Procurement of Preventative Maintenance service for Stratasys Fortus 450MC 3D Printer located at the Corpus Christi Army Depot (CCAD). Base plus 3 option years.
Closed Solicitation Posted
- Solicitation number
- W912NW-25-Q-0052
- Agency
-
ACC Redstone
Army Contracting Command, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 811310 Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance
- Place of performance
- Corpus Christi, Texas 78419, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Army Materiel Command Contracting Command Redstone Arsenal is seeking preventative maintenance services for a Stratasys Fortus 450MC 3D Printer located at the Corpus Christi Army Depot (CCAD). This is a sole source procurement with Stratasys Inc., the original equipment manufacturer, to provide comprehensive maintenance support. The contract includes a base year and three option years, focusing on hardware and software updates, print head discounts, and on-site service visits performed by a certified Stratasys service representative. Offers for the solicitation (W912NW-25-Q-0052) are due by 3:00 PM on May 19, 2025, with market research confirming Stratasys as the sole viable service provider. The procurement falls under NAICS code 811310 for commercial and industrial machinery repair and maintenance, with a $12,500,000 size standard.
The contract is an unrestricted procurement with no specific set-aside designations, targeting annual preventative maintenance for the advanced manufacturing 3D printer at CCAD. The estimated value of the current procurement is approximately $19,069, covering the period from November 15, 2024, to February 28, 2025, and funded through Army Working Capital Funds for fiscal year 2025. The place of performance is located in Corpus Christi, Texas (78419), with the contractor required to comply with specific security protocols, including anti-terrorism and OPSEC training. The previous maintenance contract (W912NW-22-P-0071) was awarded to Stratasys Inc. on June 17, 2022, for $40,150, establishing a precedent for this continued sole source approach. The contract will require the contractor to provide comprehensive service reports, backup printing services, and adhere to strict installation access and security protocols.
Notice text
Sole Source Procurement of Preventative Maintenance service for Stratasys Fortus 450MC 3D Printer located at the Corpus Christi Army Depot (CCAD).Base plus 3 option years.
Files
| File | Type | Posted |
|---|---|---|
| W912NW-25-Q-0052.pdf | ||
| REDACTED Limiting-Competition-under-SAT_ACC.docx | DOCX document |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Laser Cutting Machine Preventive Maintenance | ACC Redstone | No set-aside | |
| Colibrium GEM2 Maintenance | Naval Air Warfare Center | No set-aside | |
| Grid Logic Inc. Maintenance Agreement for Additive Manufacturing Machine | ACC Aberdeen Proving Ground | No set-aside | |
| Preventative Maintenance and Repairs | ACC Warren | No set-aside | |
| C27-005 AMT equipment maintenance | Air Force Sustainment Center | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity