Personnel Recovery Hanger
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- W912HN19R3008
- Agency
-
ENDIST Savannah
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- PSC
- Not on record
- Place of performance
- Moody Air Force Base, Georgia, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This pre-solicitation notice seeks to provide a combined hangar and aircraft parts store facility, including construction of reinforced concrete foundations, structural steel framing, metal roofing, fire detection and protection systems, utilities infrastructure, landscaping, roadways, taxiways, lighting, and communications support. The Department of the Army Corps of Engineers Engineering District Savannah will evaluate proposals. Respondents must demonstrate experience on similar projects, provide organizational information, and respond to questions regarding the potential use of a Project Labor Agreement on this opportunity. Proposals are due by August 9, 2019.
There is no set-aside designated for this procurement. Respondents must indicate if they meet any socio-economic business categories. The solicitation involves construction services under NAICS 237310 and PSC C – Construction of Structures and Facilities. The facility will include demolition of an existing 2,140 square meter parts store. Respondents will be evaluated based on their capability statements and responses to the 10 questions provided regarding factors such as local labor conditions, scheduling requirements, potential cost savings or risks from a PLA, and whether a PLA could increase costs for this specific project.
Notice text
Provide a combined hangar/HMU facility and aircraft parts store. Work includes reinforced concrete foundation and floor slab, structural steel frame, standing seam metal roof, fire detection/protection, including high expansion foam system in the hangar bay area, utilities, landscaping, roads/parking, hangar apron-airfield access pavements, taxiway pavment, lighting and markings, communications support, and all other support as necessary. Work will include extension of installation roadways to accommodate new traffic pattern required around new apron-airfield access pavements, to include vehicle pavements, curb and gutter, marking, and lighting. Demolish existing parts store for 2,140 SM. Facilities will be designed as permanent construction in accordance with DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements, and UFC 1-200-02, High Performance and Sustainable Building Requirements. This project will comply with DoD antiterrorism/force protection requirements per UFC 4-010-01.
This sources sought REQUIRES respondents to include the following:
1. A capability statement which includes projects you have worked on that are similiar to the described project work above. Include scope, project value, percentage of work you performed, and whether you were the prime.
2. Include CAGE code, DUNS number and any socio-economic business categories you fall under.
3. Include responses to the below PLA Assessment Determination USACE Question Set (questions 1-10 below)
(FAR 22.503 Policy regarding Project Labor Agreement (PLA):)
PLA Assessment Determination: UDG 5122.503-2 (5)(a): USACE Standard Question Set:
1) Do you have knowledge that a PLA has been used in the local area on projects of this kind? If so, please provide supporting documentation.
2) Are you aware of skilled labor shortages in the area for those crafts that will be needed to complete the referenced project? If so, please elaborate and provide supporting documentation where possible.
3) Are you aware of time sensitive issues/scheduling requirements that would affect the rate at which the referenced project should be completed? If so, please elaborate and provide supporting documentation where possible.
4) Identify specific reasons why or how you believe a PLA would advance the Federal Governments interest in achieving economy and efficiency in federal procurement.
5) Identify specific reasons why you do not believe a PLA would advance the Federal Governments interest in achieving economy and efficiency in federal procurement.
6) Identify any additional information you believe should be considered on the use of a PLA on the referenced project.
7) Identify any additional information you believe should be considered on the non-use of a PLA on the referenced project.
8) Could a PLA contribute to cost savings in any of the following ways:
• Harmonization of shifts and holidays between the trades to cut labor costs?
• Minimizing disruptions that may arise due expiration of CBA?
• Availability of trained, registered apprentices, efficient for highly skilled workforce?
• Allowing for changes in apprentice to journeyman ratio.
• Serving as a management tool that ensures highly skilled workers from multiple trades are coordinated in the most efficient way.
9) Could a PLA minimize risk and contribute to greater efficiency in any of the following ways:
• Mechanisms to avoid delays
• Complying with labor standards, safety rules and EEO and OFCCP laws.
• Ensuring a steady supply of skilled labor in markets with low supply or high competition for workers.
10) Are there ways in which a PLA might increase costs on this particular project?
.
Notice history
| Notice | Type | Posted |
|---|---|---|
| Personnel Recovery Hanger HMU, Moody AFB GA | Award Notice | |
| Moody AFB Personnel Recovery Hanger - W912HN20B3002 | Solicitation | |
| Moody AFB Personnel Recovery Hanger - W912HN20B3002 | Pre-Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity