Peavine_Plans.pdf

PDF 2 MB Posted

Attached to
Peavine Aquatic Construction on the Plumas National Forest
Solicitation number
AG-9JGP-S-17-0009
Issued by

About this file

Drawings/Plans

View the file

Other files

File Type Posted
DB_Wage_Dertemination.pdf PDF
Fire_Plan.pdf PDF
Specifications.pdf PDF
AG-9JGP-S-17-0009_Peavine_Aquatic.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Get Up and Get Cr ee k

Sly C ree k

Ram Creek

Little Ram Creek

Peavine Creek

32 33

282930

212019

0 0.15 0.3 0.45 0.6 Miles

LOCATION MAP

NOT TO SCALE

PEAVINE AQUATIC ORGANISM PROJECT

FEATHER RIVER RANGER DISTRICT

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

PLUMAS NATIONAL FOREST

OROVILLE, CALIFORNIA

DESIGNED:

DRAWN:

CHECKED:

DATE:

DATE:

DATE:

DATE REVISION DRAWING NAME

SHEET

BY

FORES T SERVICE

D

E PARTM ENT OF AGRICUL TU

RE

T24N R6E

PEAVINE.DWG

EXISTING ROADS

F.S. ROAD NUMBER

COUNTY ROAD NUMBER

HIGHWAY ROAD NUMBER

PLUMAS NATIONAL FOREST

OTHER OWNERSHIP

CULVERT LOCATION

CREEKS

LEGEND

24N10XA

+404

PEAVINE AOP

22N01Y

22N39

22N33

22N39

$+496 65A

22N33

22N49

22N54

22N34

22N27X

22N96X

$+119

22N12X

22N90

")162

21N37X

22N08

22N01Y

5.7 Miles to Site

28.

4 Miles to

Orovill e j j

C. PEREZ

C. PEREZ

A. PARKER

11/24/15 11/24/15 11/24/15

ELEVATIO

N

STATION

10000

10005

10000

10005

0+00 0+10 0+20 0+30 0+40 0+50 0+60 0+70 0+80 0+90 1+00 1+10 1+20 1+30 1+40

1.5:1 1.5:1

14 FT

C

P

R

P

Feet

1:120

PLAN

PROFILE

STREAM

FLOW

FLOW DIRECTION

EXISTING

GROUND

FILL SLOPE FILL SLOPE

EDGE OF

BANKFULL

EDGE OF

STREAMBED

KEY ROCK

FEATURES

WEIR ROCKS

PLUNGE

POOL FILL

SEE SHEET 7 FOR NEW CONTOURS

STATION

ALIGNMENT - ROADWAY PROFILE

10000

10001

10002

10003

10004

10000

10001

10002

10003

10004

0+10 0+20 0+30 0+40 0+50 0+60 0+70 0+80 0+90 1+00 1+10

Feet

2.5

Match proposed roadway to existing roadway

Edge of existing roadway (Roadway width varies from 9' to 14' along length of road)

PROFILE

PLAN

Proposed roadway width = 14'

Landing Area

Edge of proposed roadway

Be gi n 6"

C om pa ct ed A gg re ga te

Ba se

P la ce m en t o n Ro ad w ay

FILL SLOPE

ST

A.

+5

SEE SHEET 7 FOR NEW CONTOURS

STATION

ALIGNMENT - ROADWAY PROFILE

10000

10001

10002

10003

10004

10005

10000

10001

10002

10003

10004

10005

1+15 1+20 1+30 1+40 1+50 1+60 1+70 1+80 1+90 2+00 2+10 2+20 2+30

Feet

2.5

Match proposed roadway to existing roadway, Beginning at Station 1+65

Edge of existing roadway

PROFILE

PLAN

Proposed roadway width = 14'

Landing Area

Edge of proposed roadway

FILL SLOPE

FILL SLOPE

End 6" Compacted Aggregate

Base Placement on Roadway

STA. 2+25

SEE SHEET 7 FOR NEW CONTOURS

1-PeavineAOP_Signed
2-Peavine Location Map
3-PeavineAOP_Revised 11-04-2016
4-PeavineAOP_Revised 11-04-2016
5-PeavineAOP_Revised 11-04-2016
6-PeavineAOP_Revised 11-04-2016
7&8-PeavineAOP_R-1669 Combined
9-PeavineAOP_Revised 10-25-2016

File details come from the government source that posted it. Updated .