PAVING SUWON AIR BASE Federal contract opportunity
Solicitation number
W90VN6-17-R-0041
Issued by
Department of the Army Materiel Command Expeditionary Contracting Command Regional Contracting Office Osan 411th CSB

View the file

Other files for this federal contract opportunity

Other files attached to PAVING SUWON AIR BASE, newest first.
File Type Posted
Entry_Authority_List.xls XLS spreadsheet
04._Drawings_for_WNHQ_17-5101.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F3J6SG7194A001

THIS IS A NON-WORK PLAN TASK ORDER RFP FOR THE FOLLOWING MATOC CONTRACTORS ONLY:

W91QVN-12-D-0137; W91QVN-12-D-0138, W91QVN-12-D-0139; W91QVN-12-D-0140; W91QVN-12-D-0141

OFFERORS MUST COMPLY WITH THE FOLLOWGS:

A. SITE VISIT: All MATOC offerors w ho intend to propose on this solicitation are strongly encouraged to attend the site visit. See site visit clause FAR 52.236-27 in Section L.

B. SUBMISSION OF PROPOSAL:

1) Proposal Packet: It shall be submitted by 1300 hours on the closing date of RFP through FBO w w w .fbo.gov

2) Pricing & Technical proposal in accordance w ith SOW and Instructions:

I) Price schedule

ii) Offer Breakdow n

iii) Completion of Clause, 5152.204-4032(Representations and Certif ications) in Section K.

C. If the Contractor is unable to submit the proposal in response to this RFP, the Contractor shall submit a "No-Offer Letter" by date and time specif ied in this solicitation.

CPT VOGLEZON, ROYSTON S. (031) 661-1148

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

26-Jul-2017

(RFP)

(IFB)

X

CALL:

Construct Asphalt Pavement Parking Lot

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________210 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

YES X NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________25 Aug 2017 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.

B. An offer guarantee is, X is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______210 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

411TH CONTRACTING SUPPORT BRIGADE, KOREA

RCO OSAN, UNIT #2039

APO AP 96278-2039

UNITED STATES OF AMERICA (THE)

W90VN6

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

01:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

WNHQ17-5101

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

W90VN6-17-R-0041 36

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Construct Asphalt Pavement Parking Lot

FFP

Contractor shall provide all personnel, labor, tools, equipment, materials, supervision, and transportation to construct asphalt pavement parking lot, Suwon AB FOB: Destination

PURCHASE REQUEST NUMBER: F3J6SG7194A001

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Estimated Cost for War Hazard

FFP

Estimated cost for War Hazard Losses is zero(0).

PURCHASE REQUEST NUMBER: F3J6SG7194A001

NET AMT

Section C - Descriptions and Specifications

STATEMENT OF WORK

TECHNICAL PROVISIONS – I

STATEMENT OF WORK

PROJECT NO TITLE LOCATION

WNHQ17-5101 Construct Asphalt Pavement Parking Lot Suwon Air Base (AB)

a. DESCRIPTION: The contractor shall provide all labor, tools, equipment, supplies and any other resources necessary to accomplish the scope of work contained herein as listed in the schedule and in accordance with the drawings, statement of work, specifications and terms and conditions contained herein.

(1) The contractor shall provide shop drawings after award of the contract.

(2) Contract performance period will be 210 days from the notice to proceed.

(3) All work shall be completed by OMAF specification 2014 revision 1 (2015) and attached drawings.

(4) The contractor shall request, in writing, the release of these facilities no less than 30 days prior to the start of work scheduled for the buildings.

b. PRINCIPAL FEATURES: This project includes, but shall not be limited to the following principal features:

0001. CIVIL WORK

A. Asphalt Pavement

A.1. EARTH/PLACING ASPHALT CONCRTE WORK

1. Construct approximately 4,800 square meters of asphalt pavement parking lot including subgrade preparation, minimum 127 millimeters thickness of base course, minimum 400 millimeters thickness of sub-base course, prime coating and tack coating work, asphalt pavement finishing, and compacting work as shown on the drawings.

2. Dispose and haul waste material off the base.

B. PAVEMENT MARKING

1. Apply approximately 121 square meters of pavement marking for parking lot area as shown on the drawings.

C. CAR WHEEL STOP

1. Install seventy (70) of vehicle wheel stops including form work, re-bars work, concrete work with finishing, and curing & protection work as shown on the drawings.

D. SOLID SODDING

1. Apply the solid sodding on disturbed un-paved area around new pavement parking lot area as shown on the drawings.

E. GROUNDING WORK

1. Install the eight (8) of new grounding post as shown on the drawings. Coordinate with 35th ADA for the grounding location before installing.

F. PLASTIC BOLLARDS

1. Install the ninety (90) of plastic bollards as shown on the drawings.

TECHNICAL PROVISIONS – II

STANDARD TECHNICAL DETAIL SPECIFICATIONS

WNHQ17-5101 Construct Asphalt Pavement Parking Lot Suwon Air Base (AB)

GENERAL: The project shall comply with attached tailored specification, 2014 OMA SPEC REVISION 1 and attached drawings.

The 2014 OMA SPEC REVISION 1 specification electronic files are available at the USFK website.

(http://www.usfk.mil/LinkClick.aspx?fileticket=T04DOvOMmXs%3d&tabid=19646&portalid=105).

DIVISION 01 - GENERAL REQUIREMENTS

01 33 00 SUBMITTAL PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 45 01 QUALITY CONTROL SYSTEM (QCS)

01 45 05 CONTRACTOR QUALITY CONTROL

01 57 20 ENVIRONMENTAL PROTECTION

01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 78 00 CLOSEOUT SUBMITTALS

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION AND DECONSTRUCTION

DIVISION 03 – CONCRETE

03 30 04 CONCRETE FOR MINOR STRUCTURES

03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE

DIVISION 05 - METALS

05 12 00 STRUCTURAL STEEL

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 11 16 SUBBASES FOR FLEXIBLE PAVING

32 11 23 AGGREGATE BASE COURSE

32 11 24 GRADED CRUSHED AGGREGATE BASE COURSE FOR PERVIOUS/FLEXIBLE PAVEMENT

32 12 10 BITUMINOUS TACK AND PRIME COATS

32 12 11 BITUMINOUS SURFACE TREATMENT

32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS

32 13 11 CONCRETE PAVEMENT FOR AIRFIELD AND OTHER HEAVY DUTY

PAVEMENTS

32 16 15.01 CONCRETE BLOCK PAVERS

32 92 19 SEEDING

32 92 23 SODDING

TECHNICAL PROVISIONS - III

General Requirements

1. SPECIFICATIONS: The project shall comply with tailored specification for WNHQ 17-5101, Construct Asphalt Pavement Parking Lot, Suwon AB, Korea. The specification electronic files are available at the 607th Materiel Maintenance Squadron, Civil Engineering Branch, Suwon Air Base. The 2014 OMA SPEC REVISION 1 specification electronic files are available at the USFK website.

(http://www.usfk.mil/LinkClick.aspx?fileticket=T04DOvOMmXs%3d&tabid=19646&portalid=105).

2. LOCATION OF WORK: Work to be performed under this contract will be at Suwon Air Base, Republic of Korea.

3. WORKING HOURS: Work to be performed under this contract shall be performed between the hours of 0700 and 1700, Monday through Friday, exclusive of Saturdays, Sundays, and holidays. Extended work hours, Saturday, Sunday, or holiday work may only be performed with written approval of the Contracting Officer’s Representative (COR). Request for extended work hours, Saturday, Sunday, or holiday work shall be forwarded to the COR for approval, no later than 1200 hours, one and a half (1-1/2) days prior to the requested work day.

4. ALERTS: During military alerts or special operations, anticipated not to exceed forty (40) working days per year of contract duration, the contractor may be denied access to the base or the work areas. When the contractor is prohibited from access to the base or worksite for one (1) day or less per month, no adjustment in the contract time shall be made. When the contractor is prohibited access for more than one (1) day per month, an adjustment to the contractor’s schedule will be made by the Contracting Officer

(KO).

5. PROJECT MANAGER: The contractor shall provide a project manager who shall be responsible for overseeing the performance of work. The name of this person shall be submitted in writing at least three

(3) calendar days prior to the pre-construction conference for review and approval by the Contracting Officer. Project Manager shall be hired by prime contractor. During the course of the contract, if it is determined that the project manager cannot perform his/her duties, the Contractor will be notified by the KO, in writing, to provide a qualified replacement. The project manager shall be available at the work site at all times to coordinate with representative of the U.S. Government.

6. DAILY REPORTING: It shall be the responsibility of the project manager to report to the COR or Government project inspector every workday at 0800 hours. The project manager shall provide the COR or Government project inspector with a daily report detailing the work which is being accomplished at the worksite. Failure on the project manager’s part to report to the COR or Government project inspector will result in a letter of concern, cure notice or Contract Discrepancy Report (CDR) requesting an immediate corrective action and actions to prevent recurrence for lack of coordinating the daily work report.

7. NOTIFICATION OF INSPECTIONS: Prior to starting work at the work site, the contractor shall advise the chief of 607th Materiel Maintenance Squadron Civil Engineering Section of the actual date that the contractor intends to start work. The contractor shall also give the COR or project inspector no less than two (2) work day notice prior to each concrete placement, asphalt placement field test, protective coating, or any other work deemed necessary by the COR or project inspector. The contractor shall also give at least a seven (7) work day written notification of the pre-final and final inspections. The 607th Materiel Maintenance Squadron Civil Engineering Section is located in building #5007, Daegu Air Base, Korea, base phone extension is 766-4547 or commercial (053) 980-4547.

8. CLOSE-OUT/TURNOVER MATERIALS: The contractor shall be responsible for providing the following material as part of final turnover to the U.S. Government. :

a. AS-built drawings shall be submitted to COR for review and acceptance in electronic format utilizing AutoCAD 2006 or higher and submitted on CD/DVD format (3 copies).

b. Operations and Maintenance (O&M) training shall be provided to U.S. Government personnel on new mechanical systems NLT 5 days prior to final acceptance. O&M Manuals shall be submitted in both electronic and hard copy format (3 copies each) with Hangul and English.

c. Turnover of all new facility keys and salvageable material (if any) shall be submitted to COR.

d. Contractor shall prepare DD 1354 (Transfer and Acceptance of DoD Real Property) with type and quantity of construction material installed including DD Form 1149, Requisition and Invoice/Shipping Document. When all materials have been turned over, the COR will notify the KO so that the final payment may be released. Up to five (5%) percent of the total contract amount may be withheld pending complete turnover of material stated in this paragraph.

9. AIR FORCE MATERIALS: All salvageable materials removed from the worksite shall remain the property of the U.S. Government. All such materials shall be disposed of by the contractor, upon coordination with the COR.

10. CONTRACTOR’S EQUIPMENT: All contractor equipment used in the performance of this contract shall be subject to a functional and safety inspection(s) at any time by the COR in accordance with U.S.

Air Force Safety Regulations and EM 385-1-1, U.S. Army Corps of Engineers Safety and Health Requirements Manual. Any equipment found not to be functional or safe shall be immediately repaired, replaced, or removed from the worksite by the contractor.

11. MATERIAL COMPLIANCE: The contractor shall be responsible to ensure that all materials used in the performance of the contract meet the specifications and requirements of this contract. Material(s) not meeting the specifications or not approved on AF Form 3000, Material Approval Submittal shall not be transported to the worksite. The COR shall be the approving authority for all materials used in the performance of this contract. All material(s) shall be new and the standard product of a manufacturer who is regularly engaged in the manufacturing of such products. Any materials used in the performance of this contract that have been damaged or that have not been approved on an AF Form 3000 shall be removed and replaced, at the expense of the contractor, and not the U.S. Government.

12. CONTRACTOR-FURNISHED MATERIAL AND CONTRACTOR-FURNISHED EQUIPMENT

(CFM/CFE): All CFM/CFE, including construction equipment, shall not be permitted to enter Suwon Air Base unless each item is approved on a DD Form 1149, Requisition and Invoice/Shipping Document. The contractor shall be responsible to notify the COR at least three (3) work days prior to the arrival of, or removal of, any CFM/CFE at Suwon Air Base.

13. WARRANTY OF CONSTRUCTION: In addition to any other warranties set out elsewhere in this contract, the contractor warrants that the work performed under this contract conforms to the contract requirements and is free of any defect of equipment, material, or design furnished, or workmanship performed by the contractor or any of his subcontractors or suppliers at any tier. Such warranty shall continue for a period of one (1) year from the date of final acceptance of the work, but with respect to any part of the work which the U. S. Government takes possession of prior to final acceptance, such warranty shall continue for a period of one (1) year from the date the U. S. Government takes possession. Under this warranty, the contractor shall remedy at his own expense, any such failure to conform or any other such defect. In addition, the contractor shall remedy at his own expense, any damage to U. S.

Government owned or controlled real or personal property, when that damage is the result of the contractor’s failure to conform to the contract requirements or any such defect of equipment, materials, workmanship, or design. The contractor shall also restore any work damaged in fulfilling the terms of this clause. The contractor’s warranty with respect to work repaired or replaced hereunder will run for one (1) year from the date of such repair or replacement.

14. CONTRACTOR’S TEMPORARY FACILITES: Erection of any facility by the contractor shall be coordinated with the COR. An approved U.S. Government Real Estate Permit from the Base Civil Engineer (BCE) shall be in the contractor’s possession prior to start of any such work. Any contractor erected facility shall be removed and the area cleaned, within seven (7) calendar days after completion of the contract requirements and prior to final invoice payment.

15. UTILITIES: All reasonable quantities of water and electricity necessary to perform the requirements of this contract shall be furnished to the contractor at no charge. Temporary connections shall be made and removed at the contractor’s own expense. Experienced and qualified craftsmen shall make all connections and this effort shall be coordinated with 607 MMS/CE, in Bldg. 5007, DSN 766-4204. The contractor shall pay for all costs to repair utility lines damaged by the contractor.

16. FIRE PROTECTION: The contractor shall comply with the provisions of the Base Fire Protection program, 607 ASGI 32-2001. The contractor shall provide suitable fire extinguishers at any material storage area constructed by the contractor as well as at the work site(s). The contractor shall ensure that all contractor employees understand that there will be no smoking inside of any U.S. Government facility, at any time, during the performance of work under this contract. The COR will identify to the contractor the designated smoking area for the contractor’s employees prior to starting any work. The contractor shall ensure that all contractor employees are aware of the designated smoking area and shall ensure that all contractor employees use the designated smoking area. Any contractor employee found smoking in any U.S. Government facility, at any time, shall be removed from the work site by the COR. The COR will notify the KO for the removal of any contractor employee for violation of the no smoking policy.

17. BURNING/WELDING OPERATIONS: The contractor shall be responsible to obtain a burning/ welding permit prior to any burning or welding operation. The contractor shall notify the COR not less than five (5) work days prior to such operations and shall return the permit to the U.S. Government inspector at the completion of the permit period. Contractor shall provide fire watch during all open flame/welding work.

18. VERIFICATION OF ACTUALITIES: It shall be the responsibility of the project manager to visit the worksite and thoroughly familiarize himself with all details of the work and working conditions. In the event that any field changes are required due to discrepancies between the contract drawings and actualities, it shall be the responsibility of the contractor to submit shop drawings of the required field change(s) to the COR. The contractor shall submit these shop drawings to the COR. The contractor shall not be authorized to perform any field changes without proper notification in writing from the KO.

19. BASE ACCESS: The contractor shall be required to obtain base access to Suwon AB to perform the requirements of this contract. The contractor shall be responsible to submit a base access request letter no later than five (5) calendar days after the award of this contract. It shall be the responsibility of the contractor to prepare the necessary base pass paperwork using ROKAF base pass templates including ROKAF background check sheet for each individual requiring access to Suwon AB. The contractor shall also be authorized to receive vehicle passes for each of the contractor’s vehicles used in the performance of this contract. It shall be the responsibility of the contractor to prepare the necessary paperwork using ROKAF vehicle registration, copy of driver’s license, for each vehicle requiring access to Suwon AB.

Coordination of these documents should be coordinated with the COR.

20. EMPLOYEE QUALIFICATIONS: It shall be the responsibility of the contractor to employ key personnel such as Central Point of Contact (CPOC), Project Manager (PM), Quality Control Manager (QM), and Safety Manager (SM). All key personnel shall be qualified to perform the types of work required under the terms of this contract and required to maintain satisfactory performance under the contract.

21. INVOICING: Seven (7) work days prior to submitting any invoice(s), it shall be the contractor’s responsibility to provide the COR with a written letter designating the authorized individual to submit invoices and receive payments under the term of this contract. The contractor shall submit six (6) copies of the invoice with carbon paper.

22. PRE-CONSTRUCTION CONFERENCE: It shall be the responsibility of the contractor to contact the COR within five (5) work days after award of this contract. The COR shall then schedule a pre-construction conference within three (3) work days with the using agency and any other base agencies having a direct impact by the work being performed by the contractor under the terms of this contract.

Failure on the contractor’s part to contact the COR within five (5) working days after award of this contract may result in termination of this contract.

23. REPAIR WORK: It shall be the contractor’s responsibility to repair all areas of patch work to match existing areas. This work will include all areas inside of the facility as well as any other areas that the contractor may have damaged during performance of work under the terms of this contract.

24. TEMPORARY SECURITY MEASURES: Whenever a facility or area is breached to perform work, it shall be the contractor’s responsibility to provide temporary measures in order to assure security is maintained at the appropriate levels that existed prior to construction.

25. CONTRACTOR’S RESPONSIBILITIES: It shall be the responsibility of the contractor to have full control of all contractor personnel during performance of work under the terms of the contract. The contractor shall be responsible to ensure that no contractor personnel receive any instructions for additional work from any Government personnel including the COR or project inspector. Any instructions for additional work shall only be issued by the KO. The contractor will be responsible for any cost incurred for any additional work, which is not identified in the contract specifications or on the contract drawings.

The contractor shall be responsible to inform the COR or project inspector of any request form any Government personnel for additional work. The contractor shall provide the COR with name of the individual requesting the additional work and the type of additional work being requested. The COR will take the necessary actions to inform the KO to prevent such situation.

26. PROGRESS SCHEDULE: Prepare for approval a Project Schedule IAW OandMA Spec 01 32 01. 00 10 and as specified herein, pursuant to the Contract Clause, SCHEDULE FOR CONSTRUCTION CONTRACTS. Show in the schedule the sequence in which the Contractor proposes to perform the work and dates on which the Contractor contemplates starting and completing all schedule activities. The scheduling of the entire project, including the design and construction sequences, is required. The scheduling of construction is the responsibility of the Contractor and contract will submit preliminary project schedule no less than 5 (five) calendar days after notice to proceed is issued.

Use the approved Project Schedule to measure the progress of the work and to aid in evaluating time extensions. Make the schedule cost loaded and activity coded. The schedule will provide the basis for all progress payments. If the Contractor fails to submit any schedule within the time prescribed, the Contracting Officer may withhold approval of progress payments until the Contractor submits the required schedule.

27. UTILITY OUTAGES/ROAD CLOSURES: It shall be the responsibility of the contractor to request, in writing, to the COR, a minimum of twenty-one (21) calendar days in advance for any water outage, electrical outage, or road closure. The contractor shall provide a requested date and estimated time for the water outage, electrical outage, or road closure. The COR shall be responsible for determining the impact of the water outage, electrical outage, or road closure. The COR shall also be responsible for the processing of the contractor’s request for a water outage, electrical outage, or road closure, the contract shall have written approval for the COR.

28. DEBRIS ON SITE: The contractor will weigh all construction debris removed from Suwon AB and report these quantities to 607th Materiel Maintenance Squadron Civil Engineering Section.

29. ASBESTOS CONTAINING MATERIALS: No asbestos containing materials (ACM) shall be used under this contract. ACM is any material containing more than 1% asbestos by weight, either along or mixed with other fibrous on non-fibrous materials.

30. OZONE DEPLETING SUBSTANCES: No Class I ODS shall be used in the performance of this contract, nor be provided as a part of the equipment. This prohibition shall prevail over any other provision, specification, drawings or referenced documents.

31. HAZARDOUS MATERIAL (HAZMAT) HANDLING, STORAGE AND DISPOSAL REQUIREMENTS:

The contractor is required to submit HAZMAT approval request forms (AF Form 3000) and Material Safety Data Sheets (MSDSs) for all HAZMAT brought onto the installation; track current HAZMAT inventories; properly store and dispose all HAZMAT; report spills of HAZMAT; and arrange an environmental inspection of the staging areas and areas where HAZMAT was stored before contract close-out IAW 51 FWI 32-7085 (Suwon AB Hazardous Material Management Process Operating Instruction).

a. MATERIAL SAFETY DATA SHEETS (MSDS): It shall be the responsibility of the contractor to furnish Material Safety Data Sheets (MSDS), in English and Korean, for all hazardous material(s) used under the terms and conditions of this contract. The type of materials that the contractor shall submit MSDSs for will include, but is not limited to paint, primer, lacquer, stain, joint compound, caulking, exterior insulation systems, emergency exit lights, cleaning fluids, oil, fuel, etc., and any other type of product deemed necessary by the Contracting Officer’s Representative (COR), required by U.S. Government Environmental Laws and Regulations, Korean Environmental Laws and Regulations and the 51 FWI 32- 7085.

b. AF Form 3000, HAZARDOUS MATERIAL APPROVAL REQUEST: The contractor shall submit AF Form 3000, Material Approval Submittal to the COR no later than fifteen (15) calendar days after the Notice to Proceed (NTP) is issued by the Contracting Officer (KO). Resubmission or revisions of material submittals shall be accomplished within seven calendar days after receipt of the material submittal package. Materials shall be ordered within two calendar days after receipt of written approval of material submittals. The contractor shall submit four (4) copies of the AF Form 3000 with carbon paper. The contractor shall submit the AF Form 3000 to the COR for review prior to submitting the AF Form 3000 for approval. It shall be the responsibility of the COR to verify the AF Form 3000 to ensure that all hazardous materials are submitted in the proper format. It shall be the responsibility of the contractor to list each type of hazardous material on the AF Form 3000. The contractor shall also be responsible to list the quantity, unit of measure (i.e.: each, liter, gallon, etc.), and size of container(s). It shall be the responsibility of the COR to verify these quantities and containers prior to initialing off on the AF Form 3000.

c. AF Form 3000, MATERIAL APPROVAL: After verification of all hazardous materials by the COR and the contractor, the COR shall then be responsible to process AF Form 3000 through 1) 607MMS/CEAN, Environmental Section located in Building 5007, DAEGU AB, DSN 766-4986, commercial telephone (053) 980-4986, 51st FW/SE; and 2) 51 AMDS/SGPB, Bioenvironmental Engineering located in Building 768, DSN 784-2326/4685, commercial telephone (031) 661-2326/4685 prior to bringing any hazardous materials onto SuwonAir Base, Korea. After receiving approval for all hazardous materials, it shall be the responsibility of the COR to provide the KO and the contractor with a copy of the signed AF Form 3000 for the official files.

d. The contractor is required to track the HAZMAT brought onto the installation by registering the HAZMAT with the HAZMART Pharmacy and applying bar-codes to all HAZMAT IAW 51 FWI 32-7085.

When registering HAZMAT with HAZMART Pharmacy (Building #1631, DSN 784-9285/9286, commercial telephone (031) 661-9285/9286), the contractor must submit the MSDSs in English, request bar-codes for all HAZMAT, affix the barcodes to the HAZMAT, and clear out the bar-codes when the material is consumed or removed from the base. The contractor shall be responsible to keep a current inventory of HAZMAT in addition to posting an approved copy of the AF Form 3000 at the worksite storage area as well as keep a signed copy of the AF Form 3000 in the contractor’s field office. It shall be the responsibility of the contractor to provide the COR with a new AF Form 3000 for any additional hazardous materials brought onto Suwon Air Base throughout the term of the contract. This shall include any new materials as well as any additional quantities over and above the originally approved quantities.

In lieu of tracking HAZMAT with barcodes issued from the HAZMART Pharmacy, the contractor can agree to submit a HAZMAT inventory each month IAW an alternative 51 FW/CC approved method of tracking the volume of HAZMAT on the installation. When agreeing to track current volumes of HAZMAT, the contractor is required to submit the inventory of hazardous materials by the 15th of each month and ensure MSDSs in English are also submitted for all hazardous materials. The monthly inventory must include:

1. Name of HAZMAT and a common name, if applicable.

2. Major use of HAZMAT (e.g. paint, primer, lacquer, stain, joint compound, caulking).

3. Number of containers and volume of each container.

The monthly inventories can be submitted by email to mu_song.so.kr@us.af.mil, or by delivery to 607 MMS/CEAN, in Bldg 5007, DAEGU AB, DSN 766-4986.

e. HAZARDOUS MATERIALS STORAGE: It shall be the responsibility of the contractor to keep a current inventory posted at the hazardous material storage area. The storage area may be a cage or other area that is locked or secured when not in use as well as at the end of each workday. The inventory must be updated daily as the HAZMAT is consumed.

f. HAZARDOUS MATERIAL SPILLS: In the event that the contractor accidentally spills any hazardous materials at the worksite, it shall be the responsibility of the contractor to immediately notify 607 MMS/CEAN, in Bldg 5007, Daegu AB, DSN 766-4986. The contractor shall be responsible for identifying the location of the spilled material, the quantity of spilled material, and the type of spilled material. The contractor shall also be responsible to notify the COR. The contractor shall not, under any conditions, remove and dispose of any spilled hazardous material(s) without prior approval of 607

MMS/CEAN.

g. DISPOSAL REQUIREMENTS FOR HAZARDOUS MATERIALS: It shall be the responsibility of the contractor to remove all hazardous materials from the installation, at the contractor’s own expense, upon completion of the contract including the removal of hazardous materials from the worksite as well as the contractor’s field office area. The contractor must notify the COR prior to disposing of any hazardous materials off the installation to ensure that all hazardous materials are properly handled and disposed of correctly. After use or final disposal of all hazardous materials, it shall be the responsibility of the COR to notify the HAZMART Pharmacy of the final disposition of the hazardous materials in order to clear out the barcodes from the HAZMAT tracking system in the AF-EMIS database. Prior to contract close-out, the contractor must make an appointment with 607 MMS/CEAN to perform an environmental inspection of the staging areas and areas where HAZMAT was stored.

32. EROSIONAL CONTROL MEASURES: All projects involving digging, or other exposure of unconsolidated soil, require erosional control measures IAW the Korean Environmental Governing Standards (KEGS 13-3, j), the Suwon AB Storm Water Pollution Prevention Plan and the Suwon AB Integrated Natural Resources Management Plan. Contractors are required to implement erosion control best management practices (BMPs) to control dust and keep sediment off the roads and out of storm sewers and these measures must be included in the shop drawings. The erosional control BMPs which must be approved by 607 MMS/CEAN, in Bldg 5007, DAEGU AB, DSN 766-4986. prior to the initiation of the ground work, include vegetation cover, stream bank stabilization, slope stabilization, silt fences, construction of terraces, interceptor channels, sediment traps, inlet and outfall protection, diversion channels, and sedimentation basins. Any temporary measures shall be removed after the area has been stabilized. 607 MMS/CEAN, in Bldg 5007, DAEGU AB, DSN 766-4986 will inspect construction sites to ensure the implemented erosional control measures are adequate and effective.

33. MATERIAL APPROVAL SUBMITTALS (AF Form 3000): The Contractor shall, submit through the COR for initial verification and submit to the KO for approval all proposed materials and documents IAW FAR 52.236-5 Materials and Workmanship, using the AF Form 3000 or EANC Form 74. The AF Form 3000 or EANC Form 74 shall be submitted within fifteen (15) calendar days after receipt of the Notice to Proceed (NTP), or as otherwise specified on the approved Schedule of Material Submittals or directed by the KO. Resubmission or revisions of material submittals shall be accomplished within seven calendar days after receipt of the material submittal package. Materials shall be ordered within two calendar days after receipt of written approval of material submittals. The Contractor proceeds at their own risk, installing any products listed on the AF Form 3000 or EANC Form 74 before receiving approval by the KO.

The Contractor shall be responsible for all replacement cost at no additional cost to the Government. The Contractor shall significantly identify on the form, and all associated printed documentation, all material substitutions that deviate from the requirements of the project request documents, negotiation results, and/or this specification. Failure to identify these material substitutions on the AF Form 3000 or EANC Form 74 at time of submission shall not relieve the Contractor from all replacement costs at no additional cost to the Government.

Any materials used at the work site without prior approval on an AF Form 3000 or EANC Form 74 will be rejected by the COR.

34. SITE VISIT: It shall be the responsibility of the contractor to be familiar with the scope of work and work site conditions prior to submitting a proposed bid for this contract. The U.S. Army Contracting Command Korea (USA411TH CSB) will establish and publish a site visit.

35. AIR FORCE NON-HAZARDOUS SOLID WASTE DIVERSION POLICY: All Air Force installation within the continental United States and its territories, and all overseas installation that generate solid waste must report non-hazardous solid waste data. So, IAW EO 13423, Instructions for implementing Executive Order 13423, Sec IX. A. the contractor shall submit all data for non-hazardous solid waste to COR and 607 MMS/CEAN during the construction, renovation, demolition or deconstruction period. But installations generating less than one ton of solid waste per day may be exempt from these reporting requirement. Contact COR and 607 MMS/CEAN, in Bldg 5007, DAEGU AB, DSN 766-4986 prior to the pre-construction conference for further details.

36. DEBRIS REMOVAL DISPOSAL INFORMATION: The Contractor shall remove and dispose of all debris generated by the contractor in accordance with ROK Ministry of Environment (MOE) laws and regulations.

NOTE TO PROPOSAL SCHEDULE

The offer’s proposal must contain all contractor’s costs including mobilization, demobilization, overhead, profit, insurance, supervision and management, implementation of safety and contractor quality control, and all other costs including but not limited to compliance with environmental laws, tax laws, protection of moving or government property, engineering services (to include survey work and drawings) and waste disposal inherent to accomplish the work requested. No allowance will be made later for any other purpose whatsoever unless specifically allowed elsewhere in the contract.

LIST OF APPLICABLE CONTRACT DRAWING

WNHQ17-5101 Construct Asphalt Pavement Parking Lot Suwon Air Base (AB)

SHT NO DWG NO. DESCRIPTION

1 G-001 TITLE SHEET, SCHEDULE OF DRAWINGS & CROSS REFERENCING

CONVENTIONS

2 G-008 PROJECT LOCATION PLAN (SUWON AIR BASE)

3 CE101 SITE LAYOUT PLAN

4 CS501 TYPICAL AC PAVEMENT DETAILS

5 CS502 GROUNDING, Con’c DITCH, PLASTIC BOLLARD DETAILS

CONTRACT SUBMITTAL REQUIREMENT

MATERIAL APPROVAL SUBMITTALS: Contractor shall have an approved AF Form 3000 for all material witch are on the lists in provided “SUBMITTAL REGISTER” that is to be used on this contract. Contractor shall submit 4 copies of AF Form 3000 to the COR for approvals at least 15 days prior to ordering or using material for this project. Materials listed below require additional submittals as specified (i.e.

sample, certificates of compliance, test data, catalog cuts, brochures, etc.)

ITEM NO. DESCRIPTION TYPE SUBMITTAL

1 Asphalt Concrete Mix Design

2 Base course, Sub-base course Result of test

3 All kind reinforcing steel bar Cat Cut or Sample

4 All kind finish materials (MARKING) Cat Cut or Sample

5 Plastic Bollard Cat Cut or Sample

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government 0002 N/A N/A N/A Government

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC

0001 210 dys. ADC 1 607MMS, DET 1/LGS

KANG, SUNG WON

607TH MMS CEP, DAEGU AB/SUWON AB

APO AP 96262-2120

UNITED STATES OF AMERICA (THE)

766-4600

F3J6SG

0002 N/A N/A N/A N/A

Section G - Contract Administration Data

Section I - Contract Clauses

CLAUSES INCORPORATED BY REFERENCE

52.204-7 System for Award Management OCT 2016 52.228-4 Workers' Compensation and War-Hazard Insurance Overseas APR 1984 52.237-2 Protection Of Government Buildings, Equipment, And

Vegetation

APR 1984

52.247-21 Contractor Liability for Personal Injury and/or Property Damage

APR 1984

252.201-7000 Contracting Officer's Representative DEC 1991 252.225-7041 Correspondence in English JUN 1997 252.232-7008 Assignment of Claims (Overseas) JUN 1997 252.233-7001 Choice of Law (Overseas) JUN 1997 252.236-7001 Contract Drawings, and Specifications AUG 2000 252.243-7001 Pricing Of Contract Modifications DEC 1991

CLAUSES INCORPORATED BY FULL TEXT

52.203-2 CERTIFICATE OF INDEPENDENT PRICE DETERMINATION (APR 1985)

(a) The offeror certifies that --

(1) The prices in this offer have been arrived at independently, without, for the purpose of restricting competition, any consultation, communication, or agreement with any other offeror or competitor relating to –

(i) Those prices,

(ii) The intention to submit an offer, or

(iii) The methods of factors used to calculate the prices offered:

(2) The prices in this offer have not been and will not be knowingly disclosed by the offeror, directly or indirectly, to any other offeror or competitor before bid opening (in the case of a sealed bid solicitation) or contract award (in the case of a negotiated solicitation) unless otherwise required by law; and

(3) No attempt has been made or will be made by the offeror to induce any other concern to submit or not to submit an offer for the purpose of restricting competition.

(b) Each signature on the offer is considered to be a certification by the signatory that the signatory --

(1) Is the person in the offeror's organization responsible for determining the prices offered in this bid or proposal, and that the signatory has not participated and will not participate in any action contrary to subparagraphs (a)(1) through (a)(3) of this provision; or

(2) (i) Has been authorized, in writing, to act as agent for the following principals in certifying that those principals have not participated, and will not participate in any action contrary to subparagraphs (a)(1) through (a)(3) of this provison ______________________________________________________ (insert full name of person(s) in the offeror's organization responsible for determining the prices offered in this bid or proposal, and the title of his or her position in the offeror's organization);

(ii) As an authorized agent, does certify that the principals named in subdivision (b)(2)(i) above have not participated, and will not participate, in any action contrary to subparagraphs (a)(1) through (a)(3) above; and

(iii) As an agent, has not personally participated, and will not participate, in any action contrary to subparagraphs (a)(1) through (a)(3) of this provision.

(c) If the offeror deletes or modifies subparagraph (a)(2) of this provision, the offeror must furnish with its offer a signed statement setting forth in detail the circumstances of the disclosure.

(End of Provision)

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than .210 days The time stated for completion shall include final cleanup of the premises.

(End of clause)

52.222-50 COMBATING TRAFFICKING IN PERSONS (MAR 2015) ALTERNATE I (MAR 2015)

(a) Definitions. As used in this clause—

“Agent” means any individual, including a director, an officer, an employee, or an independent contractor, authorized to act on behalf of the organization.

“Coercion” means—

(1) Threats of serious harm to or physical restraint against any person;

(2) Any scheme, plan, or pattern intended to cause a person to believe that failure to perform an act would result in serious harm to or physical restraint against any person; or

(3) The abuse or threatened abuse of the legal process.

“Commercial sex act” means any sex act on account of which anything of value is given to or received by any person.

“Commercially available off-the-shelf (COTS) item” means--

(1) Any item of supply (including construction material) that is—

(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

“Debt bondage” means the status or condition of a debtor arising from a pledge by the debtor of his or her personal services or of those of a person under his or her control as a security for debt, if the value of those services as reasonably assessed is not applied toward the liquidation of the debt or the length and nature of those services are not respectively limited and defined.

“Employee” means an employee of the Contractor directly engaged in the performance of work under the contract who has other than a minimal impact or involvement in contract performance.

“Forced labor” means knowingly providing or obtaining the labor or services of a person—

(1) By threats of serious harm to, or physical restraint against, that person or another person;

(2) By means of any scheme, plan, or pattern intended to cause the person to believe that, if the person did not perform such labor or services, that person or another person would suffer serious harm or physical restraint; or

(3) By means of the abuse or threatened abuse of law or the legal process.

“Involuntary servitude” includes a condition of servitude induced by means of—

(1) Any scheme, plan, or pattern intended to cause a person to believe that, if the person did not enter into or continue in such conditions, that person or another person would suffer serious harm or physical restraint; or

(2) The abuse or threatened abuse of the legal process.

“Severe forms of trafficking in persons” means—

(1) Sex trafficking in which a commercial sex act is induced by force, fraud, or coercion, or in which the person induced to perform such act has not attained 18 years of age; or

(2) The recruitment, harboring, transportation, provision, or obtaining of a person for labor or services, through the use of force, fraud, or coercion for the purpose of subjection to involuntary servitude, peonage, debt bondage, or slavery.

“Sex trafficking” means the recruitment, harboring, transportation, provision, or obtaining of a person for the purpose of a commercial sex act.

“Subcontract” means any contract entered into by a subcontractor to furnish supplies or services for performance of a prime contract or a subcontract.

“Subcontractor” means any supplier, distributor, vendor, or firm that furnishes supplies or services to or for a prime contractor or another subcontractor.

“United States” means the 50 States, the District of Columbia, and outlying areas.

(b) Policy. The United States Government has adopted a policy prohibiting trafficking in persons including the trafficking-related activities of this clause. Contractors, contractor employees, and their agents shall not—

(1) Engage in severe forms of trafficking in persons during the period of performance of the contract;

(2) Procure commercial sex acts during the period of performance of the contract;

(3) Use forced labor in the performance of the contract;

(4) Destroy, conceal, confiscate, or otherwise deny access by an employee to the employee's identity or immigration documents, such as passports or drivers' licenses, regardless of issuing authority;

(5)(i) Use misleading or fraudulent practices during the recruitment of employees or offering of employment, such as failing to disclose, in a format and language accessible to the worker, basic information or making material misrepresentations during the recruitment of employees regarding the key terms and conditions of employment, including wages and fringe benefits, the location of work, the living conditions, housing and associated costs (if employer or agent provided or arranged), any significant cost to be charged to the employee, and, if applicable, the hazardous nature of the work;

(ii) Use recruiters that do not comply with local labor laws of the country in which the recruiting takes place;

(6) Charge employees recruitment fees;

(7)(i) Fail to provide return transportation or pay for the cost of return transportation upon the end of employment--

(A) For an employee who is not a national of the country in which the work is taking place and who was brought into that country for the purpose of working on a U.S. Government contract or subcontract (for portions of contracts performed outside the United States); or

(B) For an employee who is not a United States national and who was brought into the United States for the purpose of working on a U.S. Government contract or subcontract, if the payment of such costs is required under existing temporary worker programs or pursuant to a written agreement with the employee (for portions of contracts performed inside the United States); except that--

(ii) The requirements of paragraphs (b)(7)(i) of this clause shall not apply to an employee…