Pre-Solicitation Notice - Trenching, Conduit and Ground-well Installation
Closed Pre-Solicitation Posted
- Solicitation number
- PR16330526
- Agency
-
Department of State
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 238910 Site Preparation Contractors
- PSC
- J038 Maint/Repair/Rebuild Of Equipment- Construction/Mining/Excavating/Highway Maintenance Equipment
- Place of performance
- Saint Andrew Saint Andrew Jamaica
- Points of contact
-
- Handel Blake blakeha@state.gov (876) 702-6393
- U.S. Embassy Kingston Procurement Office kingston.quotes@state.gov (876) 702-6000
Notice details come from SAM.gov. Updated .
About this opportunity
The United States Embassy in Kingston, Jamaica, is preparing to issue a Request for Quotations for trenching, conduit, and ground-well installation at the Embassy compound, with interested vendors due to submit interest by October 26, 2026 at 2:00 p.m. local time. No set-aside applies.
Work is performed at the Embassy compound in Kingston, Jamaica. The contractor will provide all labor, equipment, supervision, materials, backfilling, compaction, and project management for infrastructure support system installation across thirteen identified locations. Before excavation, the contractor must locate and verify all existing utilities; if excavation interferes with existing drains, piping, or structures, the contractor must immediately notify the Contracting Officer Representative in writing and provide temporary protection before proceeding. The contractor shall make wall penetrations into existing manholes and handholes as required for conduit entry and exit.
Installation specifications include Schedule 80 PVC conduit with minimum 24-inch cover from finished grade underground, or as indicated on drawings, whichever is greater. All underground 90-degree bends with 12-inch radius shall use prefabricated sweeping bends. Above-grade conduit must transition to rigid galvanized steel using PVC-to-RGS couplers. The contractor must install pull lines in all new conduit runs. Soil and backfill materials must meet ASTM D 2487 soil classification standards for select backfill, with compaction to 85 percent of maximum dry unit weight per ASTM D 1557 in controlled layers not exceeding 8 inches for heavy equipment or 4 inches for hand-operated tampers.
Anticipated period of performance is 21 days after contract award. Offerors must maintain active SAM.gov registration at proposal submission and award, and obtain local insurance and Defense Base Act insurance. The solicitation will post exclusively on SAM.gov; no paper copies will be issued.
Notice text
Description
The United Stated Embassy in Kingston, Jamaica, plans to issue a Request for Quotations (RFQ) for trenching, conduit and ground-well installation in various locations on the Embassy compound.
Scope of Work: The contractor will provide all labor, equipment, supervision, material specific to the back filling and compaction and management needed to complete the job
Infrastructure Support System - Handhole / Underground Conduit System
Trenching
- Nine locations have been identified requiring trench work.
- Thirteen locations have been identified requiring trench work.
- Before excavation, the Contractor shall locate and verify all existing utilities in the proposed trench alignment.
- If excavation interferes with existing drains, piping, or structures, the Contractor shall immediately notify, in writing, the COR and provide temporary protection for these systems before proceeding.
Trenching from Handholes
- The Contractor shall make wall penetrations into existing manholes/handholes as required for the number and size of conduits entering and exiting each structure, in accordance with the drawings.
Conduit
- Existing conduit shall remain in place unless the drawings specifically direct removal or modification.
- Under grass, soil, the Contractor shall install Schedule 80 PVC conduit with a minimum cover of 24 inches (610 mm) from finished grade to top of conduit, or as indicated on the drawings, whichever is greater.
- All underground 90 degree bends with a 12inch (305 mm) radius shall use prefabricated sweeping bends.
- Above grade, all underground PVC conduit shall transition to rigid galvanized steel (RGS) using PVC to RGS couplers.
- The Contractor shall install pull lines in all new conduit runs.
Soil and Backfill Materials
Soil Materials
The Contractor shall provide all labor and materials for soil and backfill, where required.
- Select Backfill: ASTM D 2487 soil classification groups SW, SP, and SM, or combinations thereof; free of rock or gravel larger than 3 inches (75 mm), debris, waste, frozen materials, vegetation, and other deleterious matter.
- Asphalt/Concrete Base Course: Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; ASTM D 2940; with at least 95% passing a 11/2inch (40 mm) sieve and not more than 8% passing a 1/4inch (6.4 mm) sieve.
- Base Gravel: Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; ASTM D 2940; 100% passing a 1inch (25 mm) sieve and not more than 8% passing a 1/4inch (6.4 mm) sieve.
- Sand Cushion: ASTM C 33 fine aggregate, natural or manufactured sand.
Placement and Compaction
- Place backfill and fill in layers not exceeding:
- 8 inches (203 mm) loose thickness for heavy compaction equipment;
- 4 inches (102 mm) loose thickness when compacted by hand-operated tampers.
- Place backfill and fill evenly to the required elevations, uniformly along their full length.
- Compact soil materials to not less than the following percentages of maximum dry unit weight per ASTM D 1557:
- Under lawns or unpaved areas: scarify and re-compact top 6 inches (152 mm) below subgrade and compact each layer to 85%.
- Utility trenches: compact each layer of initial and final backfill to 85%.
Anticipated Period of Performance: a base period of twenty-one (21) days after contract award
Eligibility and Registration
Offerors must hold an active registration in the System for Award Management (SAM.gov) when they submit a proposal and at award.
Local Insurance and Defense Based Act (DBA) Insurance.
Solicitation Availability
The Embassy will post the solicitation and all amendments only on SAM.gov at https://sam.gov. Interested parties should monitor SAM.gov for the release and any amendments. The Embassy will not issue paper copies.
Disclaimer
This notice is for informational purposes only and is not a request for proposals. It does not commit the Government to issue a solicitation or award a contract. The Government will not pay for any information or materials submitted in response to this notice.
Interested Parties are required to send their interest to Kingstonquotes@state.gov on or before October 26, 2026 at 2pm local time.