Peavine Aquatic Construction on the Plumas National Forest

Award Notice Posted

Solicitation number
AG-9JGP-S-17-0009
Agency
Awarded
to Wilburn Construction, Inc.
Set-aside
Total Small Business

Opportunity facts

Contract number
AG-9JGP-C-17-0081 Federal contract award
NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Not on record
Place of performance
The project is located on the Feather River Ranger District. The site is located 5.7 miles from the Oroville-Quincy highway in T24N, R6E, and Section 21 of the Brush Creek Quadrangle. If traveling from Oroville, travel for 28.4 miles on the highway and turn left onto road 22N33. From road 22N33, travel until the end of the roadway and make a sharp right onto road 22N39. Travel along road 22N39 and turn onto road 22N01Y. Continue onto road 22N12X. The site is located where road 22N12X and Peavine Creek intersect. Oroville, California 96965, United States

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

There will be a site vist on 26 Apr 2017 at 10:00am local time located at the Brush Creek Work Center, 12815 Oro-Quincy Hwy, Berry Creek, CA 95016.

All questions should be in writing directed to the Contracting Officer.  

Update #1 ·

This contract is for the replacement of an existing pipe arch culvert which currently impedes the passage of aquatic organisms. The existing culvert will need to be removed and replaced with a new open bottom arch culvert measuring 20'-0 x 6'-4" x 60'-0". The new culvert will be composed of a multi-plate galvanized steel arch and supported by 7' cast-in-place concrete abutments. Riprap will also need to be placed at the inlet and outlet of the culvert in order to provide slope protection.

Stream simulation and road construction will also be a part of the project. A low flow channel will need to be constructed in the streambed, with a layer of stream simulation rock placed and compacted to simulate a natural streambed throughout the length of the arch. Rock weirs will need to be constructed within the arch as well. A portion of the roadway will also need to be expanded and overlaid with crushed aggregate.

Files

File Type Posted
DB_Wage_Dertemination.pdf PDF
Fire_Plan.pdf PDF
Peavine_Plans.pdf PDF
Specifications.pdf PDF
AG-9JGP-S-17-0009_Peavine_Aquatic.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors