Porcupine Ranger Station Wall Repair

Award Notice Posted

Solicitation number
1282D718B0002
Agency
Awarded
to Shane Lessard Construction Inc.
Set-aside
Total Small Business

Opportunity facts

Contract number
1282D718P0064 Federal contract award
NAICS code
238190 Other Foundation, Structure, and Building Exterior Contractors
PSC
Not on record
Place of performance
Lovell, Wyoming, United States

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

The USFS Region 2 AQM has issued the attached solicitation for maintenance work on the Porcupine Ranger Station.  The Government intends to use Simplified Acquistion Procedures to solicit and issue a Firmed Fixed price purchase order with an expected order of magnitude of less than $25,000. 
-
Pre-Bid site visit:  Our procurement goal is to have this action awarded by the 1st of June with work to follow in August.  This of course is prior to when the site is accesible due to snow and weather.  Therefore, there is no scheduled site visit.  If this solicitation results in fair and reasonable bids within our budget, we plan to proceed with an award.  If not we will reassess our options.

-
Period of performance: August 2018
-
SUMMARY OF WORK

1.1 LOCATION:


A. This project is located at the Porcupine Ranger Station, Building #3535 (Crew/Office) on FS 13. Site is approximately 50 miles east of Lovell, Wyoming on Hwy 14A.


1.2 DESCRIPTION OF WORK:


A. The work to be accomplished under this contract is to stabilize and realign the Eastern most "bowed out" wall of the dwelling. Such work can include:


1. Temporarily bracing of the bowed wall (east wall) with timbers or similar material.


2. Removal of casement windows if needed prior to moving wall.


3. Stabilize or jack up roof with cribbing prior to moving wall.


4. Pull the walls back in alignment using cables, plates, and come-a-longs from the inside of the building and hydraulic jacks from the exterior.


5. Once wall is realigned, securely fasten the wall to the roof system using (Simpson ties or similar product) and if needed use cable and turnbuckle between east and west load bearing walls in attic. This will be determined once the project begins.


6. Reinstall casement windows, repair or reconstruct trim-work, and seal any remaining gaps/hole on interior.


7. Repair or reconstruct trim-work, seal any holes or cracks, and use daubing/chinking on the exterior.


If you have questions or advice to give, please contact the POC.


 


 

Update #1 ·

The USFS Region 2 AQM will soon issue a full solicitation for maintenance work on the Porcupine Ranger Station.  The Government intends to use Simplified Acquistion Procedures to solicit and issue a Firmed Fixed price purchase order with an expected order of magnitude of less than $25,000.  If you are a small construction business in this area and would like to receive a bid package, either list yourself as an interested vendor and / or email your contact information to the POC.
-
Pre-Bid site:  Our procurement goal is to have this action awarded by the 1st of June with work to follow in August.  This of course is prior to when the site is accesible due to snow and weather.  Let me know in your response to this notice if there is sufficient information in the description and pictures to properly bid on this prior to a site-visit and inspection.
-
Expected dates of performance: August 2017

SUMMARY OF WORK


1.1 LOCATION:


A. This project is located at the Porcupine Ranger Station, Building #3535 (Crew/Office) on FS 13. Site is approximately 50 miles east of Lovell, Wyoming on Hwy 14A.


1.2 DESCRIPTION OF WORK:


A. The work to be accomplished under this contract is to stabilize and realign the Eastern most "bowed out" wall of the dwelling. Such work can include:


1. Temporarily bracing of the bowed wall (east wall) with timbers or similar material.


2. Removal of casement windows if needed prior to moving wall.


3. Stabilize or jack up roof with cribbing prior to moving wall.


4. Pull the walls back in alignment using cables, plates, and come-a-longs from the inside of the building and hydraulic jacks from the exterior.


5. Once wall is realigned, securely fasten the wall to the roof system using (Simpson ties or similar product) and if needed use cable and turnbuckle between east and west load bearing walls in attic. This will be determined once the project begins.


6. Reinstall casement windows, repair or reconstruct trim-work, and seal any remaining gaps/hole on interior.


7. Repair or reconstruct trim-work, seal any holes or cracks, and use daubing/chinking on the exterior.


If you have questions or advice to give, please contact the POC.


 


 

Files

File Type Posted
Attachment_1_-_Photos.pdf PDF
1282D718B0002_-_Porcupine_RS_Wall_Stabilization.pdf PDF
Attachment_3_-_WD_-_Big_Horn_County.pdf PDF
Attachment_2_-_SOW.pdf PDF
Attachment_1_-_Photos.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors