ONAN Generators A&E

Closed Pre-Solicitation Posted

Solicitation number
FTQW25-1405
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
541330 Engineering Services
Place of performance
Eielson AFB, Alaska 99702, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Air Force Pacific Air Forces is seeking Architect-Engineer (A-E) services to design the phased replacement of four aging 1.5-megawatt Onan generators at the Combined Heat and Power Plant (CH&PP) on Eielson Air Force Base in Alaska. The key objectives are to replace the generators with new 2.0 MW units, including associated controls, to ensure continuous and reliable power generation capabilities. The design must facilitate a phased implementation approach to align with available funding and operational requirements. The A-E services required include investigation, analysis, and developing preliminary and final design packages with 65%, 95%, and 100% design deliverables.

This is a competitive selection process for a Firm Fixed-Price contract under a Total Small Business set-aside with NAICS code 541330 (Engineering Services). Questions are due by May 28, 2024. The government has not provided any information about potential incumbents or current contractors, and has not specified an award value or budget range for this project.

Notice text

Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this pre-solicitation until funds are available. The Government reserves the right to cancel this notice, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.

This notice is a solicitation for Architect and Engineering services to be performed on Eielson AFB, Alaska. 

The Combined Heat and Power Plant (CH&PP) provides primary generation of electricity and steam heat capabilities on Eielson Air Force Base (AFB). The primary building (B6203) of the plant was originally built in 1953, has been increased in size and capacity multiple times to keep up with Eielson AFB’s growth and expansion over the decades.


The existing 1.5-megawatt (MW) generators, four each, are used to pick up the electrical load when boilers or turbine-generators are being repaired and maintained or during extremely cold weather. At 25-years old, the generators have required major repairs to keep operational, and they are at the end of their life cycle. Without them the CH&PP will, at times, not have enough capacity to handle Eielson’s peak electrical load, especially in the harsh winters, or be able to pick up the load during emergency outages of the turbine-generators and boilers.


The project involves the phased replacement of four Onan generators with new equipment, including associated controls, to ensure continuous and reliable power generation capabilities. The design must facilitate a phased implementation approach to align with available funding and operational requirements.

Files

Similar open opportunities

Opportunity Agency Set-aside Responses due
EIE490 Microreactor Synchronization, Eielson AFB, Alaska Eielson AFB, Alaska, United States · NAICS 237130 ENDIST Alaska No set-aside
Market Intelligence for EIE480 and EIE482 Eielson AFB, Alaska, United States ENDIST Alaska No set-aside
Market Intelligence for EIE483 and EIE484 Eielson AFB, Alaska 99702, United States · NAICS 236220 ENDIST Alaska No set-aside
FTG247 Replace UPS at IDT1, Fort Greely, Alaska Fort Greely, Alaska 99731, United States · NAICS 237130 ENDIST Alaska Total Small Business
Architect and Engineering Services Ohio 44473, United States · NAICS 541310 Reserve Command Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity