P588 Fuller Road Improvements, MCB, Quantico, VA

Pre-Solicitation Posted

Solicitation number
N4008017R0223
Agency
Naval Facilities Engineering Command Department of the Navy, Department of Defense
Responses due
Not on record
Set-aside
No set-aside

Opportunity facts

Contract number
N4008018C0034 Federal contract award
NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Not on record

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

Added: Jan 24, 2017 11:30 am Modified: Jan 25, 2017 10:13 amTrack Changes The NAICS Code is hereby corrected from 236220 to the correct NAICS Code is 237310.

Update #1 ·

Added: Jan 24, 2017 11:30 am This project is for the expanding Fuller Road from US Highway 1 to Mason Drive (approximately 0.5 miles), relocation of utilities, demolition of existing structures, and construction of support facilities. Road expansion will include construction of additional traffic lanes. Construction will meet the Virginia Department of Transportation Road Specifications. Demolition will include removal of the current gatehouse at Gate 1 on Fuller Road. Site preparation includes forest clearing, grading, retaining walls, and incidental related work.



Utility relocation will include rerouting of information systems including basic telephone, computer network, fiber optic, security, and fire alarm systems as well as infrastructure utilities.

Electrical utilities include relocation and replacement of primary and secondary distribution systems, lighting, underground transformers, lightning protection, security system, and traffic signals. Mechanical utilities include heating, ventilation and air conditioning, water lines, plumbing and plumbing fixtures, sanitary sewer lines, fire protection systems and supply lines.



New construction will include a gatehouse, two sentry houses, and personnel weather shelters. The gatehouse and sentry houses will be constructed of CMU walls with brick and/or cast tone veneer, slab on grade foundation, and sloped standing seam metal roofing. Weather shelters will consist of canopy structures and outdoor storage areas utilizing drilled piers with spread footings, structural steel frames, and sloped standing seam metal roof.

All new construction will comply with the base exterior architecture plan including Georgian architectural facades.

Attachments

Files attached to this notice, newest first
File Type Posted
P588_AMENDMENT_0002.pdf PDF
Amendment_0001_P588.pdf PDF
SOLICITATION_P588.pdf PDF
Attachment_C_-RFI_Form_P588.doc DOC document
ATTACHMENT_A_P588.docx DOCX document
ATTACHMENT_B_P588.docx DOCX document
N4008017R0223_P588_Pre_Solicitation_Notice.pdf PDF

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity