Pratt & Whitney Canada (P&WC) PT6C-67C turboshaft engine Maintenance

Closed Pre-Solicitation Posted

Solicitation number
FA8739-1
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
Not on record
Place of performance
Wright Patterson AFB, Ohio 45433, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The United States Air Force Life Cycle Management Center (AFLCMC) is conducting market research to identify qualified contractors capable of providing comprehensive inspection, overhaul, repair, and upgrade services for three Pratt & Whitney Canada (P&WC) PT6C-67C turboshaft engines. The primary objective is to restore these government-provided engines to airworthy status and upgrade them to the PT6C-67C1 configuration for use as spare components in the MH-139A fleet, which provides critical vertical lift support for nuclear weapon convoy escort and 24/7 adverse-weather capable Intercontinental Ballistic Missile (ICBM) emergency security operations. Responses must demonstrate current technological capability and relevant qualifications, with submission requirements including company identification, CAGE code, point of contact information, and documentation of small business status and certifications per NAICS Code 488190. While specific evaluation criteria are not detailed in this pre-solicitation notice, respondents should emphasize their expertise in FAA certification maintenance and complex turboshaft engine restoration. The response deadline is January 15, 2026, providing interested parties approximately 3.5 months to prepare and submit their capability statements.

This pre-solicitation notice involves no set-aside designations, and no incumbent contractor is identified. The procurement encompasses three specific engines with varying service histories: engine PCE-KB0600 (971.8 hours), PCE-KB0711 (946.4 hours), and PCE-KB0466 (4,868 hours), with the highest-hour engine having accumulated 2,747 documented cycles. The engines have not been preserved since their last logbook entries in 2019 and have undergone various testing events including live fire and ingestion testing, which may require extensive remediation work. No specific award value or budget range is disclosed in this market research notice, indicating that cost estimates will depend on contractor proposals. The place of performance will be at the contractor's facility, and interested parties should prepare comprehensive responses documenting their qualifications for this specialized aerospace maintenance and upgrade work.

Notice text

3 versions

Update #3 · Latest ·

Place of performance will be contractor location.

The United States (US) Air Force Life Cycle Management Center (AFLCMC) is conducting market research to identify possible sources capable of providing inspection, overhaul, repair, and upgrade services for three (3) government-provided Pratt & Whitney Canada (P&WC) PT6C-67C turboshaft engines. The goal is to upgrade and return these engines to airworthy status for use as spares in the MH-139A fleet.

The MH-139A aircraft provides vertical lift support for nuclear weapon convoy escort and 24/7 adverse-weather-capable Intercontinental Ballistic Missile (ICBM) emergency security and operational support. The MH-139A fleet has been upgraded to the PT6C-67C1 engine configuration to enhance military use.

The required services include inspecting, overhauling, and repairing the engines, as well as upgrading them to the PT6C-67C1 configuration and maintaining and/or obtaining FAA certification. These engines are currently shelved and cannot be used in the MH-139A.

Engine Details (RFI Revision)

Engine Serial #: PCE-KB0600

Engine Time: 971.8

Last documented cycle 1,233

Engine Serial #: PCE-KB0711

Engine Time: 946.4

Last documented cycle 1,226

Engine Serial #: PCE-KB0466

Engine Time: 4,868

Last documented cycle 2,747

Engines have not been preserved, and the last log-book entries were in 2019. The three engines will have been utilized for various testing event including:  live fire and ingestion testing.

Interested parties who desire to participate in this SSS/RFI are encouraged to submit responses that demonstrate they presently have the technology and qualifications to provide the system described above.  Responses shall include the following information and address the topics below:

  1. Respondent Data:

Company/Institute Name

Address

Point of Contact (to include phone number and email address)

CAGE Code

Web Page URL

Pursuant to NAICS Code 488190, size standard 1500 state whether the company is:

Small Business                                                (Yes / No) Self-Certified or Third Party Certified

Women-Owned Small Business                     (Yes / No) Self-Certified or Third Party Certified

Economically Disadvantaged Women-

Owned Small Business                                  (Yes/No)    Self-Certified or Third Party Certified

HUBZone Certified                            (Yes / No)  Self-Certified or Third Party Certified

Veteran Owned Small Business                      (Yes / No)  Self-Certified or Third Party Certified

Service Disabled Veteran Owned

   Small Business                                             (Yes / No)  Self-Certified or Third Party Certified

8(a) Certified                                      (Yes / No)  Self-Certified or Third Party Certified

 SBA Certification Date: ____________                   SBA Graduation Date: ______________

State whether the company is domestically or foreign-owned (if foreign, indicate the country of ownership).

State whether the respondent is interested in being a prime or subcontractor for this requirement.

State whether the company has FAA Part 145 Certification.

b. Technical Capabilities:

  • Describe your experience in overhauling and upgrading P&WC PT6C series engines, specifically the PT6C-67C.
  • Describe your facility's capabilities to perform all required maintenance, repairs, and upgrades in accordance with P&WC specifications, Service Bulletins (SBs), and Airworthiness Directives (ADs).
  • Describe your experience in obtaining FAA Supplemental Type Certificates (STCs).
  • Provide a detailed description of your proposed approach to inspecting, overhauling, repairing, and upgrading the PT6C-67C engines to the PT6C-67C1 configuration.
  • How would you obtain the necessary technical data and software for the PT6C-67C1 upgrade, considering it is unique to the MH-139A?
  • If you are unable to perform the PT6C-67C1 upgrade, are you able to provide and perform the PT6C-67C overhaul prior to the potential upgrade being completed by another facility?

c. Rough cost estimate (i.e. rough order of magnitude (ROM)) for both inspection, overhaul, and repair; and upgrade the engines to the PT6C-67C1 configuration and obtain FAA certification (this is for Government budget planning purposes and will not be considered a bid or binding in any manner).  Please provide an estimated schedule of completion.

d. Please provide specific details and rationale as to how compliance with Limitations on Subcontracting, would be achieved in the event the Government sets this requirement aside for small business.  Include specific details regarding teaming arrangements, etc.  If subcontracts are to be used, provide the anticipated percentage of effort to be subcontracted and whether small or large businesses will be used.  If this effort is not set-aside for small business, small business utilization will be considered.  Large and small businesses should provide a reasonable expectation for small business utilization as a percent of total contract value as well as supporting rationale for the recommended percentage.

e. Please provide specific details and rationale as to how compliance with FAR 52.219-14, Limitations on Subcontracting, would be achieved in the event the Government sets this requirement aside for small business.  Include specific details regarding teaming arrangements, etc.  If subcontracts are to be used, provide the anticipated percentage of effort to be subcontracted and whether small or large businesses will be used.  If this effort is not set-aside for small business, small business utilization will be considered.  Large and small businesses should provide a reasonable expectation for small business utilization as a percent of total contract value as well as supporting rationale for the recommended percentage.

 RESPONSES, COMMUNICATIONS, AND ADDITIONAL CONSIDERATIONS

  1. Government may contact respondents to obtain additional information or clarification in order to fully understand a company's response.  This may include discussions, site visits, demonstrations, etc. to further the Government's understanding of a proposed solution, as well as a company's understanding of the Government's requirements.
  2. Responses shall not exceed 15 pages (including cover page).  Include technical and descriptive text and photographs/illustrations to provide sufficient detail.  The submitted documentation becomes the property of the United States Government and will not be returned. 
  3. Respondents shall clearly mark proprietary data with the appropriate markings.  Any proprietary information received in response to this request will be properly protected from any unauthorized disclosure.  Any material that is not marked will be considered publicly-releasable. 
  4. When submitting a response, please be aware that the Air Force workforce is supplemented by contracted support personnel.  Any proprietary data submitted may be handled by contract support services personnel who have signed the same Non-Disclosure Agreements (NDAs). 
  5. Broad industry participation for this RFI is encouraged. U.S. and non-U.S. firms are permitted to respond. 
  6. Please note that prospective contractors must be registered in the System for Award Management (SAM) database to be awarded a DOD contract; the NAICS code for this requirement, if applicable to the company’s capabilities, should be included in the company’s NAICS code listing in SAM.  To learn more about this SAM requirement and how to register, please visit the SAM website at: https://www.sam.gov/portal/SAM
  7. Responses are due electronically by 3:00PM Eastern time on 20 October 2025 via email to: 

Contract Specialist: Leighton Smith

AFLCMC/WIH

Email Address: leighton-jon.smith@us.af.mil

Contracting Officer: Jeremy D. Perry

AFLCMC/WIH

Email Address:  jeremy.perry.5@us.af.mil

Program Manager:  Jon Wander

AFLCMC/WIH

Email Address:  jonathan.wander.1@us.af.mil

Update #2 ·

Place of performance will be contractor location.

The United States (US) Air Force Life Cycle Management Center (AFLCMC) is conducting market research to identify possible sources capable of providing inspection, overhaul, repair, and upgrade services for three (3) government-provided Pratt & Whitney Canada (P&WC) PT6C-67C turboshaft engines. The goal is to upgrade and return these engines to airworthy status for use as spares in the MH-139A fleet.

The MH-139A aircraft provides vertical lift support for nuclear weapon convoy escort and 24/7 adverse-weather-capable Intercontinental Ballistic Missile (ICBM) emergency security and operational support. The MH-139A fleet has been upgraded to the PT6C-67C1 engine configuration to enhance military use.

The required services include inspecting, overhauling, and repairing the engines, as well as upgrading them to the PT6C-67C1 configuration and maintaining and/or obtaining FAA certification. These engines are currently shelved and cannot be used in the MH-139A.

Interested parties who desire to participate in this SSS/RFI are encouraged to submit responses that demonstrate they presently have the technology and qualifications to provide the system described above.  Responses shall include the following information and address the topics below:

  1. Respondent Data:

Company/Institute Name

Address

Point of Contact (to include phone number and email address)

CAGE Code

Web Page URL

Pursuant to NAICS Code 488190, size standard 1500 state whether the company is:

Small Business                                                (Yes / No) Self-Certified or Third Party Certified

Women-Owned Small Business                     (Yes / No) Self-Certified or Third Party Certified

Economically Disadvantaged Women-

Owned Small Business                                  (Yes/No)    Self-Certified or Third Party Certified

HUBZone Certified                            (Yes / No)  Self-Certified or Third Party Certified

Veteran Owned Small Business                      (Yes / No)  Self-Certified or Third Party Certified

Service Disabled Veteran Owned

   Small Business                                             (Yes / No)  Self-Certified or Third Party Certified

8(a) Certified                                      (Yes / No)  Self-Certified or Third Party Certified

 SBA Certification Date: ____________                   SBA Graduation Date: ______________

State whether the company is domestically or foreign-owned (if foreign, indicate the country of ownership).

State whether the respondent is interested in being a prime or subcontractor for this requirement.

State whether the company has FAA Part 145 Certification.

b. Technical Capabilities:

  • Describe your experience in overhauling and upgrading P&WC PT6C series engines, specifically the PT6C-67C.
  • Describe your facility's capabilities to perform all required maintenance, repairs, and upgrades in accordance with P&WC specifications, Service Bulletins (SBs), and Airworthiness Directives (ADs).
  • Describe your experience in obtaining FAA Supplemental Type Certificates (STCs).
  • Provide a detailed description of your proposed approach to inspecting, overhauling, repairing, and upgrading the PT6C-67C engines to the PT6C-67C1 configuration.
  • How would you obtain the necessary technical data and software for the PT6C-67C1 upgrade, considering it is unique to the MH-139A?
  • If you are unable to perform the PT6C-67C1 upgrade, are you able to provide and perform the PT6C-67C overhaul prior to the potential upgrade being completed by another facility?

c. Rough cost estimate (i.e. rough order of magnitude (ROM)) for both inspection, overhaul, and repair; and upgrade the engines to the PT6C-67C1 configuration and obtain FAA certification (this is for Government budget planning purposes and will not be considered a bid or binding in any manner).  Please provide an estimated schedule of completion.

d. Please provide specific details and rationale as to how compliance with Limitations on Subcontracting, would be achieved in the event the Government sets this requirement aside for small business.  Include specific details regarding teaming arrangements, etc.  If subcontracts are to be used, provide the anticipated percentage of effort to be subcontracted and whether small or large businesses will be used.  If this effort is not set-aside for small business, small business utilization will be considered.  Large and small businesses should provide a reasonable expectation for small business utilization as a percent of total contract value as well as supporting rationale for the recommended percentage.

e. Please provide specific details and rationale as to how compliance with FAR 52.219-14, Limitations on Subcontracting, would be achieved in the event the Government sets this requirement aside for small business.  Include specific details regarding teaming arrangements, etc.  If subcontracts are to be used, provide the anticipated percentage of effort to be subcontracted and whether small or large businesses will be used.  If this effort is not set-aside for small business, small business utilization will be considered.  Large and small businesses should provide a reasonable expectation for small business utilization as a percent of total contract value as well as supporting rationale for the recommended percentage.

 RESPONSES, COMMUNICATIONS, AND ADDITIONAL CONSIDERATIONS

  1. Government may contact respondents to obtain additional information or clarification in order to fully understand a company's response.  This may include discussions, site visits, demonstrations, etc. to further the Government's understanding of a proposed solution, as well as a company's understanding of the Government's requirements.
  2. Responses shall not exceed 15 pages (including cover page).  Include technical and descriptive text and photographs/illustrations to provide sufficient detail.  The submitted documentation becomes the property of the United States Government and will not be returned. 
  3. Respondents shall clearly mark proprietary data with the appropriate markings.  Any proprietary information received in response to this request will be properly protected from any unauthorized disclosure.  Any material that is not marked will be considered publicly-releasable. 
  4. When submitting a response, please be aware that the Air Force workforce is supplemented by contracted support personnel.  Any proprietary data submitted may be handled by contract support services personnel who have signed the same Non-Disclosure Agreements (NDAs). 
  5. Broad industry participation for this RFI is encouraged. U.S. and non-U.S. firms are permitted to respond. 
  6. Please note that prospective contractors must be registered in the System for Award Management (SAM) database to be awarded a DOD contract; the NAICS code for this requirement, if applicable to the company’s capabilities, should be included in the company’s NAICS code listing in SAM.  To learn more about this SAM requirement and how to register, please visit the SAM website at: https://www.sam.gov/portal/SAM
  7. Responses are due electronically by 3:00PM Eastern time on 20 October 2025 via email to: 

Contract Specialist: Leighton Smith

AFLCMC/WIH

Email Address: leighton-jon.smith@us.af.mil

Contracting Officer: Jeremy D. Perry

AFLCMC/WIH

Email Address:  jeremy.perry.5@us.af.mil

Program Manager:  Jon Wander

AFLCMC/WIH

Email Address:  jonathan.wander.1@us.af.mil

Update #1 ·

The United States (US) Air Force Life Cycle Management Center (AFLCMC) is conducting market research to identify possible sources capable of providing inspection, overhaul, repair, and upgrade services for three (3) government-provided Pratt & Whitney Canada (P&WC) PT6C-67C turboshaft engines. The goal is to upgrade and return these engines to airworthy status for use as spares in the MH-139A fleet.

The MH-139A aircraft provides vertical lift support for nuclear weapon convoy escort and 24/7 adverse-weather-capable Intercontinental Ballistic Missile (ICBM) emergency security and operational support. The MH-139A fleet has been upgraded to the PT6C-67C1 engine configuration to enhance military use.

The required services include inspecting, overhauling, and repairing the engines, as well as upgrading them to the PT6C-67C1 configuration and maintaining and/or obtaining FAA certification. These engines are currently shelved and cannot be used in the MH-139A.

Interested parties who desire to participate in this SSS/RFI are encouraged to submit responses that demonstrate they presently have the technology and qualifications to provide the system described above.  Responses shall include the following information and address the topics below:

  1. Respondent Data:

Company/Institute Name

Address

Point of Contact (to include phone number and email address)

CAGE Code

Web Page URL

Pursuant to NAICS Code 488190, size standard 1500 state whether the company is:

Small Business                                                (Yes / No) Self-Certified or Third Party Certified

Women-Owned Small Business                     (Yes / No) Self-Certified or Third Party Certified

Economically Disadvantaged Women-

Owned Small Business                                  (Yes/No)    Self-Certified or Third Party Certified

HUBZone Certified                            (Yes / No)  Self-Certified or Third Party Certified

Veteran Owned Small Business                      (Yes / No)  Self-Certified or Third Party Certified

Service Disabled Veteran Owned

   Small Business                                             (Yes / No)  Self-Certified or Third Party Certified

8(a) Certified                                      (Yes / No)  Self-Certified or Third Party Certified

 SBA Certification Date: ____________                   SBA Graduation Date: ______________

State whether the company is domestically or foreign-owned (if foreign, indicate the country of ownership).

State whether the respondent is interested in being a prime or subcontractor for this requirement.

State whether the company has FAA Part 145 Certification.

b. Technical Capabilities:

  • Describe your experience in overhauling and upgrading P&WC PT6C series engines, specifically the PT6C-67C.
  • Describe your facility's capabilities to perform all required maintenance, repairs, and upgrades in accordance with P&WC specifications, Service Bulletins (SBs), and Airworthiness Directives (ADs).
  • Describe your experience in obtaining FAA Supplemental Type Certificates (STCs).
  • Provide a detailed description of your proposed approach to inspecting, overhauling, repairing, and upgrading the PT6C-67C engines to the PT6C-67C1 configuration.
  • How would you obtain the necessary technical data and software for the PT6C-67C1 upgrade, considering it is unique to the MH-139A?
  • If you are unable to perform the PT6C-67C1 upgrade, are you able to provide and perform the PT6C-67C overhaul prior to the potential upgrade being completed by another facility?

c. Rough cost estimate (i.e. rough order of magnitude (ROM)) for both inspection, overhaul, and repair; and upgrade the engines to the PT6C-67C1 configuration and obtain FAA certification (this is for Government budget planning purposes and will not be considered a bid or binding in any manner).  Please provide an estimated schedule of completion.

d. Please provide specific details and rationale as to how compliance with Limitations on Subcontracting, would be achieved in the event the Government sets this requirement aside for small business.  Include specific details regarding teaming arrangements, etc.  If subcontracts are to be used, provide the anticipated percentage of effort to be subcontracted and whether small or large businesses will be used.  If this effort is not set-aside for small business, small business utilization will be considered.  Large and small businesses should provide a reasonable expectation for small business utilization as a percent of total contract value as well as supporting rationale for the recommended percentage.

e. Please provide specific details and rationale as to how compliance with FAR 52.219-14, Limitations on Subcontracting, would be achieved in the event the Government sets this requirement aside for small business.  Include specific details regarding teaming arrangements, etc.  If subcontracts are to be used, provide the anticipated percentage of effort to be subcontracted and whether small or large businesses will be used.  If this effort is not set-aside for small business, small business utilization will be considered.  Large and small businesses should provide a reasonable expectation for small business utilization as a percent of total contract value as well as supporting rationale for the recommended percentage.

 RESPONSES, COMMUNICATIONS, AND ADDITIONAL CONSIDERATIONS

  1. Government may contact respondents to obtain additional information or clarification in order to fully understand a company's response.  This may include discussions, site visits, demonstrations, etc. to further the Government's understanding of a proposed solution, as well as a company's understanding of the Government's requirements.
  1. Responses shall not exceed 15 pages (including cover page).  Include technical and descriptive text and photographs/illustrations to provide sufficient detail.  The submitted documentation becomes the property of the United States Government and will not be returned. 
  1. Respondents shall clearly mark proprietary data with the appropriate markings.  Any proprietary information received in response to this request will be properly protected from any unauthorized disclosure.  Any material that is not marked will be considered publicly-releasable. 
  1. When submitting a response, please be aware that the Air Force workforce is supplemented by contracted support personnel.  Any proprietary data submitted may be handled by contract support services personnel who have signed the same Non-Disclosure Agreements (NDAs). 
  1. Broad industry participation for this RFI is encouraged. U.S. and non-U.S. firms are permitted to respond. 
  1. Please note that prospective contractors must be registered in the System for Award Management (SAM) database to be awarded a DOD contract; the NAICS code for this requirement, if applicable to the company’s capabilities, should be included in the company’s NAICS code listing in SAM.  To learn more about this SAM requirement and how to register, please visit the SAM website at: https://www.sam.gov/portal/SAM
  1. Responses are due electronically by 3:00PM Eastern time on 20 October 2025 via email to: 

    Contract Specialist: Leighton Smith

    AFLCMC/WIH

    Email Address: leighton-jon.smith@us.af.mil

    Contracting Officer: Jeremy D. Perry

    AFLCMC/WIH

    Email Address:  jeremy.perry.5@us.af.mil

    Program Manager:  Jon Wander

    AFLCMC/WIH

    Email Address:  jonathan.wander.1@us.af.mil

Similar open opportunities

Opportunity Agency Set-aside Responses due
P&W Tooling Evaluation and Repair Tinker AFB, Oklahoma 73145, United States · NAICS 333514 Air Force Sustainment Center No set-aside
F138-100 engine sustainment Tinker AFB, Oklahoma 73145, United States · NAICS 336412 AFLCMC Tinker AFB No set-aside
Sources Sought for Overhaul/Repair/Upgrade of the UH-60/AH-64 T700 Turbine Engine Supervisory Control Unit NAICS 336412 ACC Redstone No set-aside
ColdSectionModule_End_Item_F100_NSN_2840015806609NZ_PN_4089012-800 United States · NAICS 336412 Aviation No set-aside
SUPPORT, TURBINE COM_End_Item_F100_NSN_2840012783281NZ_PN_4074639 NAICS 336412 Aviation No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity