Paving suwon air base
Awarded Award Notice Posted
- Solicitation number
- W90VN6-17-R-0041
- Agency
- RCO Osan 411th CSB Expeditionary Contracting Command, Department of Defense
- Awarded
- to Korea Engineering Consultants Corporation
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- W91QVN-12-D-0139-0001 Federal contract award
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- PSC
- Not on record
- Place of performance
- Suwon Air Base 수 원 공 항 Jangji-dong, Gwonseon-gu, Suwon-si, Gyeonggi-do Suwon, Korea, South
Notice details come from SAM.gov. Updated .
Notice text
Added: Jul 26, 2017 1:44 am
The contractor shall provide all labor, tools, equipment, supplies and any other resources necessary to accomplish the scope of work contained herein as listed in the schedule and in accordance with the drawings, statement of work, specifications and terms and conditions contained herein.
(1) The contractor shall provide shop drawings after award of the contract.
(2) Contract performance period will be 210 days from the notice to proceed.
(3) All work shall be completed by OMAF specification 2014 revision 1 (2015) and attached drawings.
(4) The contractor shall request, in writing, the release of these facilities no less than 30 days prior to the start of work scheduled for the buildings.
b. PRINCIPAL FEATURES: This project includes, but shall not be limited to the following principal features:
0001. CIVIL WORK
A. Asphalt Pavement
A.1. EARTH/PLACING ASPHALT CONCRTE WORK
1. Construct approximately 4,800 square meters of asphalt pavement parking lot including subgrade preparation, minimum 127 millimeters thickness of base course, minimum 400 millimeters thickness of sub-base course, prime coating and tack coating work, asphalt pavement finishing, and compacting work as shown on the drawings.
2. Dispose and haul waste material off the base.
B. PAVEMENT MARKING
1. Apply approximately 121 square meters of pavement marking for parking lot area as shown on the drawings.
C. CAR WHEEL STOP
1. Install seventy (70) of vehicle wheel stops including form work, re-bars work, concrete work with finishing, and curing & protection work as shown on the drawings.
D. SOLID SODDING
1. Apply the solid sodding on disturbed un-paved area around new pavement parking lot area as shown on the drawings.
E. GROUNDING WORK
1. Install the eight (8) of new grounding post as shown on the drawings. Coordinate with 35th ADA for the grounding location before installing.
F. PLASTIC BOLLARDS
1. Install the ninety (90) of plastic bollards as shown on the drawings.
SITE VISIT
An organized site visit has been scheduled for--
1000 Hrs, 17 AUG 2017
Participants will meet at--
Suwon Air Base Walk-In Gate
수 원 공 항
Jangji-dong, Gwonseon-gu, Suwon-si, Gyeonggi-do
Site visits may be arranged during normal duty hours by contacting:
Name: CPT Voglezon, Royston S.
Email Address: royston.s.voglezon.mil@mail.mi
Telephone: 031-661-1148
Offerors who intend to propose on this solicitation are strongly encouraged to attend site visit. See site visit
Clause FAR 52.236-27 Alt I. Offerors are required to have a valid Korean Identification card when attending the
site visit orientation.
Offeror shall submit the following information to CPT VOGLEZON, ROYSTON S.
royston.s.voglezon.mil@mail.mil by 14:00 hours, 10 AUG 2017 for temporary access.
Offerors who do not RSVP by 10 AUG 2017 will not gain access to Suwon Air Base. Attendees are encouraged to be early, late arrivals will not gain access to Suwon Air Base. Offerors shall complete the attached Entry Authority List no later than 14:00 hors, 10 AUG 2017. Those who do not submit Entry Authority List will not gain access to Suwon Air Base.
Attachments
| File | Type | Posted |
|---|---|---|
| W90VN6-17-R-0041.pdf | ||
| Entry_Authority_List.xls | XLS spreadsheet | |
| 04._Drawings_for_WNHQ_17-5101.pdf |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity