Probabilistic 3D Outer Zone Radiation Belt Model

Closed Solicitation Posted

Solicitation number
SF24B-T006
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

More information

Notice details come from DoD SBIR/STTR (DSIP). Updated .

About this opportunity

The Department of the Air Force Materiel Command seeks Phase I STTR proposals under DoD topic SF24B-T006 for a Probabilistic 3D Outer Zone Radiation Belt Model. The June 12, 2024 proposal deadline has passed. The procurement is set aside for Total Small Business and is ITAR-controlled.

The topic calls for a predictive three-dimensional radiation belt model that forecasts energetic electron flux from 500 keV to greater than 2 MeV for up to 7 days, with probabilities and confidence levels, to support an "All Clear" or internal-charging hazard forecast for satellites. Per the topic file summary, Phase I requires accurate specification of 0.75 to 6 MeV and >2 MeV fluxes from operational data, plus 24- and 48-hour forecasts. Phase II requires real-time performance using only operational data and comparison with a partner-developed model.

STTR structure is mandatory: the small business must perform at least 40% of the work, and a single research institution partner must perform at least 30%, with no deviations permitted. All research and development must be performed in the United States unless the Air Force approves otherwise in writing for rare circumstances. Offerors must disclose any proposed foreign nationals, their countries of origin, and visa or work permit types, and the Key Personnel section must identify all key staff.

Per the proposal instructions file summary, Phase I proposals require six volumes submitted through the Defense SBIR/STTR Innovation Portal, with a Technical Volume capped at 20 pages and a Cost Volume itemizing direct labor by name and hourly rate. The maximum Phase I award is $180,000 over a maximum performance period of six months. Proposals exceeding these maximums are disqualified, and pages beyond stated limits will not be reviewed. The Air Force anticipates completing evaluation and selection within approximately 90 calendar days of solicitation close. Per the topic file summary, no CMMC level requirement applies.

Notice text

DoD STTR topic SF24B-T006

Component: USAF

Command: AFMC

Phase: STTR Phase I

Technology Areas: Space Platforms

Focus Areas: Space Technology

Keywords: Radiation Belts; Outer-Zone; Forecast; Prediction

ITAR: Yes

Objective:

The objective of this topic is to create an accurate predictive 3 dimensional radiation belt model which can support a capability that can provide an actionable forecast for "All Clear" or give the likelihood of an internal charging hazard. This will require forecasts of flux levels at a range of energies from as low as 500 keV to >2MeV electrons. The forecasts should be for up to 7 days, with probabilities and confidence levels. While the confidence levels at higher that 2 or 3 days out will likely be small given the current level of science, this will give us a base to work from for future improvements.

Description:

The outer-zone radiation belts are a highly variable and dynamic population of very energetic electrons that exist between about 10,000 km and 40,000 km above the Earth’s surface at the equator, but penetrate to Low Earth Orbit at high latitudes. They can penetrate satellite surfaces and deposit their charge into or near the interior electronics, which can lead to damaging discharges. With the recent National Defense Strategy’s emphasis on resilient satellites, it is important to develop specification and forecast capabilities that can provide good estimates of the current and near future radiation belt threat levels to allow decision makers the best knowledge of the environment when planning upcoming operations. A knowledge of the environment also allows satellite operators the ability to quickly determine the probability of space environment contributions to anomalies, and more readily ascertain the possibility of pacing competitor "gray zone" activities that could lead to satellite malfunctions.

Current operational specification and forecast models such as the Spacecraft Environmental Anomalies Expert System – Real time (SEAESRT) and the Relativistic Electron Forecast Model used by the National Oceanic and Atmospheric Administration/Space Weather Prediction Center (NOAA/SWPC) only address geosynchronous orbit. Current science addresses the full outer-zone electron radiation belts, and should be able to significantly improve upon the existing capability. Some example 3D radiation belt models are the AFRL model [1], Dynamic Radiation Environment Assimilation Model (DREAM) [2], the British Antarctic Survey Radiation Belt Model [3] and others. For forecasting there are current efforts from simple approaches such as The Satellite Risk Prediction and Radiation Forecast System (SaRIF), to sophisticated efforts like SafeSpace model [5].

This is a call for new capabilities that can specify and forecast the energetic electron fluxes in the outer-zone for up to 7 days. These nowcasts and forecasts should include the probabilities of different flux levels at locations within the region and the confidence level of each probability. These fluxes will be used to drive a hazard specification capability.

Phase I:

Demonstrate a capability that can accurately specify hazardous radiation belt fluxes for energies in the range from 0.75 to 6 MeV and >2MeV using operational data.

1. The fluxes must be specified throughout the outer radiation belt zone using accuracy and bias metrics which will be provided and for periods of time which will be specified. 2. There will also be a demonstration that the capability can make accurate 24 and 48 hour forecasts of the same fluxes throughout the radiation belts with acceptable probabilities and confidence levels, using the provided metrics.

AFRL will specify the observations to be used for the truth data.

Phase II:

Phase II will have X objectives:

1. Demonstrate that the performance in Phase I can be obtained with a real-time model that only uses operational data.2. The specification will be demonstrated for a more significant time period, as will the original forecast. 3. The forecast with probabilities and confidence levels will be extended to 7 days, we will look for a reasonable fall-off in accuracy with time.4. The capability will be compared with a model being developed by a partner.

AFRL will specify the observations to be used for the truth data.

If the results are satisfactory, we will recommend this model to our customers, who will be following the effort, for a phase III transition.

Phase III:

The phased III will have as objectives:

1. Further validation of the model to provide our customer with a more complete understanding of the model's strengths and weaknesses.2. Where time and resources permit, there may be further upgrades to the model based on the previous validation results.3. The main effort in phase III will be to produce an Algorithm Theoretical Basis Document and provide support to the team transitioning the capability to operations.

Files

File Type Posted
AF_STTR_24B_v3.pdf PDF
SF24B-T006.pdf PDF

Similar open opportunities

Opportunity Agency Set-aside Responses due
AFTAC Broad Agency Announcement (BAA) 2024 Patrick AFB, Florida 32925, United States · NAICS 541 Air Combat Command No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors