About this opportunity
The Department of the Air Force Materiel Command Air Force Sustainment Center is seeking to award a one-year firm-fixed-price requirements contract for the overhaul of B-1 hydraulic motors. The contractor will be responsible for furnishing all materials, facilities, labor, parts, and expertise necessary to restore the government-furnished reparable items to a like-new condition through disassembly, cleaning, inspection, rehabilitation, reassembly, testing, and finishing. Pricing is expected to be based on adequate price competition, but certified cost or pricing data may be required if fair and reasonable pricing cannot be determined. A pre-award survey and/or initial production evaluation is required, and qualification requirements apply for offerors.
There is no set-aside designation for this procurement. The total contract value is not expected to exceed $3 million. The contractor will be responsible for meeting the government's required delivery schedule, and 100% of delivered end items must be defect-free. The work will be performed at the contractor's facility, and the government will only pay for missing components or as specified in the Performance Work Statement/Statement of Work. The contract is subject to the Service Contract and Labor Standards requirements.
Notice text
OVERHAUL
A 1-YEAR (ONE-YEAR BASIC AND No Options) FIRM FIXED PRICE REQUIREMENTS TYPE CONTRACT IS CONTEMPLATED.
NOTE: It is anticipated that pricing of this action will be based on adequate price competition; therefore, offerors are not required to submit certified cost or pricing data at the time of proposal. However, if after receipt of proposals, it is determined that adequate price competition does not exist, a request for other than certified cost or pricing data may be required in accordance with FAR 15.401-1(B)(1). If cost still cannot be determined fair and reasonable, then certified cost and pricing data will be required in accordance with DFARS 252.215-7008.
(a) A Pre-Award Survey and/or Initial Production Evaluation (IPE) is required. Details are provided in Appendix A, paragraphs 1.2 and 1.3 respectively.
(b) The contractor shall furnish all material, plant facilities, labor, parts, equipment, and expertise necessary to perform the Overhaul, calibration and functional test required to restore Government furnished reparables to a like-new condition. The contractor shall also accomplish necessary packing and preservation and packaging and return to the Government in completely serviceable condition, at the unit price(s) established at the time of award, the items of Air Force equipment listed below, all in accordance with the provision hereof and the Work Specification in Section J hereof. ALL work shall be completed in accordance with the requirements specified herein (including attachments hereto) and all costs associated with work specifications, technical orders, and/or cost associated with Over and Above request (excluding missing parts) shall be included in the unit price. The government shall only pay the contractor for missing components or as specified in the PWS/SOW after review and approval of O&A requests. No additional cost will be allowed (i.e. material handling, profit, direct or indirect costs).
(c) Overhaul is the restoration of an item to a completely serviceable condition as prescribed by maitenance serviceability standards.
(d) In order to receive any technical data related to this acquisition, offerors must send an email request to Dessie Breslin at dessie.breslin@us.af.mil or David O'Rourke at david.orourke@us.af.mil. Release of any data is subject to applicable data rights. The request shall include the applicable solicitation number, the specific data needed (including TO(s)), and a copy of the current, approved DD Form 2345. The form, including instructions for completing the form, is available at: http://www.dtic.mil/whs/directives/infomgt/forms/forminfo/forminfopage2220.html. The Government is not responsible for incomplete, misdirected, or untimely requests.**
(e) GOVERNMENT PROPERTY FURNISHED FOR OVERHAUL (FAR 16.503(c))
Failure of the Government to furnish such items in the amounts or quantities described in the Schedule as “estimated” or “maximum” will not entitle the contractor to any equitable adjustment in price under the Government Property clause of the contract.
(f) END ITEMS BEYOND OVERHAUL
"Reparable End Items" are defined as end items which can be restored to a serviceable condition, in accordance with applicable requirements. Some units of items listed in Section B may, upon disassembly and/or inspection, be determined to be beyond the overhaul limits specified in the Work Specification and/or Technical Orders. Any cost for work performed by the Contractor prior to determination that such equipment is beyond these limits, shall be included in the unit price(s) of the listed item(s).
If the contractor estimates that any item is not reparable (i.e. beyond overhaul), the Contractor shall promptly notify the contracting officer in writing and shall not perform further overhaul on any such items except at the direction of the contracting officer (PCO). Upon written confirmation from the PCO that a particular item is not reparable, the contractor shall abide by the disposition instructions of the asset in the manner directed by the PCO.
(g) Condemned units shall not be counted as production.
(h) In the event there are component part(s) with long lead times, the awardee is responsible for securing necessary parts to meet the Government’s required delivery schedule.
(i) In the event that DFARS clause 252.217-7001, Surge Option, is invoked, quantities and prices will be negotiated at that time. The fill-in data in Clause 252.217-7001 will be TBD until a surge is known and negotiations are necessary.
(j) Item Unique Identification (IUID) marking is required in accordance with DFARS 252.211-7003. Contractor determined location and method of marking is acceptable.
(k) The Service Contract and Labor Standards (SCLS) formerly Service Contract Act (SCA) is applicable to this effort.
(l) In accordance with the Service Contract Reporting in the System for Award Management Guidebook, the total contract value is not expected to exceed $3M thus Manpower Reporting is not applicable.
(m) Qualification requirements apply. Interested vendors that have not been previously qualified for this acquisition must submit a Source Approval Request (SAR) package to the Source Development, Small Business Office @ 405-739-7243.
SAR submittals need to be sent to:
https://www.tinker.af.mil/Home/429SCMS-SASPO/ <https://www.tinker.af.mil/Home/429SCMS-SASPO/>
Source Development Specialist Email: stacy.cochran@us.af.mil <mailto:stacy.cochran@us.af.mil>
As prescribed in FAR 9.202(e), the contracting officer need not delay a proposed award in order to provide a potential offeror with an opportunity to demonstrate its ability to meet the standards specified for qualification.
(n) Dates listed in clauses 252.216‐7006 and 52.216‐21 are based on the estimated award date. These dates will be revised prior to award based on the actual award date.
Files
| File | Type | Posted |
|---|---|---|
| DID 81995A CDM Production Report.pdf | ||
| PWS.pdf | ||
| Packaging Requirements.pdf | ||
| DID 81838 CAV Reporting.pdf | ||
| FA811824R0067.pdf | ||
| GFP.pdf | ||
| Wage_Determination.pdf | ||
| Transportation Data.pdf | ||
| DID 80441D Govt Property Inventory.pdf | ||
| CAV_AF.pdf | ||
| DID 80969 Surge Plan.pdf | ||
| CDRL.pdf |
Show all 12
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| Overhaul of B-1 Hydraulic Motors | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Overhaul B-1 electro-mechanical actuators | Air Force Sustainment Center | No set-aside | |
| Overhaul of the UH-60 POWER TURBINE MODULE | ACC Redstone | No set-aside | |
| Solicitation for Overhaul of the Hydraulic Valve | ACC Redstone | Total Small Business | |
| Med. Press. Pump Module Motor Rebuild | Air Force Sustainment Center | Total Small Business | |
| RFP- FD20301901983_FA811824R0035 -0003 OH B2 ACTUATORS (Amendment -0003 ) | Air Force Sustainment Center | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity