Post Frame Vehicle Storage Building

Award Notice Posted

Solicitation number
NIHOF2015078
Agency
Awarded
to Schrock Construction Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
HHSN292201500019C Federal contract award
NAICS code
236210 Industrial Building Construction
PSC
Not on record
Place of performance
903 S. 4th Street Hamilton, Montana 59840, United States

Notice details come from SAM.gov. Updated .

Notice text

Added: Aug 04, 2015 9:43 am RML Post Frame Vehicle Storage Building
The Vehicle Storage Building, located at the National Institutes of Health's (N.I.H.) Rocky Mountain Laboratories (R.M.L.) in Hamilton, MT 59840, includes the construction of a new post-frame, insulated, metal-sided vehicle storage building and appurtenances. This Building will be a 36'x40' (1,440 ft2) with 14' high walls with an overhang covered area on one side. The building shall have reinforced concrete floor, two 12'x12' power operated overhead doors, two personnel doors, windows, natural gas unit heaters, LED lighting and a bathroom with slop sink. It also includes a 36'x30' reinforced concrete apron, door stoops, bollards to protect the doorways and underground utility work including electrical feeders in conduit, water service line, sewer service lines, and natural gas line.
The primary purpose of the building is to serve as a storage building for two large trucks that are part of the hazardous response unit. The magnitude of this construction project is estimated to be between $100,000 and $250,000.