) assisting in the preparation and review of Standard Operating Procedures and related forms for the VA CIRB; and (3) conducting annual file audits of a select number of VA CIRB study folders.
3.0 PLACE OF PERFORMANCE
The contract services and activities will take place primarily at the VA ORD in Washington D.C. or at approved Contractor facilities mutually agreed to by the Contractor and the VA, to include the option of telework.
4.0 PERIOD OF PERFORMANCE
The period of performance shall be one base period of twelve months and three option periods of twelve months each. Only the VA under authority of the VA Contracting Officer has the authority to exercise an option under this Agreement.
5.0 GENERAL REQUIREMENTS
The Contractor shall contact the Contracting Officer and Contracting Officer Representative (COR) to set up a contract award kick-off meeting within the first 15 calendar days of the contract award date.
The Contractor will provide a plan, the Project Management Plan (PMP) , as to how tasks will be successfully completed.
The PMP shall include a narrative and graphic format displaying schedule, specifically defined milestones, risks, communications, and resource support. The PMP shall explain how the Contractor will coordinate and execute planned, routine, and ad hoc requirements as identified in the PWS. A list of staff assignments supporting each task shall be included once they are determined.
The PMP will be submitted within 30 calendar days of contract award.
Upon acceptance, the initial PMP will be considered baseline and shall be updated as needed.
The Contractor will contact the COR to set up semi-annual evaluation meetings to discuss the status of the contract, deliverables, and contract performance. Prior to meeting, the VA COR will coordinate schedules for VA staff to receive input for the evaluation of the performance of the Contractor.
The Contractor will prepare agendas and minutes for the semi-annual contract meetings. At the request of the VA COR, the Contractor shall take minutes of conference calls and/or meetings held with the Contractor management, VA COR, and Stakeholders. Copies of these minutes shall be provided to the COR.
Hours of Operation: the hours of operation will be specified in the approved Project Management Plan.
Travel: Travel is not anticipated under this contract.
6.0 SPECIFIC TASKS AND DELIVERABLES
Contractor personnel shall provide all administrative and technical support for the tasks outlined below:
Task 1: Administrative Helpdesk Support
The Contractor shall provide administrative helpdesk support to ORPP&E.
Deliverable 1.1 The Contractor shall have experience working with Microsoft Access Databases. The Contractor shall transfer questions and responses received from the five mailboxes managed by ORPP&E as well as questions and responses from newly published FAQs and guidance documents into the FAQ database monthly.
Deliverable 1.2 The Contractor shall be responsible for maintaining ORPP&E mailboxes, to include organizing and collating questions and responses and purging redundant questions monthly.
Deliverable 1.3 The Contractor shall add VA email addresses of individuals to the various listservs that ORPP&E manages (e.g. IRB Chairs, IRB Administrators, Training and Education, R&D Committee, and Small Research Programs) on an ongoing basis.
Task 2: Meeting and Training Support: Education and Training
The Contractor shall provide administrative support to ORPP&E s education and training program.
Deliverable 2.1 The Contractor shall be responsible for scheduling and conducting tech walks with first time webinar presenters, to include all individuals granted open mics, prior to ORPP&E scheduled webinars. The Contractor shall send emails requesting availability for a tech walk a minimum of one week before the webinar to ensure tech walks occur for all presenters before the day of the scheduled webinar.
Deliverable 2.2 The Contractor shall assist with administering/hosting webinars using the platform available to ORPP&E. Activities will include adding requisite information to the webinar platform, to include the title and duration of the webinar; speakers names, titles and email addresses; handouts, polls and surveys; opening the webinar platform at the designated time; managing questions received during the webinar to include displaying questions on the screen for viewers at the appropriate time; displaying presenter slides when necessary; and helping to resolve any issues that may come up during the course of the webinar.
Deliverable 2.3 The Contractor shall assist with post webinar activities, to include preparing survey and data analytics generated from the webinar platform, to include attendee registration information, attendance records, questions submitted, response to post-webinar evaluation surveys and sending webinar recordings, associated handouts, presenter information, key words used to tag each webinar for search functionality, and transcripts to ORPP&E s webmaster for posting to the webpage.
Task 3: Meeting and Training Support: VAIRRS Program
The Contractor shall provide administrative support to the VAIRRS Program.
Deliverable 3.1 The Contractor shall be responsible for scheduling project management and workgroup session meetings for the VAIRRS program. The Contractor shall maintain workgroup rosters and coordinate availability of workgroup members and meeting participants for workgroup and project management meetings, respectively. The Contractor shall coordinate availability of meeting participants and set up in-person and remote meetings using approved meeting platform. The Contractor shall solicit agenda topics from meeting participants; prepare and disseminate meeting agendas; attend meetings, track open tasks and action items; and prepare meeting minutes.
Deliverable 3.2 The Contractor shall be responsible for scheduling monthly webinars, obtaining webinar materials from presenters and attending webinars and managing presentations as necessary.
Deliverable 3.3 The Contractor shall be responsible for assisting with VAIRRS program communication efforts to include the following: Drafting monthly program updates for posting on the VAIRRS external webpage or the internal SharePoint site; monitoring and responding to questions received in the VAIRRS program mailbox; and elevating questions to the VAIRRS Program Manager as appropriate.
Deliverable 3.4 The Contractor shall be responsible for drafting revisions to the VAIRRS library of forms and templates based on input received during document review sessions, tracking changes made to forms and templates, and maintaining a list of the most current versions of all forms.
Task 4: VA Central IRB Support Protocol Review and Processing
The Contractor shall support the VA CIRB by processing new study submissions and managing post-approval monitoring (amendments, continuing review, and reportable events) for all assigned human subjects research studies. The Contractor shall ensure that all documents produced by and in support of the VA CIRB are written clearly, concisely, and incorporate all required regulatory and VA policy requirements.
Deliverable 4.1 The Contractor shall use the approved IRB platform for managing research studies (e.g. IRBNet and VA CIRB database). All protocol actions must be processed in accordance with VA CIRB SOPs.
Deliverable 4.2 The Contractor manages both PI applications and Local Site Applications from all local participating sites for the assigned study (which can involve anywhere from 1 site to over 50 sites per study nationwide), notifying all sites of the requirement for local review, collecting all comments and summarizing them for review by the IRB, and highlighting any problems or concerns that may require additional required changes or modifications to the study for review by the IRB.
Deliverable 4.3 The Contractor shall perform administrative and technical reviews of assigned study applications to identify missing or incomplete documentation and to highlight areas that may be deficient or require clarification. The contractor will complete required review forms and communicate findings to the study team and/or assigned IRB members as necessary.
Deliverable 4.4 The Contractor shall coordinate review of the study submission among the study team and assigned IRB members to include information security, regulatory, privacy, and VA Central IRB voting primary, secondary, and informed consent reviewers, ensuring that all reviews are completed in a timely manner, summarizing comments, and contacting the study team to request additional information and/or changes to the project or forms.
Deliverable 4.5 The Contractor shall maintain a complete file of all submitted study documents, results of all reviews by assigned reviewers, and all correspondence in accordance with VA CIRB SOPS and other regulatory requirements. The Contractor shall ensure strict document and version control to preserve the integrity of approved documents.
Deliverable 4.6 The Contractor shall prepare interim and final letters to the study team for actions eligible for expedited review, notifying all relevant parties, including but not limited to the national study team, all local participating sites, local participating research offices, and coordinating centers, of the results of each review and the regulatory basis for requested changes, until the study team has satisfied all identified reviewer and regulatory concerns and a final approval letter from the IRB is issued. The Contractor is responsible for ensuring that all expedited actions are appropriately reported to the next convened meeting of the IRB.
Deliverable 4.7 The Contractor shall ensure all databases and tracking logs are kept up to date, so the exact status of a given project is known at all times.
Deliverable 4.8 The Contractor shall manage communication with, and provides advice and guidance to Principal Investigators, Study Chairs, and Study Teams, throughout all stages of the study, from application submission to conclusion of the study.
Deliverable 4.9 The contractor shall manage all post-approval monitoring activities as assigned by VA Central IRB Management staff to include the processing of modifications to approved studies, continuing review or annual reports as required, and the processing of reportable event reports to include unanticipated problems, protocol deviation and violations, local RCO and other audit reports, and complaints. In managing these actions, the tasks delineating in deliverables 4.1 through 4.8 also apply.
Task 5: VA Central IRB Support Meeting Support
The Contractor shall provide pre-meeting, meeting, and post-meeting support to all panels of the VA CIRB. The Contractor shall ensure that all documents produced by and in support of the VA CIRB are written clearly, concisely, and incorporate all required regulatory and VA policy requirements.
Deliverable 5.1 The Contractor shall assist with generating agendas for VA CIRB meetings, to include coordinating schedules with VA CIRB members to ensure both quorum and appropriate placement of items on the agenda with sufficient allocation of time to agenda items.
Deliverable 5.2 The Contractor shall ensure that actions that require review by the convened IRB are placed on the appropriate meeting agenda for review and that all project documents are received from the study and available to IRB members for review. The Contractor is responsible for alerting the IRB Panel Manager if experts are needed for the review of the protocol and ensuring the study team s availability at the meeting when necessary.
Deliverable 5.3 The Contractor shall attend IRB meetings where his/her assigned protocol will be reviewed and shall be responsible for taking accurate, detailed, and comprehensive notes during the meeting and drafting letters that accurately capture required changes and recommendations made by the convened IRB, ensuring that all letters are clear and reflect the regulatory basis for the actions and determinations by the IRB during the meeting.
Deliverable 5.4 The Contractor shall provide support to the VA CIRB panel administrator during meetings by attending meetings, tracking attendance throughout the duration of the meeting, and taking detailed notes during the meeting.
Deliverable 5.5 The Contractor shall prepare accurate, detailed, and complete meeting minutes of VA CIRB meetings, ensuring that meeting minutes are compliant with VA and other federal requirements as well as VA CIRB SOPs. The Contractor will assist with publishing final minutes to IRBNet and the VA CIRB SharePoint site as necessary.
Task 6: VA Central IRB Support Administrative Support
Deliverable 6.1 The Contractor shall assist with revising VA CIRB SOPs as requested by VA Central IRB management personnel.
Deliverable 6.2 The Contractor shall assist with updating forms, checklists, templates, and reports used by the VA CIRB as requested by VA Central IRB Management personnel.
Deliverable 6.3 The Contractor shall perform file audits of up to 20 VA CIRB Principal Investigator protocols on an annual basis. Protocols to be audited will be designated by VA Central IRB Management personnel.
Deliverable 6.4 The Contractor shall assist with preparing for oversight inspections and site visits as necessary.
Deliverable 6.5 In rotation with other VA CIRB staff, the Contractor shall be responsible for answering calls received on the national VA Central IRB toll free line, logging in the calls, and providing and appropriate response or forwarding the call to VA Central IRB staff if indicated.
Task 7: Regulatory and Policy Support Implementation of the Cooperative Research Provision/Single IRB Requirement
The contractor shall provide administrative support to ORPPE s cooperative research provision/single IRB program.
Deliverable 7.1 The Contractor shall ensure that all checklists and other required documents for the Non-VA Institutional Review Board Application Process are included in the application process, entering applications into the tracking system, and routing documents appropriately to required reviewers.
Deliverable 7.2 The Contractor shall maintain and track records of the status of IRB reliance agreements and Federal Wide Assurance (FWA) for non-VA Institutional Review Board including maintaining a database of when IRB reliance agreements are executed, modified, renewed, suspended, or terminated.
Deliverable 7.3 The Contractor shall maintain a database of the status of Federal Wide Assurances for any non-VA IRB used by a VA Facility, including when it is executed with an Office of Research Oversight addendum, modified, suspended, or terminated.
6.1 DELIVERABLES TABLE
TASK
DELIVERABLE
PLANNED COMPLETION DATE
Task 1: Administrative Help Desk Support
1.1 The Contractor shall have experience working with Microsoft Access Databases. The Contractor shall transfer questions and responses received from the five mailboxes managed by ORPP&E as well as questions and responses from newly published FAQs and guidance documents into the FAQ database on a monthly basis.
As outlined in task order.
Task 1: Administrative Help Desk Support
1.2 The Contractor shall be responsible for maintaining ORPP&E mailboxes, to include organizing and collating questions and responses and purging redundant questions on a monthly basis.
As outlined in task order.
Task 1: Administrative Help Desk Support
1.3 The Contractor shall add VA email addresses of individuals to the various listservs that ORPP&E manages (e.g. IRB Chairs, IRB Administrators, Training and Education, R&D Committee, and Small Research Programs) on an ongoing basis.
As outlined in task order.
Task 2: Meeting and Training Support Education and Training Program
2.1 The Contractor shall be responsible for scheduling and conducting tech walks with first time webinar presenters, to include all individuals granted open mics, prior to ORPP&E scheduled webinars.
As outlined in task order.
Task 2: Meeting and Training Support Education and Training Program
2.2 The Contractor shall assist with administering/hosting webinars using the platform available to ORPP&E.
As outlined in task order.
Task 2: Meeting and Training Support Education and Training Program
2.3 The Contractor shall assist with post webinar activities.
As outlined in task order.
Task 3: Meeting and Training Support VAIRRS Program
3.1 The Contractor shall be responsible for scheduling project management and workgroup session meetings for the VAIRRS program.
As outlined in task order.
Task 3: Meeting and Training Support VAIRRS Program
3.2 The Contractor shall be responsible for scheduling monthly webinars, obtaining webinar materials from presenters and attending webinars and managing presentations as necessary.
As outlined in task order.
Task 3: Meeting and Training Support VAIRRS Program
3.3 The Contractor shall be responsible for assisting with VAIRRS program communication efforts.
As outlined in task order.
Task 3: Meeting and Training Support VAIRRS Program
3.4 The Contractor shall be responsible for drafting revisions to the VAIRRS library of forms and templates.
As outlined in task order.
Task 4: VA CIRB Support Protocol Review and Processing
4.1 The Contractor shall use the approved IRB platform for processing research applications (e.g. IRBNet and VA CIRB database). All protocol actions must be processed in accordance with VA CIRB SOPs.
As outlined in task order.
Task 4: VA CIRB Support Protocol Review and Processing
4.2 The Contractor manages both PI applications and Local Site Applications from all local participating sites for the assigned study
As outlined in task order.
Task 4: VA CIRB Support Protocol Review and Processing
4.3 The Contractor shall perform administrative and technical reviews of assigned study applications.
As outlined in task order.
Task 4: VA CIRB Support Protocol Review and Processing
4.4 The Contractor shall coordinate review of the study submission among the study team and assigned IRB members.
As outlined in task order.
Task 4: VA CIRB Support Protocol Review and Processing
4.5 The Contractor shall maintain a complete file of all submitted study documents, results of all reviews by assigned reviewers, and all correspondence
As outlined in task order.
Task 4: VA CIRB Support Protocol Review and Processing
4.6 The Contractor shall prepare interim and final letters to the study team for actions eligible for expedited review.
As outlined in task order.
Task 4: VA CIRB Support Protocol Review and Processing
4.7 The Contractor shall ensure all databases and tracking logs are kept up to date.
As outlined in task order.
Task 4: VA CIRB Support Protocol Review and Processing
4.8 The Contractor shall manage communication with, and provides advice and guidance to Principal Investigators, Study Chairs, and Study Teams.
As outlined in task order.
Task 4: VA CIRB Support Protocol Review and Processing
4.9 The contractor shall manage all post-approval monitoring activities as assigned by VA Central IRB Management staff.
As outlined in task order.
Task 5: VA CIRB Support Meeting Support
5.1 The Contractor shall assist with generating agendas for VA CIRB meetings.
As outlined in task order.
Task 5: VA CIRB Support Meeting Support
5.2 The Contractor shall ensure that actions that require review by the convened IRB are placed on the appropriate meeting agenda and reviewed by the convened IRB.
As outlined in task order.
Task 5: VA CIRB Support Meeting Support
5.3 The Contractor shall attend IRB meetings where his/her assigned protocol will be reviewed and shall be responsible for taking accurate, detailed, and comprehensive notes during the meeting and drafting letters.
As outlined in task order.
Task 5: VA CIRB Support Meeting Support
5.4 The Contractor shall provide support to the VA CIRB panel administrator during meetings.
As outlined in task order.
Task 5: VA CIRB Support Meeting Support
5.5 The Contractor shall prepare accurate, detailed, and complete meeting minutes of VA CIRB meetings
As outlined in task order.
Task 6: VA CIRB Support Administrative Support
6.1 The Contractor shall assist with revising VA CIRB SOPs as requested.
As outlined in task order.
Task 6: VA CIRB Support Administrative Support
6.2 The Contractor shall assist with updating forms, checklists, templates, and reports used by the VA CIRB as requested.
As outlined in task order.
Task 6: VA CIRB Support Administrative Support
6.3 The Contractor shall perform file audits of up to 20 VA CIRB Principal Investigator protocols on an annual basis.
As outlined in task order.
Task 6: VA CIRB Support Administrative Support
6.4 The Contractor shall assist with preparing for oversight inspections and site visits as necessary.
As outlined in task order.
Task 6: VA CIRB Support Administrative Support
6.5 In rotation with other VA CIRB staff, the Contractor shall be responsible for answering calls received on the national VA Central IRB toll free line, logging them in, and providing an appropriate response and forwarding the question or problem to another VA Central IRB staff member.
As outlined in task order.
Task 7: Regulatory and Policy Support Implementation of the Cooperative Research Provision/Single IRB Requirement
7.1 The Contractor shall ensure that all checklists and other required documents for the Non-VA Institutional Review Board Application Process are included in the application process.
As outlined in task order.
Task 7: Regulatory and Policy Support Implementation of the Cooperative Research Provision/Single IRB Requirement
7.2 The Contractor shall maintain and track records of the status of IRB reliance agreements and Federal Wide Assurance (FWA) for non-VA Institutional Review Board.
As outlined in task order.
Task 7: Regulatory and Policy Support Implementation of the Cooperative Research Provision/Single IRB Requirement
7.3 The Contractor shall maintain a database of the status of Federal Wide Assurances for any non-VA IRB used by a VA Facility
As outlined in task order.
Table 1: Task/Deliverable Summary
Indicator/Task/Deliverable
Performance Standard
Min Level
Review Method(s)
Frequency
The Contractor shall contact the Contracting Officer and COR to set up a contract award kick-off meeting within the first 15 calendar days of the contract award date
The kick-off meeting was held within 15 days of award
100%
100% Inspection
Once
The Contractor shall provide project management support. A Project Management Plan (PMP) that lays out the Contractor s approach, timeline and tools shall be provided.
A quality PMP is provided and updated annually.
95%
Contractor-provided data
Annually
The Contractor shall contact the COR to set up semiannual evaluation meetings
Semi-annual meetings are held
90%
100% Inspection
Semi-annually
The Contractor shall prepare agendas and minutes for semi-annual contract meetings
Agendas and minutes for semi-annual meetings are prepared
85%
Contractor-provided Data
Semi-annually
The Contractor will complete all government-mandated training as required
All required training for all contract staff is completed before an over-due report is generated
100%
100% Inspection
Annually
1. Administrative Help Desk Support: The Contractor will provide administrative support to ORPP&E.
All deliverables completed according to timeline and standards in the approved PMP
90%
Random Sampling;
100% Inspection
In accordance with the approved PMP
2. Meeting and Training Support Education and Training: The Contractor shall provide administrative support to ORPP&E s education and training program.
All deliverables completed according to timeline and standards in the approved PMP.
90%
Random Sampling;
100% Inspection
In accordance with the approved PMP
3. Meeting and Training Support VAIRRS Program: The Contractor shall provide administrative support to the VAIRRS Program.
All deliverables completed according to timeline and standards in the approved PMP.
90%
Random Sampling;
100% Inspection
In accordance with the approved PMP
4. VA Central IRB Protocol Review and Processing: The Contractor shall support the VA CIRB by processing new study submissions and managing post-approval monitoring.
All deliverables completed according to timeline and standards in the approved PMP.
90%
Random Sampling; 100% Inspection
In accordance with the approved PMP
5. VA Central IRB Support Meeting Support: The Contractor shall provide pre-meeting, meeting and post-meeting support to all panels of the VA CIRB.
All deliverables completed according to timeline and standards in the approved PMP.
90%
Random Sampling; 100% Inspection
In accordance with the approved PMP
VA Central IRB Support Administrative Support: The Contractor shall provide administrative support to the VA CIRB as needed.
All deliverables completed according to timeline and standards in the approved PMP.
90%
Random Sampling; 100% Inspection
In accordance with the approved PMP
Regulatory and Policy Support Implementation of the Cooperative Research Provision/Single IRB Requirement
All deliverables completed according to timeline and standards in the approved PMP.
90%
Random Sampling; 100% Inspection
In accordance with the approved PMP
7.0 TASK REVIEWS
The Contractor shall notify the CO/COR and VA PM as soon as it becomes apparent to the Contractor that a scheduled delivery shall be late. The Contractor shall include in the notification the rationale for late delivery, the expected date for the delivery and the projected impact. The CO/COR will review the proposed schedule and provide guidance to the Contractor; all contract changes will be via written modification signed by the Contracting Officer. Prompt notification of delay does not limit the Government's right to all rights and remedies up to and including termination.
All deliverables will be reviewed for content, completeness, accuracy, and conformance to task order requirements by the CO/COR and/or his/her presentative. Reviews will include validation of information as specified in the contract. All deliverables will be checked to ensure the completeness, quality, and adequacy of all deliverables.
The Government requires a period not to exceed thirty (30) days after receipt of written deliverable items for inspection and acceptance or rejection. Inspection and acceptance of all work performance, reports and other deliverables under this task order shall be performed by the COR. The Government s written approval of the draft and final documents shall constitute acceptance by the VA.
8.0 KEY PERSONNEL
a. The Contractor will propose labor categories they deem essential for successful contractor accomplishment of the work to be performed under this contract and subsequent task orders and option. These individuals are defined as Key Personnel and are those persons whose résumés shall be submitted and marked by the contractor as Key Personnel through submission of the Technical Capability. Substitutions shall only be accepted if in compliance with the Substitution of Key Personnel provision identified below.
b. Key Personnel shall include as a minimum: one Program Manager, five Protocol Coordinators, and one qualified technical writer/editor. Additional positions may be added by agreement between the government and the contract and outlined on a contract modification.
c. The Program Manager is responsible for direct communication with the VA COR. She/he shall have a Master s Degree from a recognized institute of higher education; shall have a minimum of 5 years experience in research administration and oversight and a minimum of 3 years of management and supervisory experience.
d. The Protocol Coordinators shall be assigned to the VA CIRB and may support any of the VA CIRB panels. Protocol Coordinators shall be technically sufficient in written and oral communication and shall have a minimum of 3 years experience working in an IRB performing reviews of non-exempt human subject research.
e. The Technical Writer/Editor is responsible for preparing the IRB agenda and meeting minutes and ensuring that all prepared meeting minutes meet all regulatory and policy requirements as well as all requirements specified in VA CIRB SOPs. In addition to the preparation of VA CIRB meeting agenda and meeting minutes, the Technical Writer shall assist the VA CIRB Panel and Network Administrators in the preparation, review and editing of letters, forms, and VA CIRB SOPs. This includes development of document and email templates with periodic review for consistency, accuracy, and as needed personalization based on review/specific situation. The Technical Writer/Editor shall hold at least a Baccalaureate degree in English, Journalism, or other appropriate field of study and have a minimum of 3 years experience with an IRB.
f. The Contractor shall demonstrate the appropriate mix and balance of education, academic excellence, training and experience.
g. The proposed Key Personnel shall be familiar with the functions of the Institutional Review Board, the Common Rule, and FDA regulations.
h. The Contractor shall identify the specific responsibilities for each key role within the Management Plan.
i. The Contractor shall be available for consultation with VA from 8 am to 4:30 pm Eastern Time.
j. The Contractor shall notify VA CO in writing within 10 business days of any changes in management plan.
All departing key personnel shall be replaced within 60 calendar days from the last date of employment. The Contractor shall make every effort to replace departing personnel as quickly as possible. The Contractor will provide written notification of departure, indicating the last date of employment.
8.1 Substitution of Key Personnel.
Any personnel the contractor offers as substitutes shall have the ability and qualifications equal to or better than the key personnel who are being replaced. Requests to substitute personnel must be approved by the COR and the CO. All requests for approval of substitutions in personnel shall be submitted to the COR and the CO within 30 calendar days prior to making any change in key personnel. The request shall be written and provide a detailed explanation of the circumstances necessitating the proposed substitution. The contractor shall submit a complete resume for the proposed substitute.
The Contractor shall be responsible for managing and overseeing the activities of all Contractor personnel, as well as subcontractor efforts used in performance of this effort, if applicable. The Contractor s management responsibilities shall include all activities necessary to ensure the accomplishment of timely, effective, professional, and high-quality support, performed in accordance with the requirements contained herein.
9.0 GOVERNMENT-FURNISHED EQUIPMENT (GFE)/GOVERNMENT-FURNISHED INFORMATION (GFI)
The contractor will be loaned a VA computer, PIV and CAG access.
10.0 SECURITY REQUIREMENTS
The contractor will need access to VA systems to perform work on this contract. The following security requirements apply to the contractor:
10.1 POSITION/TASK RISK DESIGNATION LEVEL(S)
Position Sensitivity
Background Investigation (in accordance with Department of Veterans Affairs 0710 Handbook, Personnel Suitability and Security Program, Appendix A)
Low / Tier 1
Tier 1 / National Agency Check with Written Inquiries (NACI) A Tier 1/NACI is conducted by OPM and covers a 5-year period. It consists of a review of records contained in the OPM Security Investigations Index (SII) and the DOD Defense Central Investigations Index (DCII), Federal Bureau of Investigation (FBI) name check, FBI fingerprint check, and written inquiries to previous employers and references listed on the application for employment. In VA it is used for Non-sensitive or Low Risk positions.
Moderate / Tier 2
Tier 2 / Moderate Background Investigation (MBI) A Tier 2/MBI is conducted by OPM and covers a 5-year period. It consists of a review of National Agency Check (NAC) records [OPM Security Investigations Index (SII), DOD Defense Central Investigations Index (DCII), FBI name check, and a FBI fingerprint check], a credit report covering a period of 5 years, written inquiries to previous employers and references listed on the application for employment; an interview with the subject, law enforcement check; and a verification of the educational degree.
High / Tier 4
Tier 4 / Background Investigation (BI) A Tier 4/BI is conducted by OPM and covers a 10-year period. It consists of a review of National Agency Check (NAC) records [OPM Security Investigations Index (SII), DOD Defense Central Investigations Index (DCII), FBI name check, and a FBI fingerprint check report], a credit report covering a period of 10 years, written inquiries to previous employers and references listed on the application for employment; an interview with the subject, spouse, neighbors, supervisor, co-workers; court records, law enforcement check, and a verification of the educational degree.
The position sensitivity and the level of background investigation commensurate with the required level of access for the following tasks within the PWS are:
Position Sensitivity and Background Investigation Requirements by Task
Task Number
Tier1 / Low / NACI
Tier 2 / Moderate / MBI
Tier 4 / High / BI
All Tasks
x
The Tasks identified above and the resulting Position Sensitivity and Background Investigation requirements identify, in effect, the Background Investigation requirements for Contractor individuals, based upon the tasks the particular Contractor individual will be working. The submitted Contractor Staff Roster must indicate the required Background Investigation Level for each Contractor individual based upon the tasks the Contractor individual will be working, in accordance with their submitted proposal.
The C&A requirements do not apply, and a Security Accreditation Package is not required.
10.2 CONTRACTOR PERSONNEL SECURITY REQUIREMENTS
Contractor Responsibilities:
The Contractor shall prescreen all personnel requiring access to the computer systems to ensure they maintain the appropriate Background Investigation.
The Contractor shall bear the expense of obtaining background investigations.
Within 3 business days after award, the Contractor shall provide a roster of Contractor and Subcontractor employees to the COR to begin their background investigations. The roster shall contain the Contractor s Full Name, Full Social Security Number, Date of Birth, Place of Birth, and individual background investigation level requirement. The preferred method to send the Contractor Staff Roster or Social Security Number is by encrypted e-mail. If unable to send encrypted e-mail, other methods which comply with FIPS 140-2 are to encrypt the file, use a secure fax, or use a traceable mail service.
The Contractor should coordinate the location of the nearest VA fingerprinting office through the COR. Only electronic fingerprints are authorized.
The following forms are required to be completed:
Optional Form 306;
Self-Certification of Continuous Service;
VA Form 0710; and
Completed Security and Investigations Center (SIC) Fingerprint Request Form.
The Contractor personnel will receive an email notification from the Security and Investigation Center (SIC), through the Electronics Questionnaire for Investigations Processes (e-QIP) identifying the website link that includes detailed instructions regarding completion of the investigation documents (NACI-SF85). The Contractor personnel shall submit all required information related to their background investigations utilizing the Office of Personnel Management s (OPM) Electronic Questionnaire for Investigations Processing (e-QIP).
The Contractor shall complete the e-QIP questionnaire and digitally sign e-QIP within 7 days of receipt of initiation email. The Contractor shall print the signature pages, and send them to the COR for electronic submission to the SIC. These should be submitted to the COR within 7 days of receipt of the e-QIP notification email.
The Contractor shall be responsible for the actions of all personnel provided to work for VA under this contract. In the event that damages arise from work performed by Contractor provided personnel, under the auspices of this contract, the Contractor shall be responsible for all resources necessary to remedy the incident.
A Contractor may be granted unescorted access to VA facilities and/or access to VA Information Technology resources (network and/or protected data) with a favorably adjudicated Special Agreement Check (SAC) or Closed, No Issues (SAC) finger print results, training delineated in VA Handbook 6500.6 (Appendix C, Section 9), and, the signed Contractor Rules of Behavior. However, the Contractor will be responsible for the actions of the Contractor personnel they provide to perform work for VA. The investigative history for Contractor personnel working under this contract must be maintained in the database of the Office of Personnel Management (OPM).
The Contractor, when notified of an unfavorably adjudicated background investigation on a Contractor employee as determined by the Government, shall withdraw the employee from consideration in working under the contract.
Failure to comply with the Contractor personnel security investigative requirements may result in termination of the contract for default.
Attachment 1: FY21 VA CIRB Meeting Schedule
2021 VA Central IRB Panel Meeting Dates
Application forms for submission of new projects to the VA Central IRB can be found on the VA Central IRB public website at:
http://www.research.va.gov/vacentralirb/forms/default.cfm.
Study teams should contact the VA Central IRB Administrator prior to submitting a new study application for additional guidance. All required documents must be submitted and the application complete before a project is added to a meeting agenda.
This schedule reflects the first six months of the year. The schedule will be re-evaluated mid-year and then the schedule for the rest of the year will be published.
Panel 1 Panel 2
January 15 January 8
January 29 February 5
February 19 February 26
March 5 March 12
March 19 March 26
April 2 April 9
April 16 April 23
April 30 May 7
May 14 May 21
June 4 June 11
June 18 June 25
This is a requirement for administrative and technical assistance as detailed in the SOW. All responses shall include information which demonstrates, as a minimum, equivalency to the characteristics shown above.
The attached solicitation contains all applicable provisions and clauses which apply to this acquisition:
Additional contract requirement(s) or terms and conditions determined by the contracting officer:
Set Aside Cascading set-aside procedures.
Any award resulting from this solicitation will be made using a cascading set-aside order of precedence as follows:
1. In accordance with FAR Subpart 19.1405 and VAAR Subpart 819.7005, any award under this solicitation will be made on a competitive basis first to an eligible Service Disabled Veteran Owned small business [SDVOSB] concern provided that the conditions of 38 U.S.C. 8127(d) are met (the VA Rule of Two) whereby the Contracting Officer receives adequate competition of two or more small business concerns owned and controlled by Veterans, and that the award can be made at a fair and reasonable price that offers the best value to the United States.
2. If there is inadequate competition for award to an SDVOSB concern, the SDVOSB set-aside shall be withdrawn and cascaded to the next contracting order of priority in accordance with VAAR 819.7004, which is Veteran Owned Small Businesses (VOSB) and conducted in accordance with the procedures set forth in VAAR 819.7006 provided that the conditions of 38 U.S.C. 8127(d) are met (the VA Rule of Two) whereby the Contracting Officer receives adequate competition of two or more small business concerns owned and controlled by Veterans, and that the award can be made at a fair and reasonable price that offers the best value to the United States.
3. If there continues to be inadequate competition between SDVOSB and VOSB concerns, the cascading will continue through the contracting order of priority in accordance with VAAR 819.7004 and FAR 19.203. If the contracting officer determines that offers from small business concerns do not meet the solicitation requirements in terms of technical acceptability, past performance, and fair market price, the small business set-aside[s] will be withdrawn and award will be made on the basis of full and open competition.
Adequate competition:
Adequate competition shall be deemed to exist if At least two competitive offers are received from qualified, responsible business concerns at the set-aside tier under consideration; and Award could be made at fair market price as determined in accordance with FAR 19.202-6.
The VA contracting officer reserves the right to consider competitive proposals submitted from all responsible offerors (including large businesses) in determining the fair market price.
Question submission: All questions are due before 7/29/2021 at 10:00 AM (EST). No questions will be accepted after that date/time.
Due date and submission of quotes:
The quotes are due on 8/23/2021 at 10:00 AM (EST) and shall be directed electronically to Michael.haydo@va.gov. Quotes shall be marked with the solicitation number.
Information regarding the solicitation can be addressed to the Contracting Officer, Michael Haydo, michael.haydo@va.gov
Attachments
| File | Type | Posted |
|---|---|---|
| 36C24E21R0022_6.docx | DOCX document | |
| Questions 3.pdf | ||
| 36C24E21R0022_5.docx | DOCX document | |
| 36C24E21R0022_4.docx | DOCX document | |
| Questions 2.pdf | ||
| Questions 1.pdf | ||
| 36C24E21R0022 3.pdf | ||
| 36C24E21R0022_3.docx | DOCX document | |
| 36C24E21R0022_2.docx | DOCX document | |
| 36C24E21R0022-2.pdf | ||
| 36C24E21R0022_1.docx | DOCX document | |
| 36C24E21R0022.pdf |
Show all 12
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity