CORRECTION to Phase 1 - Prequalification Notice for Lease Fit-Out (LFO) for the Relocation of the U. S. Consulate (CG) in Marseille, France

Closed Solicitation Posted

Solicitation number
19AQMM24R0028
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
France

Notice details come from SAM.gov. Updated .

About this opportunity

Here is a two paragraph summary of the key details in the Solicitation notice:

The U.S. Department of State (DOS), Office of the Procurement Executive (OPE), on behalf of the Bureau of Overseas Buildings Operations (OBO), is seeking design-build construction services for a Lease Fit-Out (LFO) project to support the relocation of the U.S. Consulate in Marseille, France. The project scope includes full demolition of the existing interior, exterior and structural improvements, a full new consulate program, physical security enhancements, mechanical/plumbing, electrical, telecom, and technical security system upgrades. Prospective offerors must demonstrate prior experience with similar construction work valued at $9.75 million or more, and obtain a SECRET-level security clearance. Proposals for the Phase 1 prequalification are due by May 14, 2024, and only prequalified offerors will be eligible to participate in the full Request for Proposal in Phase 2.

This opportunity is available for full and open competition, with no set-aside designation. The NAICS code is likely 236220 (Commercial and Institutional Building Construction), and the PSC code is likely Z2LB (Architect and Engineering - Facility Construction). The estimated construction cost for this design-build contract is between $15-$25 million, with the place of performance in Marseille, France. There are no named incumbent contractors provided in the notice.

Notice text

2 versions

Update #2 · Latest ·

CORRECTION to PHASE 1 - Notice of Solicitation of Submissions for Contractor Pre-Qualification

This is to replace the 402 A1 2024 of the Omnibus Certification Pamphlet with the 402 A2 2024 version in the attachments. 

The U.S. Department of State (DOS), Office of the Procurement Executive (OPE) on behalf of the Bureau of Overseas Buildings Operations (OBO), has a requirement for Design-Build Construction Services for a Lease Fit-Out (LFO) of two floors and portions of the garage of an existing commercial building to support the Relocation of the U.S. Consulate (CG) in Marseille, France, solicitation number 19AQMM24R0028.

This project is available for full and open competition.

Project Description (Secret Facility and Personnel Security Clearance Required)

The property is located in a commercial section of the City of Marseille.  It is bounded on four sides by other commercial/office/retail facilities. To the north, there are existing commercial office space multi-story buildings and a large open space/plaza between the facility and the next. To the south, there are existing commercial/office space multi-story buildings with an intervening alley. There is also a large open space/plaza at the southwest corner across the alley behind another building. To the east, there are existing commercial, office and residential multi-story buildings with an intervening light rail/trolley in the middle of the adjacent street.  To the west, there is a multi-story office and retail mall complex called Les Docks Village. The majority of this complex is four to five stories in height.

Project Scope: 

The Lease Fit-Out (LFO) project scope includes the design/build construction of the following:

  • EXISTING CONDITIONS
    • Full demolition of all existing interior finishes, fixtures, cabling, ducts and equipment – salvage all Fan Coil Units (FCUs), lights, and other materials for owner turnover.
  • EXTERIOR AND STRUCTURAL IMPROVEMENTS
  • Shatter-Resistant Window Film (SRWF) + Framing at all exterior wall areas.
  • Replacing isolated glass transoms with OSA louvers.
  • New roof-mounted mechanical equipment.
  • New roof-mounted antennas.
  • New Architectural Barriers Act (ABA) compliant ramp to North Terrace.
  • New FE door to mechanical wells.
  • Carbon Fiber slab and beam reinforcing at new hardline walls.
  • INTERIOR IMPROVEMENTS
  • Full new consulate program including public and staff areas as follows:
  • Screening area and main lobby
  • American Citizen Services consular waiting and service area
  • Consular section
  • General Work Area (GWA) suite
  • Storage and workshops
  • Break areas and office support
  • IRM spaces
  • Conference rooms
  • Naval Criminal Investigative Service (NCIS) suite
  • Executive suite
  • Mail screening facility
  • Enclosed parking
  • All new walls, doors and finishes as per Space Requirements Program-Module (SRP-M) finish level and material categories.
  • PHYSICAL SECURITY
  • Forced Entry (FE) perimeter at all core-to-lease area conditions.
  • New Safe Area and requisite construction.
  • New gates/fences at public stairwells.
  • MECHANICAL AND PLUMBING
  • Interface with existing building system chilled water, hot water, and outside air.
  • Fully reconfigure existing FCUs for new layout.
  • New equipment to provide dedicated outside air, redundancy, or supplemental cooling where required.
  • New dedicated mechanical system
  • New exhaust ducting to required program areas.
  • Replacement Building Automation Systems (BAS) to meet OBO Design Standards.
  • New, limited, plumbing at break rooms, lactation room, and janitor closets connected to existing plumbing DWV stacks.
  • New mechanical and plumbing for Mail Screening Facility (MSF) fit out location.
  • New point-of-use water heaters at new sinks.
  • ELECTRICAL
  • New feeder to lease area from basement demarc.
  • New branch circuitry and power distribution throughout.
  • New lighting throughout.
  • New dedicated electrical service/equipment.
  • New electrical to Mail Screening Facility (MSF) fit out location.
  • TELECOM AND AUDIO-VISUAL
  • New dedicated telecom service from building demarc to new designated Telecom Service Entrance Facility (TSEF) on 7th floor.
  • New telecom distribution throughout leased area.
  • New Audio-Visual (AV) equipment and distribution throughout to designated spaces.
  • TECHNICAL SECURITY SYSTEM (TSS)
  • New cameras at parking garage, lobbies, leased area, and roof.
  • New access controls and other required systems.
  • FIRE ALARM
  • Upgrade or replace fire alarm devices and control panel to meet National Fire Protection Association (NFPA) 72 for a non-sprinklered building and to interface with existing building system for notification.

This is a Design-Build contract.  The awarded contractor shall be provided with bridging documents that the contractor shall develop to 100% final design. 

This project is available for full and open competition.

            Approximate construction cost:  $15-$25 million

NOTE: To demonstrate performance of similar construction work for Omnibus Diplomatic Security and Antiterrorism Act of 1986 purposes, the offeror needs to provide information demonstrating that it has successfully completed in the United States or at a U.S. diplomatic or consular mission a construction contract or subcontract involving work of the same general type and complexity as the solicited project and having a contract or subcontract value of at least $       9,750,000.00.  See the attached. 

Update #1 ·

PHASE 1 - Notice of Solicitation of Submissions for Contractor Pre-Qualification

The U.S. Department of State (DOS), Office of the Procurement Executive (OPE) on behalf of the Bureau of Overseas Buildings Operations (OBO), has a requirement for Design-Build Construction Services for a Lease Fit-Out (LFO) of two floors and portions of the garage of an existing commercial building to support the Relocation of the U.S. Consulate (CG) in Marseille, France, solicitation number 19AQMM24R0028.

This project is available for full and open competition.

Project Description (Secret Facility and Personnel Security Clearance Required)

The property is located in a commercial section of the City of Marseille.  It is bounded on four sides by other commercial/office/retail facilities. To the north, there are existing commercial office space multi-story buildings and a large open space/plaza between the facility and the next. To the south, there are existing commercial/office space multi-story buildings with an intervening alley. There is also a large open space/plaza at the southwest corner across the alley behind another building. To the east, there are existing commercial, office and residential multi-story buildings with an intervening light rail/trolley in the middle of the adjacent street.  To the west, there is a multi-story office and retail mall complex called Les Docks Village. The majority of this complex is four to five stories in height.

Project Scope: 

The Lease Fit-Out (LFO) project scope includes the design/build construction of the following:

  • EXISTING CONDITIONS
    • Full demolition of all existing interior finishes, fixtures, cabling, ducts and equipment – salvage all Fan Coil Units (FCUs), lights, and other materials for owner turnover.
  • EXTERIOR AND STRUCTURAL IMPROVEMENTS
  • Shatter-Resistant Window Film (SRWF) + Framing at all exterior wall areas.
  • Replacing isolated glass transoms with OSA louvers.
  • New roof-mounted mechanical equipment.
  • New roof-mounted antennas.
  • New Architectural Barriers Act (ABA) compliant ramp to North Terrace.
  • New FE door to mechanical wells.
  • Carbon Fiber slab and beam reinforcing at new hardline walls.
  • INTERIOR IMPROVEMENTS
  • Full new consulate program including public and staff areas as follows:
  • Screening area and main lobby
  • American Citizen Services consular waiting and service area
  • Consular section
  • General Work Area (GWA) suite
  • Storage and workshops
  • Break areas and office support
  • IRM spaces
  • Conference rooms
  • Naval Criminal Investigative Service (NCIS) suite
  • Executive suite
  • Mail screening facility
  • Enclosed parking
  • All new walls, doors and finishes as per Space Requirements Program-Module (SRP-M) finish level and material categories.
  • PHYSICAL SECURITY
  • Forced Entry (FE) perimeter at all core-to-lease area conditions.
  • New Safe Area and requisite construction.
  • New gates/fences at public stairwells.
  • MECHANICAL AND PLUMBING
  • Interface with existing building system chilled water, hot water, and outside air.
  • Fully reconfigure existing FCUs for new layout.
  • New equipment to provide dedicated outside air, redundancy, or supplemental cooling where required.
  • New dedicated mechanical system
  • New exhaust ducting to required program areas.
  • Replacement Building Automation Systems (BAS) to meet OBO Design Standards.
  • New, limited, plumbing at break rooms, lactation room, and janitor closets connected to existing plumbing DWV stacks.
  • New mechanical and plumbing for Mail Screening Facility (MSF) fit out location.
  • New point-of-use water heaters at new sinks.
  • ELECTRICAL
  • New feeder to lease area from basement demarc.
  • New branch circuitry and power distribution throughout.
  • New lighting throughout.
  • New dedicated electrical service/equipment.
  • New electrical to Mail Screening Facility (MSF) fit out location.
  • TELECOM AND AUDIO-VISUAL
  • New dedicated telecom service from building demarc to new designated Telecom Service Entrance Facility (TSEF) on 7th floor.
  • New telecom distribution throughout leased area.
  • New Audio-Visual (AV) equipment and distribution throughout to designated spaces.
  • TECHNICAL SECURITY SYSTEM (TSS)
  • New cameras at parking garage, lobbies, leased area, and roof.
  • New access controls and other required systems.
  • FIRE ALARM
  • Upgrade or replace fire alarm devices and control panel to meet National Fire Protection Association (NFPA) 72 for a non-sprinklered building and to interface with existing building system for notification.

This is a Design-Build contract.  The awarded contractor shall be provided with bridging documents that the contractor shall develop to 100% final design. 

This project is available for full and open competition.

            Approximate construction cost:  $15-$25 million

NOTE: To demonstrate performance of similar construction work for Omnibus Diplomatic Security and Antiterrorism Act of 1986 purposes, the offeror needs to provide information demonstrating that it has successfully completed in the United States or at a U.S. diplomatic or consular mission a construction contract or subcontract involving work of the same general type and complexity as the solicited project and having a contract or subcontract value of at least $       9,750,000.00.  See the attached. 

Files

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
Lease Fit-Out (LFO) of the U. S. Consulate (CG) in Marseille, France Pre-Solicitation
Lease Fit-Out (LFO) for Relocation of CG Marseille, France Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Painting and Maintenance Services in Apartments for the U. S. Mission in Paris, France Paris Paris France · NAICS 238390 US Embassy Paris No set-aside
Temporary Support Services (Carpenter) Paris 75008 France · NAICS 561330 US Embassy Paris No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors