Paving, Grading and Drainage Requirements

Closed Solicitation Posted

Solicitation number
W911SF-17-B-0003
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Contract number
W911SF18D0001 Federal IDV award
Awardee
Columbus Barricades, Inc.
NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Not on record
Place of performance
Micc-Fort Benning 6650 Meloy Drive, Room 250 (Fort Benning and Surrounding Locations Indicated in Paragraph 1) Fort Benning, Georgia 31905, United States

Notice details come from SAM.gov. Updated .

Notice text

Added: Feb 27, 2018 3:36 pm

This announcement constitutes the only solicitation/invitation for bids.  The original sources sought was W911SF-17-R-PVMT is now being solicited as Soliciation number W911SF-17-B-0003 and is issued as an Invitation for Bids (IFB) unless other indicated herein.

The contractor shall furnish all labor, equipment, incidentals, supervision and transportation for work necessary to provide grading, drainage, and paving at various locations on Fort Benning property as directed by the Directorate of Public Works (DPW) to include Camp Rudder, Florida, Camp Merrill in Dahlonega, Georgia, and Morale, Welfare and Recreation (MWR) facilities in Destin, Florida. Unless otherwise specified, the plans provided to the Contractor will represent a 35% design. The Contractor is required to provide the DPW with 100% design plans prior to commencement of any construction work. The Contractor will be required to perform the necessary surveying to properly design and layout the new work. When required, the Contractor is to provide the necessary documentation in order to obtain a National Pollutant Discharge Elimination
System (NPDES) permit for the new construction. When all work is complete, the Contractor will be required to provide the DPW with a complete set of As-Built drawings (both electronic and hard copy).

*The Contractor must be able to meet the eligibility requirements to become prequalified and become an approved contractor with the Georgia Department of Transportation and must become approved by both ALDOT and GADot, within 180 Days of the Awarding for the contract.*

Files

File Type Posted
W911SF-17-B-0003_(Paving_IFB).pdf PDF
IFB_17-B-0003_Material_Listing__FY17-FY22.xls XLS spreadsheet

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity