Outflow Left Bank Long-Term Repair Tionesta Lake
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W911WN22B8009
- Agency
-
ENDIST Pittsburgh
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Place of performance
- Tionesta, Pennsylvania 16353, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers, Pittsburgh District is seeking to implement long-term repairs to the left bank outflow at Tionesta Lake in Forest County, Pennsylvania to provide erosion protection and support for the campground access road. Key requirements of the contract include installing a sheet pile wall along the top of bank with gravel backfill and weep holes; excavating and preparing the pavement subgrade; placing the proposed pavement section and topsoil with seeding and mulching; and installing guide rail, wall cap, and handrail. Bids were due by August 4, 2022 and were to be submitted electronically through the Procurement Integrated Enterprise Environment.
This opportunity is set aside for total small businesses. The NAICS code is 237990 for heavy construction and the estimated value is between $250,000 and $500,000. Gregori Construction Inc. submitted the lowest bid of $861,168.00. Construction must occur near the campground access road and minimize intrusion to the facility and road, with work to be completed within one year of notice to proceed. The place of performance will be in Tionesta, Forest County, Pennsylvania.
Notice text
4 versions
Update #4 · Latest ·
Tionesta Lake Outflow Left Bank Long-Term Repair - The U.S. Army Corps of Engineers, Pittsburgh District, has a project to implement long term repairs at the left bank at Tionesta Lake, Forest County, PA. The purpose of the long-term repair is to provide erosion protection and support of the campground access road. The failure negatively impacts the District?s ability to respond to a dam safety emergency and conduct dam safety inspections. The repair will reduce future erosion which in turn will prevent more significant repairs. The major features of the requirements are identified below: The contract specifically includes: Install all Erosion and Sedimentation controls in accordance with the Contract Documents. Install a sheet pile wall along the top of bank with top of wall ranging from approximately Elevation 1050 to 1053. The sheets will be 28 feet long with tip elevations ranging from approximately 1022 to 1025. Place gravel backfill behind the wall with geotextile and install weep holes. Place and compact additional backfill behind the gravel up to proposed pavement or topsoil subgrade elevation. Excavate the area proposed to be paved to subgrade elevation and prepare subgrade. Place proposed pavement section in area proposed to be paved. Place topsoil in areas to be vegetated, and seed and mulch. Install guide rail, wall cap, and handrail. Construction work will occur in close to the campground access road. Excavation and repair implementation will be required to be minimal intrusion to the campground facility and access road and at the approval of Government.
SITE VISIT DOCUMENTS
AMENDMENT 0001 *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W911WN22B8009' to obtain more details.*
Bid Opening Held - Bid Results Posted.
Update #3 ·
Tionesta Lake Outflow Left Bank Long-Term Repair - The U.S. Army Corps of Engineers, Pittsburgh District, has a project to implement long term repairs at the left bank at Tionesta Lake, Forest County, PA. The purpose of the long-term repair is to provide erosion protection and support of the campground access road. The failure negatively impacts the District?s ability to respond to a dam safety emergency and conduct dam safety inspections. The repair will reduce future erosion which in turn will prevent more significant repairs. The major features of the requirements are identified below: The contract specifically includes: Install all Erosion and Sedimentation controls in accordance with the Contract Documents. Install a sheet pile wall along the top of bank with top of wall ranging from approximately Elevation 1050 to 1053. The sheets will be 28 feet long with tip elevations ranging from approximately 1022 to 1025. Place gravel backfill behind the wall with geotextile and install weep holes. Place and compact additional backfill behind the gravel up to proposed pavement or topsoil subgrade elevation. Excavate the area proposed to be paved to subgrade elevation and prepare subgrade. Place proposed pavement section in area proposed to be paved. Place topsoil in areas to be vegetated, and seed and mulch. Install guide rail, wall cap, and handrail. Construction work will occur in close to the campground access road. Excavation and repair implementation will be required to be minimal intrusion to the campground facility and access road and at the approval of Government.
SITE VISIT DOCUMENTS
AMENDMENT 0001 *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W911WN22B8009' to obtain more details.*
Update #2 ·
Tionesta Lake Outflow Left Bank Long-Term Repair - The U.S. Army Corps of Engineers, Pittsburgh District, has a project to implement long term repairs at the left bank at Tionesta Lake, Forest County, PA. The purpose of the long-term repair is to provide erosion protection and support of the campground access road. The failure negatively impacts the District?s ability to respond to a dam safety emergency and conduct dam safety inspections. The repair will reduce future erosion which in turn will prevent more significant repairs. The major features of the requirements are identified below: The contract specifically includes: Install all Erosion and Sedimentation controls in accordance with the Contract Documents. Install a sheet pile wall along the top of bank with top of wall ranging from approximately Elevation 1050 to 1053. The sheets will be 28 feet long with tip elevations ranging from approximately 1022 to 1025. Place gravel backfill behind the wall with geotextile and install weep holes. Place and compact additional backfill behind the gravel up to proposed pavement or topsoil subgrade elevation. Excavate the area proposed to be paved to subgrade elevation and prepare subgrade. Place proposed pavement section in area proposed to be paved. Place topsoil in areas to be vegetated, and seed and mulch. Install guide rail, wall cap, and handrail. Construction work will occur in close to the campground access road. Excavation and repair implementation will be required to be minimal intrusion to the campground facility and access road and at the approval of Government. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W911WN22B8009' to obtain more details.*
SITE VISIT DOCUMENTS
Update #1 ·
Tionesta Lake Outflow Left Bank Long-Term Repair - The U.S. Army Corps of Engineers, Pittsburgh District, has a project to implement long term repairs at the left bank at Tionesta Lake, Forest County, PA. The purpose of the long-term repair is to provide erosion protection and support of the campground access road. The failure negatively impacts the District?s ability to respond to a dam safety emergency and conduct dam safety inspections. The repair will reduce future erosion which in turn will prevent more significant repairs. The major features of the requirements are identified below: The contract specifically includes: Install all Erosion and Sedimentation controls in accordance with the Contract Documents. Install a sheet pile wall along the top of bank with top of wall ranging from approximately Elevation 1050 to 1053. The sheets will be 28 feet long with tip elevations ranging from approximately 1022 to 1025. Place gravel backfill behind the wall with geotextile and install weep holes. Place and compact additional backfill behind the gravel up to proposed pavement or topsoil subgrade elevation. Excavate the area proposed to be paved to subgrade elevation and prepare subgrade. Place proposed pavement section in area proposed to be paved. Place topsoil in areas to be vegetated, and seed and mulch. Install guide rail, wall cap, and handrail. Construction work will occur in close to the campground access road. Excavation and repair implementation will be required to be minimal intrusion to the campground facility and access road and at the approval of Government. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W911WN22B8009' to obtain more details.*
Files
Show all 11
Notice history
| Notice | Type | Posted |
|---|---|---|
| Outflow Left Bank Long-Term Repair Tionesta Lake | Award Notice | |
| This notice | Solicitation | |
| Outflow Left Bank Long-Term Repair Tionesta Lake | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Canonsburg-Houston, Pennsylvania, Local Protection Project (LPP) PL84-99 Rehabilitation | ENDIST Pittsburgh | Total Small Business | |
| Pittsburgh facility 079 MEP parking lot erosion control | ENDIST Philadelphia | No set-aside | |
| FY27 Euclid Creek Fishway Construction | ENDIST Buffalo | Total Small Business | |
| JP Murtha Float Mooring Bitts Retrofit | ENDIST Pittsburgh | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity