Ouachita Parish, Ouachita River Basin, 2020 PL 84-99 Ouachita River Levee Bank Stabilization, Emergency Bank Stabilization Sites 2, 11, 12, 16, & 22
Closed Special Notice Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- W912EE25B0002
- Agency
-
ENDIST Vicksburg
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Place of performance
- Vicksburg, Mississippi 39183, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers Vicksburg District has published a Special Notice regarding the consolidation of contract requirements for the Ouachita River Levee Bank Stabilization project in Ouachita Parish, Louisiana. This notice is published in accordance with FAR 7.107-5(c), which requires agencies to notify the public when they determine that consolidation of contract requirements is necessary and justified. The project involves emergency bank stabilization work at five sites (Sites 2, 11, 12, 16, and 22) along the Ouachita River in Northeast Louisiana, south of Monroe. The work includes constructing longitudinal peaked stone toe dikes with stone tiebacks and stone fill revetment, encompassing mobilization, clearing and grubbing, excavation, and backfill operations. The project is set aside as a Total Small Business procurement with an estimated value between $25 million and $100 million.
The primary purpose of this Special Notice is to inform the public of the agency's determination that consolidating these five separate bank stabilization sites into a single contract is necessary and justified, as documented in the attached Consolidation Determination and Finding. The notice was posted on July 3, 2025, with a due date of July 10, 2025, and no solicitation may be publicized until at least seven days after this consolidation notice publication. Only small businesses are eligible to participate in this Total Small Business set-aside procurement under NAICS code 237990 (Other Heavy and Civil Engineering Construction). The consolidation is expected to provide benefits including reduced acquisition cycle times, cost efficiencies, improved quality, and a more organized regional approach to meeting the USACE Flood Control and Channel Improvement Program's bank stabilization needs. Market research has identified multiple small businesses capable of performing the work, with the procurement strategy designed to maximize small business participation and increase mission success likelihood.
Notice text
W912EE - Ouachita Parish, Ouachita River Basin, 2020 PL 84-99 Ouachita River Levee Bank Stabilization, Emergency Bank Stabilization Sites 2, 11, 12, 16, & 22
The Consolidation Determination and Finding (attached) is posted in accordance with FAR 7.107-5(c):
"(c) Notification to the public of consolidation of contract requirements. The SPE or CAO shall publish in the GPE—
(1) A notice that the agency has determined a consolidation of contract requirements is necessary and justified (see 7.107-2) no later than 7 days after making the determination; the solicitation may not be publicized prior to 7 days after publication of the notice of the agency determination; and
(2) The determination that consolidation is necessary and justified with the publication of the solicitation. See 7.107-2 for the required content of the determination."
The work consists of furnishing all necessary plant, labor, materials, and equipment, and performing all work constructing longitudinal peaked stone toe dikes (LPSTDs) with stone tiebacks and stone fill revetment at five sites along the Ouachita River in Northeast Louisiana, south of Monroe, Louisiana. Principal features of the work include mobilization and demobilization, clearing and grubbing, and bank stabilization work consisting of tiebacks, excavation, and backfill.
Pursuant to Defense Federal Acquisition Regulation Supplement (DFARS) 236.204(ii), the magnitude of the proposed construction project is between $25,000,000.00 and $100,000,000.00.
Files
| File | Type | Posted |
|---|---|---|
| B.04._Redacted.Consolidation.DF.25B0002.ORL.Bank.Stab.pdf |
Notice history
Similar open opportunities
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity