PCB contaminated equipment assessment for SAN carl
Open Solicitation Posted
- Solicitation number
- 140A1127Q0091
- Agency
-
Western Region
Bureau of Indian Affairs and Indian Education, Department of the Interior
- Responses due
- Set-aside
- Indian Small Business Economic Enterprise
Opportunity facts
- NAICS code
- 541620 Environmental Consulting Services
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Interior Bureau of Indian Affairs Western Region seeks PCB-contaminated equipment assessment services for the San Carlos Irrigation Project, with quotes due December 8, 2026. The procurement is set aside for Indian Small Business Economic Enterprises, and offerors must certify Indian Economic Enterprise status on the IEE Representation Form at offer submission, at award, and throughout the contract term.
Place of performance is two Pinal County, Arizona sites: the SCIP Maintenance Yard in Coolidge and the Saguaro Substation near Kearny. The contemplated award is a firm-fixed-price purchase order with a 90-day performance period from award. The NAICS code is 541620, Environmental Consulting Services, with a small business size standard of $19 million.
Scope includes PCB oil content testing of 100 unlabeled transformers at the Maintenance Yard and three circa-1965, 667 KVA transformers at the Saguaro Substation. It also includes indoor air sampling at three locations within the Maintenance Yard laboratory building for petroleum hydrocarbons, volatile organic compounds, semi-volatile organic compounds, and PCBs, and 55 PCB wipe tests of the approximately 45' x 12' laboratory building interior and contents. Equipment is PCB-contaminated when its oil exceeds 50 ppm, and all testing uses EPA-approved analytical methodology.
The technical qualification requires at least three years of experience completing these same three tasks at two or more facilities each. The contractor provides all equipment, removes it, and disposes of waste, including PCB-contaminated waste, in compliance with OSHA, USEPA, ADEQ, and ADOT requirements. An Arc Flash Hazard Analysis must be addressed at the actively energized Saguaro Substation but not at the Maintenance Yard. Laboratory building work requires OSHA Level C PPE with air-purifying respirators fitted with organic vapor and P100 cartridges. SCIP supplies containment bags and bins, electrical safety information, and escort services.
The contractor delivers a Project Work Plan within 21 calendar days of notice to proceed, incorporating a Health and Safety Plan and a Quality Assurance Project Plan. Two separate testing reports, one for the Maintenance Yard and one for the Saguaro Substation, are due in draft and final forms, each with a 14-calendar-day review period. Final invoices are due through the Invoice Processing Platform within 60 calendar days of product acceptance and completion of services.
Evaluation uses Lowest Priced-Technically Acceptable methodology, with award to the responsible offeror whose quote is most advantageous to the government considering price and technical factors. Quote packages require company information, firm-fixed-price pricing addressing all Statement of Work elements, two one-page project descriptions, resumes and certifications of field staff, the completed IEE Representation Form, and DIAR 1452.280-4 representation. Questions are due November 30, 2026 at 5:00 PM Mountain Time to Contracting Officer Melanie Schiaveto at melanie.schiaveto@bia.gov.
Notice text
PCB CONTAMINATED EQUIPMENT ASSESSMENT FOR SAN CARLOS IRRIGATION PROJECT
Files
| File | Type | Posted |
|---|---|---|
| Sol_140A1127Q0091.pdf | ||
| Bid_Sheet_-_PCB_Assessment_SCIP.xlsx | XLSX spreadsheet | |
| IA_-_IEE_Representation_Form.pdf | ||
| SCIP_PCB_Assessment_SOW_10_14_2026_rev_11_4_2026.pdf |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| BIA Electrical Utility O&M Services | Western Region | No set-aside | |
| AK-arctic NWR- asbestos, lead base paint | — | Total Small Business | |
| FAIR Route 3 - 96-inch CMP Replacement Project | Central Office | Indian Small Business Economic Enterprise | |
| GC transformer fluid testing | — | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity