Orangefield Elementary Temporary Classrooms

Awarded Award Notice Posted

Solicitation number
W9126G18Q0007
Agency
ENDIST Fort Worth US Army Corps of Engineers, Department of Defense
Awarded
to Southstar Financial, LLC
Set-aside
No set-aside

Opportunity facts

Contract number
W9126G18P0012 Federal contract award
NAICS code
321991 Manufactured Home (Mobile Home) Manufacturing
PSC
Not on record

Notice details come from SAM.gov. Updated .

Notice text

5 versions

Update #5 · Latest ·

Added: Nov 10, 2017 7:21 pm Modified: Nov 20, 2017 6:12 pmTrack Changes The project's scope of work is as follows:

The contractor shall provide and install sixteen(16) classrooms, one (1) acting classroom, one (1) office building, and one (1) restroom structure. Units shall be connected to the water/sewer services at the locations indicated on the drawings and make all required connections to the structure(s).


 


The contractor will tie into the overhead electrical service at the location specified and install ground based transformers to power each of the classroom/restroom groups in accordance with local and state codes.



All structures shall be double blocked and installed in accordance with the manufacturer's recommendations and Federal, State, and local codes. Structures shall be installed at a height so as to clear the existing light pole foundations. Poles may be removed from foundations to ease installation. Raised walkways shall be installed connecting all the structures in each group. The walkway shall have ADA compliant ramps and stairs on side of the group. Raised coverings shall be installed over all walkways and one covered path shall be installed connecting each group to the main school building.


 


All of the classrooms and the office building will be purchased. The base lease period for the restroom structure will run for six (6) months from the install deadline (Jan 3 2018 - Jun 02 2018). There are six (6) one (1) month option periods.



The Corps has established a conceptual layout to fit the number of classrooms and restroom facilities required into the areas available. The contractor is allowed to propose an alternative layout to accommodate the schools needs as long as they're able to fit the classroom/restrooms in the area's defined on the drawing. See contract clause 52.212-2 for more information.

Update #4 ·

Added: Nov 10, 2017 7:21 pm Modified: Nov 17, 2017 9:07 pmTrack Changes The project's scope of work is as follows:

The contractor shall provide and install sixteen(16) classrooms, one (1) acting classroom, one (1) office building, and one (1) restroom structure. Units shall be connected to the water/sewer services at the locations indicated on the drawings and make all required connections to the structure(s).


 


The contractor will tie into the overhead electrical service at the location specified and install ground based transformers to power each of the classroom/restroom groups in accordance with local and state codes.



All structures shall be double blocked and installed in accordance with the manufacturer's recommendations and Federal, State, and local codes. Structures shall be installed at a height so as to clear the existing light pole foundations. Poles may be removed from foundations to ease installation. Raised walkways shall be installed connecting all the structures in each group. The walkway shall have ADA compliant ramps and stairs on side of the group. Raised coverings shall be installed over all walkways and one covered path shall be installed connecting each group to the main school building.


 


All of the classrooms and the office building will be purchased. The base lease period for the restroom structure will run for six (6) months from the install deadline (Jan 3 2018 - Jun 02 2018). There are six (6) one (1) month option periods.



The Corps has established a conceptual layout to fit the number of classrooms and restroom facilities required into the areas available. The contractor is allowed to propose an alternative layout to accommodate the schools needs as long as they're able to fit the classroom/restrooms in the area's defined on the drawing. See contract clause 52.212-2 for more information.

Update #3 ·

Added: Nov 10, 2017 7:21 pm Modified: Nov 11, 2017 9:12 amTrack Changes The project's scope of work is as follows:

The contractor shall provide and install sixteen(16) classrooms, one (1) acting classroom, one (1) office building, and one (1) restroom structure. Units shall be connected to the water/sewer services at the locations indicated on the drawings and make all required connections to the structure(s).


 


The contractor will tie into the overhead electrical service at the location specified and install ground based transformers to power each of the classroom/restroom groups in accordance with local and state codes.



All structures shall be double blocked and installed in accordance with the manufacturer's recommendations and Federal, State, and local codes. Structures shall be installed at a height so as to clear the existing light pole foundations. Poles may be removed from foundations to ease installation. Raised walkways shall be installed connecting all the structures in each group. The walkway shall have ADA compliant ramps and stairs on side of the group. Raised coverings shall be installed over all walkways and one covered path shall be installed connecting each group to the main school building.


 


All of the classrooms and the office building will be purchased. The base lease period for the restroom structure will run for six (6) months from the install deadline (Jan 3 2018 - Jun 02 2018). There are six (6) one (1) month option periods.



The Corps has established a conceptual layout to fit the number of classrooms and restroom facilities required into the areas available. The contractor is allowed to propose an alternative layout to accommodate the schools needs as long as they're able to fit the classroom/restrooms in the area's defined on the drawing. See contract clause 52.212-2 for more information.

Funds are not presently available for this acquisition. No contract award will be made until appropriated funds are made available."

Update #2 ·

Added: Nov 10, 2017 7:21 pm Modified: Nov 10, 2017 7:21 pmTrack Changes The project's scope of work is as follows:

The contractor shall provide and install sixteen(16) classrooms, one (1) acting classroom, one (1) office building, and one (1) restroom structure. Units shall be connected to the water/sewer services at the locations indicated on the drawings and make all required connections to the structure(s).


 


The contractor will tie into the overhead electrical service at the location specified and install ground based transformers to power each of the classroom/restroom groups in accordance with local and state codes.



All structures shall be double blocked and installed in accordance with the manufacturer's recommendations and Federal, State, and local codes. Structures shall be installed at a height so as to clear the existing light pole foundations. Poles may be removed from foundations to ease installation. Raised walkways shall be installed connecting all the structures in each group. The walkway shall have ADA compliant ramps and stairs on side of the group. Raised coverings shall be installed over all walkways and one covered path shall be installed connecting each group to the main school building.


 


All of the classrooms and the office building will be purchased. The base lease period for the restroom structure will run for six (6) months from the install deadline (Jan 3 2018 - Jun 02 2018). There are six (6) one (1) month option periods.



The Corps has established a conceptual layout to fit the number of classrooms and restroom facilities required into the areas available. The contractor is allowed to propose an alternative layout to accommodate the schools needs as long as they're able to fit the classroom/restrooms in the area's defined on the drawing. See contract clause 52.212-2 for more information.

Update #1 ·

Added: Nov 10, 2017 7:21 pm The project's scope of work is as follows:

The contractor shall provide and install sixteen(16) classrooms, one (1) acting classroom, one (1) office building, and one (1) restroom structure. Units shall be connected to the water/sewer services at the locations indicated on the drawings and make all required connections to the structure(s).


 


The contractor will tie into the overhead electrical service at the location specified and install ground based transformers to power each of the classroom/restroom groups in accordance with local and state codes.



All structures shall be double blocked and installed in accordance with the manufacturer's recommendations and Federal, State, and local codes. Structures shall be installed at a height so as to clear the existing light pole foundations. Poles may be removed from foundations to ease installation. Raised walkways shall be installed connecting all the structures in each group. The walkway shall have ADA compliant ramps and stairs on side of the group. Raised coverings shall be installed over all walkways and one covered path shall be installed connecting each group to the main school building.


 


All of the classrooms and the office building will be purchased. The base lease period for the restroom structure leases will run for six (6) months from the install deadline (Jan 3 2018 - Jun 02 2018). There are six (6) one (1) month option periods.



The Corps has established a conceptual layout to fit the number of classrooms and restroom facilities required into the areas available. The contractor is allowed to propose an alternative layout to accommodate the schools needs as long as they're able to fit the classroom/restrooms in the area's defined on the drawing. See contract clause 52.212-2 for more information.

Attachments

Files attached to this notice, newest first
File Type Posted
18Q00070003.pdf PDF
Orangefield-Civil.pdf PDF
18Q00070002.pdf PDF
ORANGEFIELD-ELEC.pdf PDF
18Q00070001.pdf PDF
ORNG_PLA.PDF PDF
W9126G18Q0007.pdf PDF
ORNG_PLANS_11X17.pdf PDF

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity