Post Frame Vehicle Storage Building
Award Notice Posted
- Solicitation number
- NIHOF2015078
- Agency
-
National Institutes of Health
Department of Health and Human Services
- Awarded
- to Schrock Construction Inc.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- HHSN292201500019C Federal contract award
- NAICS code
- 236210 Industrial Building Construction
- PSC
- Not on record
- Place of performance
- 903 S. 4th Street Hamilton, Montana 59840, United States
Notice details come from SAM.gov. Updated .
Notice text
Added: Aug 04, 2015 9:43 am
RML Post Frame Vehicle Storage Building
The Vehicle Storage Building, located at the National Institutes of Health's (N.I.H.) Rocky Mountain Laboratories (R.M.L.) in Hamilton, MT 59840, includes the construction of a new post-frame, insulated, metal-sided vehicle storage building and appurtenances. This Building will be a 36'x40' (1,440 ft2) with 14' high walls with an overhang covered area on one side. The building shall have reinforced concrete floor, two 12'x12' power operated overhead doors, two personnel doors, windows, natural gas unit heaters, LED lighting and a bathroom with slop sink. It also includes a 36'x30' reinforced concrete apron, door stoops, bollards to protect the doorways and underground utility work including electrical feeders in conduit, water service line, sewer service lines, and natural gas line.
The primary purpose of the building is to serve as a storage building for two large trucks that are part of the hazardous response unit. The magnitude of this construction project is estimated to be between $100,000 and $250,000.
Files
Show all 11
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity