Definitive Contract W912EE25C0004
- Not listed
- This is a $32,705,068.00 firm fixed-price contract awarded by the U.S. Army Corps of Engineers to Tktmj, Inc., a certified HUBZone small business, for longitudinal stone fill revetment, tieback, excavation, backfill, and stormwater pollution prevention services along the Ouachita River in Louisiana. The contract stems from a pre-solicitation notice seeking proposals for emergency bank stabilization work at six sites on the Ouachita River. The project will involve constructing longitudinal...
- This is a $2,166,786.00 firm fixed-price definitive contract awarded by the U.S. Army Corps of Engineers (USACE) to Tktmj, Inc., a certified HUBZone small business, for construction services related to the J. Bennett Johnston Waterway in Alexandria, Louisiana. The contract involves furnishing all necessary plant, labor, materials, and equipment to perform bank stabilization work, including constructing a longitudinal peaked stone toe dike and capping out the Opposite Alexandria Front revetment...
- This is a $2,215,369.10 firm fixed-price contract awarded by the U.S. Army Corps of Engineers to Tktmj, Inc., a certified HUBZone small business, for levee embankment construction services at Site 6 along the Ouachita River in Vicksburg, Mississippi. The contract has a completion date of September 30, 2030 and was set aside for small businesses. The original solicitation, issued as a pre-solicitation notice, sought bids for clearing, excavation, levee embankment, stone surfacing, and...
- The U.S. Army Corps of Engineers awarded a $34,231,352.40 firm fixed price contract to Luhr Bros., Inc. for the Monroe Bank Stabilization project. The contract is a definitive contract with no set-aside designation. Luhr Bros. is a for-profit organization that provides marine construction services such as rock and stone placement, bank stabilization, and dredging. The contract supports the Army Corps' civil works mission involving flood control and environmental restoration along the Ouachita...
- The U.S. Army Corps of Engineers, Vicksburg District, awarded a $19,471,627.50 Firm Fixed Price construction contract to Tktmj, Inc., a certified HUBZone small business, for the regrading of the Paradise Lake Closure on the Mississippi River. The work includes excavation, grading, and the furnishing and placement of graded stone. This contract was set aside for total small business participation under NAICS code 237990. Tktmj, Inc. is a specialized provider of federal water infrastructure and...
- This is a firm-fixed-price definitive contract awarded by the U.S. Army Corps of Engineers (USACE), a defense agency, to Dirtworks, Inc. of Vicksburg, a self-certified small disadvantaged business. The contract, valued at $3,610,802.44, is for the B4L1440 422R Levee Embankment, Semicompacted project located in Monroe, Louisiana. The contract has a total small business set-aside designation and a performance period ending on September 30, 2022. This contract award is not associated with a...
- The U.S. Army Corps of Engineers awarded a $7,249,237.34 definitive, firm-fixed price contract to Riverside Construction Co., Inc., a small business subchapter S corporation, for the Ouachita River Levee and Channel Repairs PL 84 99 project. The contract involves furnishing equipment, labor, and materials to perform clearing, excavation, stone dike construction, levee embankment, and turf establishment activities for bank stabilization and levee setback work along the Ouachita River in...
- The U.S. Army Corps of Engineers Vicksburg District awarded a $2,475,000.00 firm fixed-price contract to Testament, L.L.C. for emergency bank stabilization work along the Red River in Shreveport, Caddo Parish, Louisiana. The contract includes demolition of existing timber pile dikes, installation of a longitudinal stone dike using R200 stone, and stone bank paving. This contract was procured as a total small business set-aside under North American Industry Classification System (NAICS) code...
- This is a firm fixed-price delivery order contract awarded by the U.S. Army Corps of Engineers (USACE) to Pontchartrain Partners, LLC, a minority-owned, service-disabled veteran-owned small business. The contract, valued at $4,724,800.51, is for bank stabilization work on a new training structure, to be completed within 120 days of the notice to proceed. This order is part of a larger $98 million multiple-award indefinite delivery/indefinite quantity (IDIQ) contract that Pontchartrain Partners...
- The Department of the Army Corps of Engineers issued Task Order No. 4 against an unidentified contract vehicle to Pine Bluff Sand And Gravel Company, doing business as River Mountain Quarries, for $2,508,410. The firm fixed-price task order is for upper bank paving erosion repairs at Bayou Boeuf Lock, Berwick Lock, and Wax Lake East, as well as hard point construction at Atchafalaya Station hard points. Work will be performed in New Orleans, Louisiana through April 9, 2022. No set aside...
The U.S. Army Corps of Engineers (USACE) awarded a $26.3 million firm fixed-price definitive contract to Tktmj, Inc., a certified HUBZone small business, for emergency bank stabilization work on the Ouachita River in Ouachita Parish, Louisiana. The contract was awarded on August 27, 2025, with an ultimate completion date of August 26, 2028, and is designated as a Total Small Business set-aside. The work encompasses stabilization activities at five sites (Sites 2, 11, 12, 16, and 22) near Monroe, Louisiana, and represents critical flood risk management infrastructure under the Public Law 84-99 authority, which authorizes the federal government to provide emergency assistance for flood and storm damage repairs. The project scope involves constructing longitudinal peaked stone toe dikes, stone tiebacks, and stone fill revetments to stabilize riverbanks, requiring the placement of approximately 500,000 tons of graded stone across the multiple sites. Tktmj, Inc., which has demonstrated significant expertise in water infrastructure and river management through prior substantial contract awards from USACE, is required to mobilize within 10 calendar days of notice to proceed and complete the phased work sequentially across the designated sites. The contractor must maintain 100% performance and payment bonds and demonstrate sufficient floating plant and equipment capabilities to meet aggressive stone placement production schedules throughout the project execution period.
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| Not listed | Not listed | $26.3m | 8/27/25 |