Power Distribution and Illumination Systems, Electrical (PDISE)

Open Pre-Solicitation Posted

Solicitation number
W909MY27RA001
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

PSC
Not on record
Place of performance
United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Army, Army Contracting Command - Aberdeen Proving Ground (ACC-APG), Belvoir Division, is issuing a Request for Information to conduct market research on build-to-print manufacturing capabilities for the Power Distribution and Illumination Systems, Electrical (PDISE) family of systems, with responses due by November 6, 2026 at 4:00 PM Eastern Time. This is a sources-sought RFI under FAR Part 10 for market research purposes only and does not constitute a binding obligation or solicitation.

The procurement seeks qualified manufacturers under NAICS codes 335999 (Miscellaneous Electrical Equipment and Component Manufacturing) and 335313 (Switchgear and Switchboard Apparatus Manufacturing) to manufacture, assemble, and deliver four standardized, ruggedized, man-portable electrical distribution end-items: the M200 A/P Feeder System (3-Phase, 200 Amperes/Phase; NSN 6150-01-308-5672), M100 A/P Feeder System (3-Phase, 100 Amperes/Phase; NSN 6150-01-308-5671), M40 A/P Distribution System (3-Phase, 40 Amperes/Phase; NSN 6150-01-307-9446), and M46 Utility Assembly (NSN 6150-01-208-9751). Work shall follow Government-owned Technical Data Packages and military specifications including MIL-DTL-53126, ASME Y14.100, and MIL-STD-31000 with no redesign permitted.

Respondents must demonstrate build-to-print manufacturing capability, First Article Testing capacity, quality certifications (ISO 9001:2015 or AS9100D), heavy-gauge cable assembly and Class L connector competency, CARC painting and military packaging capability, supply chain resilience, production throughput and surge capacity, and relevant past performance from the past five years. Responses must include Rough Order of Magnitude pricing by quantity ranges (1–50, 51–100, and 101–200 units per configuration) and estimated timelines to first delivery (target 180 days for FAT unit fabrication and 360 days for FAT completion). Responses are limited to 20 pages in PDF or Word format and should be submitted to Contracting Officer Rosetta Wisdom-Russell (rosetta.wisdom-russell.civ@army.mil) and Contract Specialist Thao Trinh (thao.h.trinh.civ@army.mil). The Government will use responses to determine acquisition strategy, including whether a small business set-aside under FAR Part 19 is warranted.

Notice text

2 versions

Update #2 · Latest ·

SOURCES SOUGHT / REQUEST FOR INFORMATION (RFI)

Power Distribution and Illumination Systems, Electrical (PDISE)

Issuing Agency: Department of the Army, Army Contracting Command – Aberdeen Proving Ground (ACC-APG), Belvoir Division
Portfolio Acquisition Executive (PAE):  PAE Agile Sustainment & Ammunition (PAE ASA)
Project Manager (PM): PM Expeditionary Energy and Sustainment Systems (PM E2S2)
NAICS Code: 335999 (Miscellaneous Electrical Equipment and Component Manufacturing) and 335313 (Switchgear and Switchboard Apparatus Manufacturing)
PSC / FSC Code: 6150 (Miscellaneous Electric Power and Distribution Equipment)
Classification Code: 61 (Electric wire, and power and distribution equipment)
Notice Type: Sources Sought / Request for Information (Market Research under FAR Part 10)

1.0 DISCLAIMER & SPECIAL NOTICES

  1. This is a Request for Information (RFI) / Sources Sought Synopsis issued solely for information and planning purposes in accordance with FAR 15.201(e) and FAR Part 10. This notice does not constitute a Request for Proposal (RFP), Invitation for Bid (IFB), or an obligation on the part of the Government to acquire any products or services.
  2. Responses to this notice are not offers and cannot be accepted by the Government to form a binding contract. The Government will not pay for information submitted in response to this RFI, nor will it reimburse respondents for any costs incurred in preparing responses.
  3. Proprietary information, if any, should be minimized and MUST BE CLEARLY MARKED. All submissions become Government property and will not be returned.

2.0 PROGRAM BACKGROUND & SCOPE

The PM E2S2 has a potential requirement for the build-to-print manufacture, assembly, first article inspection, preproduction First Article testing, and delivery of the PDISE family of systems and associated components and packaging.

PDISE is a standardized, ruggedized, man-portable family of electrical feeder and distribution equipment that connect mobile power generation equipment and warfighter mission equipment in harsh tactical environments across Multi-Domain Operations (MDO).

The PDISE family consists of five Government-owned Technical Data Package (TDP) end-item Configuration Items (CIs) and their associated accessories. For this acquisition, only four of those end-items are required. The M60 A/P Distribution System is not anticipated to be included in this acquisition effort. The following systems will be procured:

  • M200 A/P Feeder System: 3-Phase, 200 Amperes/Phase (MIL-DTL-53126/1; Drawing 13229E6350) (NSN 6150-01-308-5672)
  • M100 A/P Feeder System: 3-Phase, 100 Amperes/Phase (MIL-DTL-53126/2; Drawing 13229E6351) (NSN 6150-01-308-5671)
  • M40 A/P Distribution System: 3-Phase, 40 Amperes/Phase (MIL-DTL-53126/3; Drawing 13229E6353) (NSN 6150-01-307-9446)
  • M46 Utility Assembly: Electrical Receptacles and Illumination Kit (MIL-DTL-53126/5; Drawing 13226E7046) (NSN 6150-01-208-9751)

Procurement Baseline: Build-to-print execution using existing Government TDPs, MIL-DTL-53126, and associated specification slash sheets. TDPs for the PDISE systems are available upon request.

3.0 PURPOSE OF THIS RFI

The Government seeks to determine:

  1. The availability of qualified large and small business sources under NAICS 335999 and 335313 capable of manufacturing, testing, and delivering the PDISE family of systems.
  2. Industry capacity and lead times for manufacturing and assembling heavy-duty electrical power-distribution equipment, including Class L connectors, ruggedized cables, military packaging and specialized circuit breakers.
  3. Vendor capability to conduct First Article Testing (FAT) and environmental testing per MIL-DTL-53126.
  4. Rough Order of Magnitude (ROM) unit cost for each item.
  5. The feasibility of small business set-asides (e.g., Total Small Business, 8(a), HUBZone, SDVOSB, or WOSB).

4.0 SPECIFIC INFORMATION REQUESTED (VENDOR QUESTIONNAIRE)

Interested vendors are requested to provide clear, detailed responses to the questions below. Generic corporate marketing brochures that do not directly address these technical and manufacturing questions will not be considered.

Section A: Corporate & Business Information

  1. Company Profile: Provide Company History (years in business), Name, Address, Website, CAGE Code, and Unique Entity Identifier (UEI) under SAM.gov.
  2. Business Size Standards: State your business size (number of employees) and socio-economic status under NAICS 335999 and 335313. Specify if your firm is:
  • Large Business
  • Small Business (SB)
  • Small Disadvantaged Business (SDB) / 8(a)
  • Service-Disabled Veteran-Owned Small Business (SDVOSB)
  • Historically Underutilized Business Zone (HUBZone)
  • Woman-Owned Small Business (WOSB / EDWOSB)
  1. Role & Teaming Intent: Do you intend to respond to a solicitation as a Prime Contractor, Joint Venture / Teaming Partner, or Subcontractor? If teaming or subcontracting, describe proposed workshare allocations and your strategy to satisfy the Limitations on Subcontracting (FAR 52.219-14).
  2. Workload: If your company is awarded the contract, will you be able to perform at least 50% (percent) of the work required in house?
  3. Relevant Corporate Experience and Past Performance: Provide up to three examples of recent, relevant efforts involving build-to-print manufacture, inspection, testing, and delivery of ruggedized electrical distribution equipment, cable assemblies, or comparable military hardware. For each example, identify the customer, period of performance, scope, quantities, contract value, and customer point of contact, if available. Limit each past-performance example to two pages.

Section B: Build-to-Print Manufacturing & Technical Capabilities

  1. TDP & Specification Conformance: PDISE requires fabrication to Government TDPs without redesign. Describe your facility’s experience manufacturing ruggedized power distribution centers, electrical enclosures, and high-power tactical cables to Government drawings (ASME Y14.100 / MIL-STD-31000).
  2. Tooling & Production Processes: Describe your capabilities for:
  • Heavy-gauge multi-conductor power cable assembly.
  • Assembly and wiring of circuit breaker inside distribution enclosures.
  • Integration of MIL-DTL-22992 (Class L) heavy-duty cylindrical connectors into enclosures and cabling.
  1. Facilities and Production Control: Describe the availability, size, and location of facilities; manufacturing equipment; production capacity; production-control processes; records-management practices; and reporting systems used to support cost, schedule, and performance requirements.
  2. Chemical Agent Resistant Coating (CARC): PDISE enclosures require pre-treatment and painting conforming to MIL-DTL-53072 and SAE-AMS-STD-595. Does your facility possess in-house CARC painting capabilities or do you rely on qualified third-party coating vendors?
  3. Packaging & Wood Packaging Material (WPM): Can your facility provide military preservation, marking, and crating conforming to Drawings 13230E7021/7020/7019?
  4. Manufacturing Readiness Level (MRL): What is your current assessed Manufacturing Readiness Level for this class of tactical electrical distribution hardware?
  5. In-Process and Final Inspection: Describe your processes for receiving inspection of components and materials, in-process inspection, final inspection, nonconformance control, and documentation of inspection of completed PDISE or similar end items, as applicable.

Section C: First Article Testing (FAT) & Environmental Qualification

  1. In-House vs. Subcontracted Testing: PDISE First Article Preproduction Inspection (FAT) requires 2 units per configuration tested within 180–360 Days After Contract Award (DACA). Identify whether your company possesses internal testing facilities or an established relationship with a DoD-certified laboratory to conduct First Article Testing in accordance with MIL-DTL-53126.
  2. Failure Escalation & Root Cause Analysis: Describe your engineering experience and/or procedures for performing root cause failure investigations and delivering Failed Item Analysis Reports (FIARs) and Test Incident Reports (TIRs) (DI-MISC-80711).

Section D: Quality Management & Configuration Control

  1. Quality Certifications: Is your quality management system certified to ISO 9001:2015, AS9100D, or an equivalent standard? Provide certificate numbers and registrar details.
  2. Configuration Management System (CMS): The contractor cannot deviate from the TDP without formal Government approval via Engineering Change Proposals (ECPs) or Requests for Variance (RFVs). Describe your formal configuration management process for tracking baseline changes in accordance with MIL-STD-3046 and MIL-HDBK-61.

Section E: Supply Chain Resilience, Surge Capacity & Lead Times

  1. Long-Lead Material Availability: Certain components (e.g., MIL-DTL-22992 Class L connectors, Mil-Spec lumber, specialized Mil-Spec circuit breakers and cables) historically experience extended lead times.
  • What are your current supplier’s lead times for these or similar critical long-lead items?
  • How does your company mitigate obsolescence and supply chain disruptions?
  1. Production Throughput & Surge Capacity:
  • What is your estimated monthly steady-state production throughput for PDISE systems (M200, M100, M40, M46)?
  • What is your maximum surge capacity (percentage increase above steady-state) that could be sustained under Defense Priorities and Allocations System (DPAS) rated orders (e.g., DO/DX ratings)?
  1. Army Arsenal Integration (Make-or-Buy): In accordance with the Army Make-or-Buy policy (DI-MGMT-82398), prime contractors must assess manufacturing end-item components within the US Army Arsenal System (e.g., Rock Island Arsenal, Watervliet Arsenal). Does your organization have prior experience partnering with or evaluating Army Arsenals for component production?

Section F: Past Performance & Rough Order of Magnitude (ROM)

  1. Relevant Experience: Provide up to three (3) examples of contracts completed or performed within the past five (5) years involving the manufacture, testing, or delivery of tactical electrical distribution, high-voltage vehicle power systems, or comparable DoD equipment. Include:
  • Contract Number & Customer / Agency
  • Total Dollar Value
  • Period of Performance
  • Specific Scope Executed (Prime vs. Subcontractor)
  1. Lead Time to First Delivery: Provide an estimated timeline (Months After Contract Award) for:
  • First Article Preproduction Unit fabrication (Target: ≤180 DACA)
  • First Article Testing completion and report submittal (Target: ≤360 DACA)
  • Production delivery commencement following FAT approval

Section G: ROM PRICING BY QUANTITY RANGE

  1. Provide quantity-based, per-unit Rough Order of Magnitude (ROM) pricing for each of the anticipated end items: M200 A/P Electrical Feeder System, M100 A/P Electrical Feeder System, M40 A/P Electrical Distribution System, and M46 Electrical Utility Assembly. Provide ROM pricing for the following quantity ranges: 1–50, 51–100, and 101–200 units. Identify significant pricing assumptions, long-lead material considerations, and any quantity-price breakpoints.

5.0 SUBMISSION INSTRUCTIONS & FORMAT

  • Submission Deadline: 11/06/2026 by 4:00 PM Eastern Time.
  • Page Limit: Responses shall not exceed twenty (20) pages (excluding title page, executive summary, and certs/licenses), 8.5" x 11" paper, font size 12 pt for the body text and 10-11 pt for any text in table or graphics, Times New Roman font, with a minimum of one (1) inch margins all around.
  • File Format: Deliver responses electronically in Adobe PDF or Microsoft Word format.
  • Submission Channel: Submissions must be transmitted via email to the Contract Specialist and Contracting Officer:
  • Contracting Officer: Rosetta Wisdom-Russell- rosetta.wisdom-russell.civ@army.mil
  • Contract Specialist:  Thao Trinh - thao.h.trinh.civ@army.mil
  • Subject Line: RFI Response: PDISE Manufacturing Capabilities – [Company Name]

6.0 GOVERNMENT SUMMARY & NEXT STEPS

The Government will evaluate market survey responses to determine the acquisition strategy, specifically whether a small business set-aside is warranted under FAR Part 19 or if full-and-open competition is required. Interested vendors are strongly encouraged to register in the System for Award Management (SAM) and ensure active status under NAICS 335999 and 335313.

Update #1 ·

SOURCES SOUGHT / REQUEST FOR INFORMATION (RFI)

Power Distribution and Illumination Systems, Electrical (PDISE)

Issuing Agency: Department of the Army, Army Contracting Command – Aberdeen Proving Ground (ACC-APG), Belvoir Division
Portfolio Acquisition Executive (PAE):  PAE Agile Sustainment & Ammunition (PAE ASA)
Project Manager (PM): PM Expeditionary Energy and Sustainment Systems (PM E2S2)
NAICS Code: 335999 (Miscellaneous Electrical Equipment and Component Manufacturing) and 335313 (Switchgear and Switchboard Apparatus Manufacturing)
PSC / FSC Code: 6150 (Miscellaneous Electric Power and Distribution Equipment)
Classification Code: 61 (Electric wire, and power and distribution equipment)
Notice Type: Sources Sought / Request for Information (Market Research under FAR Part 10)

1.0 DISCLAIMER & SPECIAL NOTICES

  1. This is a Request for Information (RFI) / Sources Sought Synopsis issued solely for information and planning purposes in accordance with FAR 15.201(e) and FAR Part 10. This notice does not constitute a Request for Proposal (RFP), Invitation for Bid (IFB), or an obligation on the part of the Government to acquire any products or services.
  2. Responses to this notice are not offers and cannot be accepted by the Government to form a binding contract. The Government will not pay for information submitted in response to this RFI, nor will it reimburse respondents for any costs incurred in preparing responses.
  3. Proprietary information, if any, should be minimized and MUST BE CLEARLY MARKED. All submissions become Government property and will not be returned.

2.0 PROGRAM BACKGROUND & SCOPE

The PM E2S2 has a potential requirement for the build-to-print manufacture, assembly, first article inspection, preproduction First Article testing, and delivery of the PDISE family of systems and associated components and packaging.

PDISE is a standardized, ruggedized, man-portable family of electrical feeder and distribution equipment that connect mobile power generation equipment and warfighter mission equipment in harsh tactical environments across Multi-Domain Operations (MDO).

The PDISE family consists of five Government-owned Technical Data Package (TDP) end-item Configuration Items (CIs) and their associated accessories. For this acquisition, only four of those end-items are required. The M60 A/P Distribution System is not anticipated to be included in this acquisition effort. The following systems will be procured:

  • M200 A/P Feeder System: 3-Phase, 200 Amperes/Phase (MIL-DTL-53126/1; Drawing 13229E6350) (NSN 6150-01-308-5672)
  • M100 A/P Feeder System: 3-Phase, 100 Amperes/Phase (MIL-DTL-53126/2; Drawing 13229E6351) (NSN 6150-01-308-5671)
  • M40 A/P Distribution System: 3-Phase, 40 Amperes/Phase (MIL-DTL-53126/3; Drawing 13229E6353) (NSN 6150-01-307-9446)
  • M46 Utility Assembly: Electrical Receptacles and Illumination Kit (MIL-DTL-53126/5; Drawing 13226E7046) (NSN 6150-01-208-9751)

Procurement Baseline: Build-to-print execution using existing Government TDPs, MIL-DTL-53126, and associated specification slash sheets. TDPs for the PDISE systems are available upon request.

3.0 PURPOSE OF THIS RFI

The Government seeks to determine:

  1. The availability of qualified large and small business sources under NAICS 335999 and 335313 capable of manufacturing, testing, and delivering the PDISE family of systems.
  2. Industry capacity and lead times for manufacturing and assembling heavy-duty electrical power-distribution equipment, including Class L connectors, ruggedized cables, military packaging and specialized circuit breakers.
  3. Vendor capability to conduct First Article Testing (FAT) and environmental testing per MIL-DTL-53126.
  4. Rough Order of Magnitude (ROM) unit cost for each item.
  5. The feasibility of small business set-asides (e.g., Total Small Business, 8(a), HUBZone, SDVOSB, or WOSB).

4.0 SPECIFIC INFORMATION REQUESTED (VENDOR QUESTIONNAIRE)

Interested vendors are requested to provide clear, detailed responses to the questions below. Generic corporate marketing brochures that do not directly address these technical and manufacturing questions will not be considered.

Section A: Corporate & Business Information

  1. Company Profile: Provide Company History (years in business), Name, Address, Website, CAGE Code, and Unique Entity Identifier (UEI) under SAM.gov.
  2. Business Size Standards: State your business size (number of employees) and socio-economic status under NAICS 335999 and 335313. Specify if your firm is:
  • Large Business
  • Small Business (SB)
  • Small Disadvantaged Business (SDB) / 8(a)
  • Service-Disabled Veteran-Owned Small Business (SDVOSB)
  • Historically Underutilized Business Zone (HUBZone)
  • Woman-Owned Small Business (WOSB / EDWOSB)
  1. Role & Teaming Intent: Do you intend to respond to a solicitation as a Prime Contractor, Joint Venture / Teaming Partner, or Subcontractor? If teaming or subcontracting, describe proposed workshare allocations and your strategy to satisfy the Limitations on Subcontracting (FAR 52.219-14).
  2. Workload: If your company is awarded the contract, will you be able to perform at least 50% (percent) of the work required in house?
  3. Relevant Corporate Experience and Past Performance: Provide up to three examples of recent, relevant efforts involving build-to-print manufacture, inspection, testing, and delivery of ruggedized electrical distribution equipment, cable assemblies, or comparable military hardware. For each example, identify the customer, period of performance, scope, quantities, contract value, and customer point of contact, if available. Limit each past-performance example to two pages.

Section B: Build-to-Print Manufacturing & Technical Capabilities

  1. TDP & Specification Conformance: PDISE requires fabrication to Government TDPs without redesign. Describe your facility’s experience manufacturing ruggedized power distribution centers, electrical enclosures, and high-power tactical cables to Government drawings (ASME Y14.100 / MIL-STD-31000).
  2. Tooling & Production Processes: Describe your capabilities for:
  • Heavy-gauge multi-conductor power cable assembly.
  • Assembly and wiring of circuit breaker inside distribution enclosures.
  • Integration of MIL-DTL-22992 (Class L) heavy-duty cylindrical connectors into enclosures and cabling.
  1. Facilities and Production Control: Describe the availability, size, and location of facilities; manufacturing equipment; production capacity; production-control processes; records-management practices; and reporting systems used to support cost, schedule, and performance requirements.
  2. Chemical Agent Resistant Coating (CARC): PDISE enclosures require pre-treatment and painting conforming to MIL-DTL-53072 and SAE-AMS-STD-595. Does your facility possess in-house CARC painting capabilities or do you rely on qualified third-party coating vendors?
  3. Packaging & Wood Packaging Material (WPM): Can your facility provide military preservation, marking, and crating conforming to Drawings 13230E7021/7020/7019?
  4. Manufacturing Readiness Level (MRL): What is your current assessed Manufacturing Readiness Level for this class of tactical electrical distribution hardware?
  5. In-Process and Final Inspection: Describe your processes for receiving inspection of components and materials, in-process inspection, final inspection, nonconformance control, and documentation of inspection of completed PDISE or similar end items, as applicable.

Section C: First Article Testing (FAT) & Environmental Qualification

  1. In-House vs. Subcontracted Testing: PDISE First Article Preproduction Inspection (FAT) requires 2 units per configuration tested within 180–360 Days After Contract Award (DACA). Identify whether your company possesses internal testing facilities or an established relationship with a DoD-certified laboratory to conduct First Article Testing in accordance with MIL-DTL-53126.
  2. Failure Escalation & Root Cause Analysis: Describe your engineering experience and/or procedures for performing root cause failure investigations and delivering Failed Item Analysis Reports (FIARs) and Test Incident Reports (TIRs) (DI-MISC-80711).

Section D: Quality Management & Configuration Control

  1. Quality Certifications: Is your quality management system certified to ISO 9001:2015, AS9100D, or an equivalent standard? Provide certificate numbers and registrar details.
  2. Configuration Management System (CMS): The contractor cannot deviate from the TDP without formal Government approval via Engineering Change Proposals (ECPs) or Requests for Variance (RFVs). Describe your formal configuration management process for tracking baseline changes in accordance with MIL-STD-3046 and MIL-HDBK-61.

Section E: Supply Chain Resilience, Surge Capacity & Lead Times

  1. Long-Lead Material Availability: Certain components (e.g., MIL-DTL-22992 Class L connectors, Mil-Spec lumber, specialized Mil-Spec circuit breakers and cables) historically experience extended lead times.
  • What are your current supplier’s lead times for these or similar critical long-lead items?
  • How does your company mitigate obsolescence and supply chain disruptions?
  1. Production Throughput & Surge Capacity:
  • What is your estimated monthly steady-state production throughput for PDISE systems (M200, M100, M40, M46)?
  • What is your maximum surge capacity (percentage increase above steady-state) that could be sustained under Defense Priorities and Allocations System (DPAS) rated orders (e.g., DO/DX ratings)?
  1. Army Arsenal Integration (Make-or-Buy): In accordance with the Army Make-or-Buy policy (DI-MGMT-82398), prime contractors must assess manufacturing end-item components within the US Army Arsenal System (e.g., Rock Island Arsenal, Watervliet Arsenal). Does your organization have prior experience partnering with or evaluating Army Arsenals for component production?

Section F: Past Performance & Rough Order of Magnitude (ROM)

  1. Relevant Experience: Provide up to three (3) examples of contracts completed or performed within the past five (5) years involving the manufacture, testing, or delivery of tactical electrical distribution, high-voltage vehicle power systems, or comparable DoD equipment. Include:
  • Contract Number & Customer / Agency
  • Total Dollar Value
  • Period of Performance
  • Specific Scope Executed (Prime vs. Subcontractor)
  1. Lead Time to First Delivery: Provide an estimated timeline (Months After Contract Award) for:
  • First Article Preproduction Unit fabrication (Target: ≤180 DACA)
  • First Article Testing completion and report submittal (Target: ≤360 DACA)
  • Production delivery commencement following FAT approval

Section G: ROM PRICING BY QUANTITY RANGE

  1. Provide quantity-based, per-unit Rough Order of Magnitude (ROM) pricing for each of the anticipated end items: M200 A/P Electrical Feeder System, M100 A/P Electrical Feeder System, M40 A/P Electrical Distribution System, and M46 Electrical Utility Assembly. Provide ROM pricing for the following quantity ranges: 1–50, 51–100, and 101–200 units. Identify significant pricing assumptions, long-lead material considerations, and any quantity-price breakpoints.

5.0 SUBMISSION INSTRUCTIONS & FORMAT

  • Submission Deadline: 10/22/2026 by 3:00 PM Eastern Time.
  • Page Limit: Responses shall not exceed twenty (20) pages (excluding title page, executive summary, and certs/licenses), 8.5" x 11" paper, font size 12 pt for the body text and 10-11 pt for any text in table or graphics, Times New Roman font, with a minimum of one (1) inch margins all around.
  • File Format: Deliver responses electronically in Adobe PDF or Microsoft Word format.
  • Submission Channel: Submissions must be transmitted via email to the Contract Specialist and Contracting Officer:
  • Contracting Officer: Rosetta Wisdom-Russell- rosetta.wisdom-russell.civ@army.mil
  • Contract Specialist:  Thao Trinh - thao.h.trinh.civ@army.mil
  • Subject Line: RFI Response: PDISE Manufacturing Capabilities – [Company Name]

6.0 GOVERNMENT SUMMARY & NEXT STEPS

The Government will evaluate market survey responses to determine the acquisition strategy, specifically whether a small business set-aside is warranted under FAR Part 19 or if full-and-open competition is required. Interested vendors are strongly encouraged to register in the System for Award Management (SAM) and ensure active status under NAICS 335999 and 335313.

Files

Similar open opportunities

Opportunity Agency Set-aside Responses due
Power distribution- NAICS 335931 Land and Maritime No set-aside
Power distribution NAICS 335312 Land and Maritime No set-aside
Microelectronics Sourcing Capability for Tobyhanna Army Depot (RFI 2) Pennsylvania 18466, United States · NAICS 334413 Department of the Army No set-aside
Draft Solicitation - Aberdeen Test Center Welding, Machining, Painting, and Fabrication Services Aberdeen Proving Ground, Maryland 21005, United States · NAICS 333992 ACC Aberdeen Proving Ground Total Small Business
Panel, power distributi NAICS 335313 Land and Maritime No set-aside