This is a Statement of Work (SOW) for PCB-contaminated equipment assessment services at two locations in Pinal County, Arizona, managed by the Bureau of Indian Affairs' San Carlos Irrigation Project (SCIP).
The contractor must complete PCB oil content testing for 100 unlabeled transformers at the SCIP Maintenance Yard in Coolidge, Arizona, and three circa-1965, 667 KVA transformers at the Saguaro Substation near Kearny, Arizona. Additional requirements include indoor air analysis at three locations within the laboratory building at the Maintenance Yard (testing for petroleum hydrocarbons, volatile organic compounds, semi-volatile organic compounds, and PCBs) and PCB wipe testing of the approximately 45' x 12' laboratory building interior and contents, totaling 55 wipe tests across specified surfaces. All testing must utilize EPA-approved analytical methodologies, with PCB-contaminated equipment defined as containing oil with concentrations exceeding 50 ppm. The contractor must prepare a Project Work Plan within 21 calendar days of notice to proceed, incorporating site descriptions, project objectives, logistics, task procedures, a Health and Safety Plan, and a Quality Assurance Project Plan. Two separate testing reports—one for the Maintenance Yard and one for the Saguaro Substation—must be submitted in draft and final forms with 14-calendar day review periods. The performance period is three months. SCIP will provide containment bags and bins for tested transformers, electrical safety information, and escort services. The contractor is responsible for all equipment provision and removal, waste disposal (including PCB-contaminated waste), compliance with all applicable federal and state regulations (OSHA, USEPA, ADEQ, ADOT), and personnel licensing and certification appropriate to assigned work. No Arc Flash Hazard Analysis is required at the Maintenance Yard, but it must be addressed at the actively energized Saguaro Substation. OSHA Level C PPE with air-purifying respirators equipped with organic vapor and P100 cartridges is required for all laboratory building work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140A1127Q0091.pdf | ||
| Bid_Sheet_-_PCB_Assessment_SCIP.xlsx | XLSX spreadsheet | |
| IA_-_IEE_Representation_Form.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
PCB-Contaminated Equipment Assessment Services
SCIP Maintenance Yard and Saguaro Substation, Pinal County, Arizona Bureau of Indian Affairs -Western Regional Office
Division of Environmental, Safety, and Cultural Resources Management (DESCRM)
1.0 INTRODUCTION
This requirement is for polychlorinated biphenyl (PCB) oil assessment and related services for equipment owned and maintained by the Bureau of Indian Affair’s (BIA) San Carlos Irrigation Project
(SCIP). Required services include:
• Assessing the PCB content of oil in 100 unlabeled transformers located at the SCIP Maintenance
Yard (Yard)and associated laboratory building in Coolidge, AZ.
• Assessing the PCB content of oil in three circa-1965, 667 KVA transformers, located at the SCIP
Saguaro Substation, approximately one mile north of Kearny, AZ.
• Conducting indoor air analysis of the laboratory building at the Yard.
• Conducting PCB wipe testing of an approximately 45’ x 12’ laboratory building at the Yard and its contents (office furniture and shelves).
2.0 BACKGROUND
2.1 General
The SCIP Power Division began in March 1928, when Congress authorized funds to install hydroelectric generating facilities, called the Ashurst-Hayden Diversion Dam, in 1922. The power facilities were completed by 1931. Following construction of the dam, flows from Arizona’s upper Gila
River were determined to be too seasonably variable, which lead to undependable power generation, particularly during the winter. To improve reliability, a diesel electric generating plant was constructed in Coolidge, Arizona. This was a principal power source for SCIP from 1935 to 1974. In 1952, the BIA contracted with the Bureau of Reclamation to purchase power for SCIP from Davis Dam on the
Colorado River. Later agreements allowed SCIP to purchase power from the Parker-Davis Project, the
Colorado River Storage Project, Arizona Public Service (APS), the Salt River Project, and the Arizona
Power Pooling Association.
Current SCIP operations include distribution and metering of electricity and irrigation water utilities;
storage and service of electrical transformers; fuel storage and fueling operations; and parking and maintenance of vehicles and heavy‐duty electricity and irrigation equipment. SCIP does not currently generate electricity, but transmits and distributes purchased electricity, and distributes irrigation water for agricultural customers on the Gila River Indian Community lands and the San Carlos Irrigation and
Drainage District lands located in central Pinal County. As part of their electrical distribution service, SCIP maintains a number of electrical substations in southern Arizona, including the Saguaro Substation in Pinal County.
2.2 SCIP Maintenance Yard
The approximately 23.5‐acre Yard and adjoining project offices are located at 13805 N. Arizona
Boulevard, approximately two miles north of downtown Coolidge, Arizona at the junction of Highways
87 and 287 (Figure 1). The property includes SCIP offices, a large maintenance yard, maintenance shops, a laboratory building for unlabeled and PCB-containing transformer testing and storage, a former herbicide and possible pesticide storage area, and a former diesel-powered electric generating plant and metering building. Approximately one third of the Yard is paved. An electrical substation is located inside a gravel-covered, fenced area near the center of the Yard. Prior to removal in 2014, one 100,000-gallon diesel aboveground storage tank (AST), two 6,000-gallon lubricating oil product ASTs, one
1,000-gallon used motor oil AST, and one 2,000-gallon diesel pressure relief AST were present in the
Yard. Locations of PCB transformer storage are shown on Figure 2.
Transformers with oil containing PCBs were used and managed at the Yard for many years prior to regulation by the USEPA. Faulty (replaced) and decommissioned transformers continue to be gathered from the field and delivered to the yard. Transformers which are not labeled for PCB content were previously opened and tested for PCB content of the oil in laboratory building, prior to closing and resealing. The laboratory consists of an approximately 10’ by 12’ laboratory space and an adjacent 35’ by 12’ storage with secondary containment area. Transformers for which PCB content has been confirmed, as well as unlabeled, untested transformers, are typically stored on a grated, concrete secondary containment basin in the laboratory.
Generally, unlabeled transformers are moved directly from delivery vehicles to the laboratory storage area. However, during the summer of 2025, a shipment of 79 unlabeled transformers overwhelmed the laboratory’s storage and staffing capacity. Only 28 of these are currently stored in laboratory. Of these
28 transformers, 14 have been confirmed to contain PCB oil, nine do not contain PCB oil, and five have not yet been tested.
51 unlabeled transfers were placed, and remain stored, on the exterior ground within approximately 50 feet of the laboratory (Figure 3). Five were placed on the exterior concrete apron for the laboratory building, and 46 were placed on adjoining gravel-covered soil. None of these 51 transformers have been assessed for PCB content. Over the winter and early spring of 2025/2026, due to a staffing issue, approximately 40 additional unlabeled transformers have accumulated in the yard.
Based upon anecdotal accounts of SCIP and other BIA personnel, over 150 gallons of PCB-contaminated oil has been released into the secondary containment basin in the laboratory, most of which has evaporated. PCB releases occurred episodically over many years from leaking transformers stored on the secondary containment grate. Currently, the basin contains approximately 10 gallons of oil. SCIP has no record of the basin having been cleaned out, and it is believed that PCB-contaminated oil evaporated in the laboratory building. The interior of the laboratory building has an oily odor.
2.3 Saguaro Substation
The Saguaro Substation is located approximately two miles north of Kearny, on the west side of AZ
Highway 177 in Pinal County, AZ. The substation contains an active transformer in the central portion of an approximately 50’ by 50’ fenced and gated area and three approximately 15,600-pound inactive, offline, transformers, potentially containing PCB oil, inside the northern fenceline (Figure 4). The transformers were all installed in 1965. Their size and oil capacities are the same, with each labeled for
67,000 HV, 667 KVA, and 480 gallons of oil. It is unclear if the inactive transformers have been drained of oil.
3.0 STATEMENT OF WORK
3.1 Project Planning
The Contractor shall prepare a Project Work Plan to communicate and to formalize project objectives, approach, methods, notification procedures, schedule, regulatory requirements, organizational structure
(including list of subcontractors), and Contractor and personnel licenses and certifications.
The Project Work Plan shall include, but not be limited to, the following components:
• Site Descriptions
• Project Overview and Objectives
• Project Logistics and Schedule
• Task Procedures
• Health and Safety Plan (HASP)
• Quality Assurance Project Plan (QAPP)
Please note that investigation and characterization of historic PCB releases to the Yard are not included in the scope of work. The scope of work includes investigation and characterization of historic releases within only the laboratory building. The contractor is responsible for preventing releases to the Yard during contracted activities and for mitigating releases resulting from contracted activities, if they occur.
The Contractor shall submit draft and final versions of the Work Plan. A 7-calendar day review and comment period shall follow the submittal of the draft Project Work Plan. After incorporating comments and edits from DESCRM, the Contractor shall submit an electronic copy of the final Project
Work Plan to DESCRM. The final Work Plan deliverable shall be submitted within 21 calendar days from the notice to proceed (NTP).
3.2 Maintenance Yard Tasks
3.2.1 Transformer Testing
The Contractor shall complete testing for the PCB content of oil for 100 transformers, utilizing EPA-approved analytical methodologies. None of the transformers present in the maintenance yard are equipped with drain ports or sample valves. The testing will determine whether or not each transformer is PCB-contaminated (i.e., contain oil with >50 ppm concentration of PCBs). The contractor will apply a clearly visible, unique identification number in waterproof, permanent marking to each transformer, and sample numbering will incorporate the identification number. The Contractor will install appropriate containment (bags or bins, provided by SCIP) for all transformers which lack containment.
The contractor is responsible for moving transformers, if necessary, for sampling.The contractor is responsible for providing and removing all equipment utilized for this project, other than containment bags and bins for tested transformers.
The contractor is not required to perform an Arc Flash Hazard Analysis for equipment in the Yard. All equipment to be tested in the Yard is de-energized and at ground level. Powerlines are approximately 30 feet above ground. SCIP will provide electrical safety information requested by the contractor.
3.2.2 Indoor Air Analysis of the Laboratory Building
The contractor shall complete indoor air testing at three sampling locations within the building, using
EPA-approved methodology. Samples shall be collected from breathing zone levels. Analyses shall include petroleum hydrocarbons, volatile organic compounds (VOCs), semi-volatile organic compounds
(SVOCs), and PCBs. Two sampling locations will be located in the transformer storage area, and one sampling location will be located in the adjoining office area. OSHA Level C PPE with an air purifying respirator equipped with organic vapor and P100 cartridges is required for all tasks completed in the laboratory building.
3.2.3 Wipe Tests of the Laboratory Building
The Contractor shall conduct wipe testing of the laboratory building interior (walls, floors, ceilings, and contents) to assess PCB contamination, utilizing EPA-approved sampling and analytical methodologies, per 40 CFR 761. A total of 55 wipe tests will be conducted in the laboratory building, including:
• 10 tests of the floor area of the secondary containment room, a minimum of two which must be collected from the secondary containment basin and four which must be collected from the skirt and floor above the basin walls
• 16 tests of the walls of the secondary containment room
• Three tests of the ceiling of the secondary containment room
• Six tests of other surfaces in the secondary room, including shelves and stored equipment and supplies
• Four tests of the floor area of the office room
• Eight tests of the walls of the office room
• Two tests of the ceiling of the office room
• Six tests of other surfaces in the office room, including furniture.
OSHA Level C PPE with an air purifying respirator equipped with organic vapor and P100 cartridges is required for all tasks completed in the laboratory building. Alternative work scheduling to accommodate high daytime temperatures is acceptable.
3.2.4 Testing Report
Within two weeks of receiving all analytical results from laboratories, the Contractor shall submit a draft
Maintenance Yard Testing Report, per the Deliverables requirement.
3.3 Saguaro Tasks
3.3.1 Transformer Oil Testing
The Contractor shall complete testing for the PCB content of oil for each of the three inactive 667 KVA transformers, utilizing EPA-approved sampling and analytical methodologies.
At the Saguaro Substation, energized equipment will be directly overhead of transformers which are to be tested, approximately eight feet from the ground at the lowest pointed. Voltages present within this area are 69 kV transmission and 12.47 kV distribution. The drain ports of the transformers to be tested are at the bottom of the equipment, approximately one- to two feet above the ground. The contractor is expected to take all appropriate and requisite actions to address arc flash hazard during their work at this location. SCIP will provide the electrical safety information necessary for the contractor to identify electrical hazards and develop appropriate controls in the HASP.
3.3.2 Testing Report
Within two weeks of receiving analytical results for the PCB content of collected oil, the Contractor shall submit a draft Transformer Testing Report, per the Deliverables requirement.
4.0 DELIVERABLES
Maintenance Yard Testing Report
Upon completion of laboratory analysis, the Contractor shall prepare a Testing Report to present PCB investigative results for transformers’ PCB content, laboratory building air quality, and PCB wipe test result, as well as a description of tasks completed at the Yard. The report shall be issued in Draft and
Final forms, allowing review by stakeholders as determined by BIA. A 14-calendar day review and comment period shall follow the submittal of the draft Testing and Decontamination Report. After incorporating comments and edits from DESCRM, the Contractor shall submit an electronic copy of the final Testing and Decontamination Report to DESCRM.
At a minimum, the Maintenance Yard Testing and Decontamination Report shall include:
• Project objectives, tasks, methods, and schedule.
• A sample location map for wipe tests and air testing equipment.
• Separate tabulated analytical results for transformer PCB content, indoor air quality, and wipe test results.
• Laboratory methods, reports and chain of custody forms.
Saguaro Substation Transformer Testing Report
Upon completion of laboratory analysis, the Contractor shall prepare a Transformer Testing Report to present PCB investigative results for transformers’ PCB content. The report shall be issued in Draft and
Final forms, allowing review by stakeholders as determined by BIA. A 14-calendar day review and comment period shall follow the submittal of the draft Testing and Decontamination Report. After incorporating comments and edits from DESCRM, the Contractor shall submit an electronic copy of the final Testing and Decontamination Report to DESCRM.
At a minimum, the Maintenance Yard Testing and Decontamination Report shall include:
• Project objectives, tasks, methods, and schedule.
• Tabulated analytical results for transformer PCB content.
• Laboratory methods, reports and chain of custody forms.
5.0 GENERAL REQUIREMENTS
5.1 Permits
No special points of entry permits are required for entry into any substation property. SCIP Personnel shall provide escort during fieldwork but will not enter the laboratory building at the Yard. Please note that the Saguaro Substation shall not be de-energized for performance of fieldwork pursuant to this requirement. BIA has not completed an ArcFlash Hazard Analysis in preparation for this project; such requirements shall be identified and addressed in the Contractor’s HASP.
The Contractor shall comply with all applicable state and federal regulations (including but not limited to OSHA, USEPA, USDAT, ADEQ, and ADOT). All project staff shall have requisite and appropriate training, certification and licensing, commensurate with their assigned and actualized project work.
5.2 Tribal Requirements
No Tribal permits, licenses, or fees are required for this project.
5.3 Waste Management
The contractor is responsible for collecting and appropriately disposing all derived waste (including
PCB-contaminated waste) resulting from contracted activities.
6.0 PLACE OF PERFORMANCE
Both project sites are in Pinal County, Arizona. Field work at and travel to the SCIP Maintenance Yard and Saguaro Substation (Figures 1 through 3) is required.
7.0 PERIOD OF PERFORMANCE
The performance period for completion of this project is three months.
Figure 1 Location of the SCIP Maintenance Yard
SCIP Headquarters and Maintenance Yard
N . Arizona Blvd.
Figure 2 Unlabeled transformer storage and Laboratory Building
Laboratory Building and Transformer Storage
SCIP Property Boundary
N . Arizona B lvd.
Figure 3 Photographs from the SCIP Maintenance Yard
1) Transformer storage in the
Yard.
2) Transformer storage on the exterior concrete apron of the laboratory building.
3) Transformer storage in the laboratory building.
4) Secondary containment basin and grating.
2 3
Figure 4 Transformer location at Saguaro Substation
Transformers
| SCIP PCB Assessment SOW 10 14 2026.pdf |
| 1.0 INTRODUCTION |
| 2.0 BACKGROUND |
| 1.0 |
| 2.1 General |
| 2.2 SCIP Maintenance Yard |
| 2.3 Saguaro Substation |
| 3.0 STATEMENT OF WORK |
| 3.1 Project Planning |
| 3.2 Maintenance Yard Tasks |
| 3.2.1 Transformer Testing |
| 3.2.2 Indoor Air Analysis of the Laboratory Building |
| 3.2.3 Wipe Tests of the Laboratory Building |
| 3.2.4 Testing Report |
| Within two weeks of receiving all analytical results from laboratories, the Contractor shall submit a draft Maintenance Yard Testing Report, per the Deliverables requirement. |
| 3.3 Saguaro Tasks |
| 3.3.1 Transformer Oil Testing |
| Within two weeks of receiving analytical results for the PCB content of collected oil, the Contractor shall submit a draft Transformer Testing Report, per the Deliverables requirement. |
| 4.0 DELIVERABLES |
| Maintenance Yard Testing Report |
| Saguaro Substation Transformer Testing Report |
| 5.0 GENERAL REQUIREMENTS |
| 5.1 Permits |
| 5.2 Tribal Requirements |
| No Tribal permits, licenses, or fees are required for this project. |
| 6.0 PLACE OF PERFORMANCE |
| 7.0 PERIOD OF PERFORMANCE |