Attachment 2 - SOW
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_1_-_Photos.pdf | ||
| Attachment_3_-_WD_-_Big_Horn_County.pdf | ||
| 1282D718B0002_-_Porcupine_RS_Wall_Stabilization.pdf | ||
| Attachment_1_-_Photos.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUMMARY OF WORK
PART 1 - GENERAL
1.1 LOCATION:
A. This project is located at the Porcupine Ranger Station, Building #3535 (Crew/Office) on Forest Service Road 13. Site is approximately 50 miles east from Lovell, Wyoming on Hwy 14A.
1.2 DESCRIPTION OF WORK:
A. The work to be accomplished under this contract is to stabilize and realign the Eastern most “bowed out” wall of the dwelling. Such work can include:
1. Temporarily bracing of the bowed wall (east wall) with timbers or similar material.
2. Removal of casement windows if needed prior to moving wall.
3. Stabilize or jack up roof with cribbing prior to moving wall.
4. Pull the walls back in alignment using cables, plates, and come-a-longs from the inside of the building and hydraulic jacks from the exterior.
5. Once wall is realigned, securely fasten the wall to the roof system using
(Simpson ties or similar product) and if needed use cable and turnbuckle between east and west load bearing walls in attic. This will be determined once the project begins.
6. Reinstall casement windows, repair or reconstruct trim-work, and seal any remaining gaps/hole on interior.
7. Repair or reconstruct trim-work, seal any holes or cracks, and use daubing/chinking on the exterior.
Note: Any finial stabilization must be concealed in attic.
1.3 USE OF PREMISES:
A. General Contractor shall have use of the water system at the site for non-potable and potable purpose. Power is available at the site for the Contractors use. There is an outhouse on site for the Contractors use. No additional fees will be made for the use of the utilities.
B. Staging and storage of materials is permissible at the project site.
C. Contractor shall provide adequate signing and barricades to take necessary safety measures to protect the public and Government tenets and employees of the area during all construction operations. Contractor shall minimize disturbance of all undisturbed areas.
1.4 CAMPING:
A. With the approval by the Medicine Wheel Ranger District, Porcupine Ranger Station may be used by the Contractor to set up camp at no additional fee.
1.5 CLEAN UP:
A. The contractor shall keep the work site free from accumulation of waste materials and rubbish resulting from the work. Contractor shall take care of cleaning up all paint chips removed from the existing building.
B. The Contractor shall clean up construction debris at the completion of each day’s work. Before final acceptance of the project by the Government, the Contractor shall remove from the site all waste materials and rubbish resulting from this work. Any generated waste will be property of the Contractor.
END OF SECTION
| 1. |
| 1.1 LOCATION: |
| A. This project is located at the Porcupine Ranger Station, Building #3535 (Crew/Office) on Forest Service Road 13. Site is approximately 50 miles east from Lovell, Wyoming on Hwy 14A. |
| 1.2 DESCRIPTION OF WORK: |
| A. The work to be accomplished under this contract is to stabilize and realign the Eastern most “bowed out” wall of the dwelling. Such work can include: |
| 1. Temporarily bracing of the bowed wall (east wall) with timbers or similar material. |
| 2. Removal of casement windows if needed prior to moving wall. |
| 3. Stabilize or jack up roof with cribbing prior to moving wall. |
| 4. Pull the walls back in alignment using cables, plates, and come-a-longs from the inside of the building and hydraulic jacks from the exterior. |
| 5. Once wall is realigned, securely fasten the wall to the roof system using (Simpson ties or similar product) and if needed use cable and turnbuckle between east and west load bearing walls in attic. This will be determined once the project begins. |
| 6. Reinstall casement windows, repair or reconstruct trim-work, and seal any remaining gaps/hole on interior. |
| 7. Repair or reconstruct trim-work, seal any holes or cracks, and use daubing/chinking on the exterior. |
| Note: Any finial stabilization must be concealed in attic. |
| 1.3 Use of premises: |
| A. General Contractor shall have use of the water system at the site for non-potable and potable purpose. Power is available at the site for the Contractors use. There is an outhouse on site for the Contractors use. No additional fees will be made ... |
| B. Staging and storage of materials is permissible at the project site. |
| C. Contractor shall provide adequate signing and barricades to take necessary safety measures to protect the public and Government tenets and employees of the area during all construction operations. Contractor shall minimize disturbance of all undis... |
| 1.4 Camping: |
| A. With the approval by the Medicine Wheel Ranger District, Porcupine Ranger Station may be used by the Contractor to set up camp at no additional fee. |
| 1.5 Clean up: |
| A. The contractor shall keep the work site free from accumulation of waste materials and rubbish resulting from the work. Contractor shall take care of cleaning up all paint chips removed from the existing building. |
| B. The Contractor shall clean up construction debris at the completion of each day’s work. Before final acceptance of the project by the Government, the Contractor shall remove from the site all waste materials and rubbish resulting from this work. ... |