Programmable Logical Controller (PLC) Upgrade (Parts/Supplies)
Closed Solicitation Posted
- Solicitation number
- W9127N22Q0107
- Agency
- ENDIST Portland US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 335314 Relay and Industrial Control Manufacturing
- PSC
- 5963 Electronic Modules
- Place of performance
- Lowell, Oregon 97452, United States
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
CLIN: DESCRIPTION MFR Part No MANUFACTURER QTY
0001 3MB Processor W/Ethernet 1756-L81E ALLEN BRADLEY 4
0002 Dual Copper Ethernet Communication Module 1756-EN2TR ALLEN BRADLEY 4
(NOTE: ABOVE REQUIREMENTS ARE SOLE SOURCE THROUGH NORTH COAST ELECTRIC - SUBSTITUTES (OR EQUALS) WILL BE REJECTED/NOT CONSIDERED. SEE SOLICITATION FOR FURTHER DETAILS.)
BASIS: The PLCs for the Flood Dams throughout the South Willamette Valley are being upgraded to the current technology to increase reliability, parts sustainability, cyber security compliance, decrease in maintenance and suitability of network interface with current technology. The specific model and part numbers of the associated components are necessary to maintain consistency of PLC parts, network interface with GDACS software, cyber security compliance, reduction in spare parts for PLCs and standardization in parts that are already installed throughout the South Willamette Valley.
Update #1 ·
CLIN: DESCRIPTION MFR Part No MANUFACTURER QTY
0001 3MB Processor W/Ethernet 1756-L81E ALLEN BRADLEY 4
0002 Dual Copper Ethernet Communication Module 1756-EN2TR ALLEN BRADLEY 4
0003 Modbus Comm Module MVI56E-MCM ProSoft 1
(NOTE: ABOVE REQUIREMENTS ARE BRAND NAME ONLY - SUBSTITUTES (OR EQUALS) WILL BE REJECTED/NOT CONSIDERED. SEE SOLICITATION FOR FURTHER DETAILS.)
BASIS: The PLCs for the Flood Dams throughout the South Willamette Valley are being upgraded to the current technology to increase reliability, parts sustainability, cyber security compliance, decrease in maintenance and suitability of network interface with current technology. The specific model and part numbers of the associated components are necessary to maintain consistency of PLC parts, network interface with GDACS software, cyber security compliance, reduction in spare parts for PLCs and standardization in parts that are already installed throughout the South Willamette Valley.
Attachments
| File | Type | Posted |
|---|---|---|
| A.02 Brand Name Determination - PLC_Upgrade OT Parts (Redacted Version 2) KO Signed.pdf | ||
| B.08 Solicitation Amendment 22Q01070001.pdf | ||
| A.02 Brand Name Determination - PLC_Upgrade OT Parts (Redacted Version) KO Signed.pdf | ||
| B.08_Combined Synopsis-Solicitation_7N22Q0107 Rev 2.pdf |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity