Purchase of Culvert Materials for Ouachita National Forest, Arkansas
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 12444026Q0168
- Agency
-
Forest Service
Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- PSC
- 4710 Pipe, Tube And Rigid Tubing
- Place of performance
- Arkansas 71957, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Agriculture Forest Service seeks purchase of culvert materials for the Ouachita National Forest in Arkansas, with proposals due August 16, 2026. The procurement is a Total Small Business set-aside.
Place of performance is Mt. Ida, Arkansas. The contractor shall supply 40 units of 18-inch diameter, 30-foot length, 16-gauge aluminized type 2 culverts; 20 units of 24-inch diameter, 30-foot length; 10 units of 30-inch diameter, 30-foot length; and 10 units of 36-inch diameter, 36-foot length culverts, plus culvert bands in specified sizes (10 for 18-inch diameter, 4 each for 24-inch, 30-inch, and 36-inch diameters). Polymeric-coated corrugated steel pipe may be substituted for aluminum-coated, type 2 corrugated steel pipe and will be considered as equal for payment, provided the coating thickness is 10 mils inside and outside. All exposed metal or areas where polymeric or aluminum coating is damaged shall be painted with zinc dust-zinc oxide powder conforming to Federal Specification TT-P-641 or MIL-P-21085, and a two-component epoxy paint, "Scotch Clad" 2M, PPG or equal. Delivery is FOB destination to Ouachita National Forest, 295 Seed Orchard Road, Mt. Ida, Arkansas 71957. The contractor is responsible for offload and movement to a location identified by the Contracting Officer.
Period of performance is August 17, 2026, through November 30, 2026, with 90-day delivery following award. The NAICS code is 237310 (Highway, Street, and Bridge Construction); PSC is 4710 (Pipe, Tube And Rigid Tubing). Award will be made to the highest technically rated offeror with fair and reasonable pricing and acceptable or neutral past performance. All items must have clear traceability to the original equipment manufacturer and include a Certificate of Conformance.
Notice text
2 versions
Update #2 · Latest ·
*see attachment
*Vendor is responsible for offload and movement to a location ID'd by the COR
I. STATEMENT OF WORK (SOW)
This project consists of supplying culverts to the Ouachita National Forest for installation by forest service employees on an as needed basis. Contractor shall supply the following:
40 – 18” diameter, 30’ length, 16ga aluminized type 2 culverts
20 – 24” diameter, 30’ length, 16ga aluminized type 2 culverts
10 – 30” diameter, 30’ length, 16ga aluminized type 2 culverts
10 – 36” diameter, 36’ length, 16ga aluminized type 2 culverts
10 – 18” diameter, aluminized type 2 culvert bands
4 – 24” diameter, aluminized type 2 culvert bands
4 – 30” diameter, aluminized type 2 culvert bands
4 – 36” diameter, aluminized type 2 culvert bands
POLYMERIC COATED CORRUGATED STEEL PIPE MAY BE SUBSTITUTED FOR ALUMINUM COATED, TYPE 2 CORRUGATED STEEL PIPE AND WILL BE CONSIDERED AS EQUAL FOR PAYMENT. WHERE POLYMERIC COATED PIPE IS USED, THICKNESS OF COATING SHALL BE 10 MILS INSIDE AND 10 MILS OUTSIDE. ALL EXPOSED METAL OR AREAS OF PIPE WHERE POLYMERIC OR ALUMINUM COATING IS DAMAGED SHALL BE PAINTED WITH A ZINC DUST-ZINC OXIDE POWDER CONFORMING TO FEDERAL SPECIFICATION TT-P-641 OR MIL-P-21085 AND A TWO COMPONENT EPOXY PAIN, "SCOTCH CLAD", 2M, PPG OR EQUAL.
DELIVERY FOB LOCATION:
OUACHITA NATIONAL FOREST
295 SEED ORCHARD ROAD
MT ISA, AR 71957
Period of Performance: 08-17-2026 thru 11-30-2026 - 90 Day ARO
Update #1 ·
*see attachment
I. STATEMENT OF WORK (SOW)
This project consists of supplying culverts to the Ouachita National Forest for installation by forest service employees on an as needed basis. Contractor shall supply the following:
40 – 18” diameter, 30’ length, 16ga aluminized type 2 culverts
20 – 24” diameter, 30’ length, 16ga aluminized type 2 culverts
10 – 30” diameter, 30’ length, 16ga aluminized type 2 culverts
10 – 36” diameter, 36’ length, 16ga aluminized type 2 culverts
10 – 18” diameter, aluminized type 2 culvert bands
4 – 24” diameter, aluminized type 2 culvert bands
4 – 30” diameter, aluminized type 2 culvert bands
4 – 36” diameter, aluminized type 2 culvert bands
POLYMERIC COATED CORRUGATED STEEL PIPE MAY BE SUBSTITUTED FOR ALUMINUM COATED, TYPE 2 CORRUGATED STEEL PIPE AND WILL BE CONSIDERED AS EQUAL FOR PAYMENT. WHERE POLYMERIC COATED PIPE IS USED, THICKNESS OF COATING SHALL BE 10 MILS INSIDE AND 10 MILS OUTSIDE. ALL EXPOSED METAL OR AREAS OF PIPE WHERE POLYMERIC OR ALUMINUM COATING IS DAMAGED SHALL BE PAINTED WITH A ZINC DUST-ZINC OXIDE POWDER CONFORMING TO FEDERAL SPECIFICATION TT-P-641 OR MIL-P-21085 AND A TWO COMPONENT EPOXY PAIN, "SCOTCH CLAD", 2M, PPG OR EQUAL.
DELIVERY FOB LOCATION:
OUACHITA NATIONAL FOREST
295 SEED ORCHARD ROAD
MT ISA, AR 71957
Period of Performance: 08-17-2026 thru 11-30-2026 - 90 Day ARO
Files
| File | Type | Posted |
|---|---|---|
| C04_Solicitation Template _12444026Q0168.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Purchase of Culvert Materials for Ouachita National Forest, Arkansas | Award Notice | |
| This notice | Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Womble Work Center Fiber Optic Installation | Region 8 - Southern Region | Total Small Business | |
| Purchase of 2 or 3 Temporary Road Bridges | Forest Service | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity