- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Norman, Oklahoma 73026, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This pre-solicitation notice seeks to rehabilitate and resurface approximately 0.91 miles of road segments and one parking area located in Lake Thunderbird State Park near Norman, Oklahoma. The work is being procured by the Department of Transportation Federal Highway Administration and includes full depth reclamation with cement, asphalt concrete pavement, concrete sidewalks, retaining walls, and other items. Firms must submit statements of intention, certifications, past experience, and bonding capacity by January 31, 2023 to be considered for the potential small business set aside. Construction is scheduled to take place between July and November 2023.
There is no set-aside designated currently. Interested parties must qualify as a Small Business Concern, HUBZone, Woman-Owned, 8(a), Veteran-Owned, or Service-Disabled Veteran-Owned small business. The estimated price range for Schedule A is $700,000 to $2,000,000 and $250,000 to $700,000 for Option X. Key work items include 1,200 linear feet of ditch excavation, 450 tons of roadway aggregate, 20,000 square yards of full depth reclamation with cement, and 4,000 tons of asphalt concrete pavement.
Notice text
THIS IS NOT A REQUEST FOR BID
PLANS AND SPECIFICATIONS ARE NOT AVAILABLE
THIS NOTICE IS BEING ISSUED TO DETERMINE IF THERE IS SUFFICIENT
INTEREST FROM QUALIFIED PRIME CONTRACTORS who are Small Business Concerns (SBCs), HUBZone small businesses, Woman Owned Small Businesses (WOSBs), 8(a) small businesses, Veteran Owned Small Businesses (VOSBs) or Service Disabled Veteran-Owned Small Businesses (SDVOSBs) and who intend to submit a bid for this solicitation to allow for a set-aside in one of these programs MUST submit the following by e-mail to CFLAcquisitions@dot.gov or by fax to 720-963-3360 (Attn: Eric Grosskreuz) for receipt by close of business (2 p.m. MDT) on January 31, 2023:
- A positive statement of your intention to submit a bid for this solicitation as a Prime Contractor;
- A copy of the letter from SBA stating date of HUBZone small business certification or acceptance to the 8(a)-small business program. In the case of a VOSB or SDVOSB, you must provide proof of eligibility (DD form 214 or a letter of adjudication from the Veterans Administration). This information must be provided in order to determine eligibility – DO NOT SEND COPIES OF YOUR SAM PROFILE;
- Letter from bonding agent stating your firm’s capability to bond for a single project of $3 million, and your firm’s aggregate bonding capacity; and
- Provide a list of road construction projects of equal or greater value in which you performed (as the prime contractor) highway construction work in environmentally sensitive National Park locations that included asphalt paving in high mountain terrain, construction of bridge structures and road reconstruction. State whether your firm was the prime contract or subcontractor on the project. PLEASE DO NOT SEND INFORMATION ON PROJECTS THAT DO NOT INCLUDE THE ABOVE WORK.
The size of a small business firm includes all parents, subsidiaries, affiliates, etc. Refer to the Code of Federal Regulations 13 CFR 121.103 for information on how the SBA determines affiliation and 13 CFR 121.108 regarding the penalties for misrepresentation of size status. All firms should be certified in the All firms should be certified in the System for Award Management (SAM) located at https://www.sam.gov/
A Qualified HUBZone small business receiving a HUBZone contract for general construction must spend at least 50% of the cost of the contract incurred for personnel on its own employees or employees of other qualified HUBZone SBCs. This requirement may be met by expending at least 50% of the cost of the contract incurred for personnel on its employees or it may subcontract at least 35% of the cost of the contract performance incurred for personnel to one or more qualified HUBZone SBCs. A qualified HUBZone SBC prime contractor may not, however, subcontract more than 50% of the cost of the contract incurred for personnel to non-qualified HUBZone SBCs.
PROJECT NUMBER: OK FLAP CLE 10(1)
PROJECT NAME: Lake Thunderbird Access
PROJECT DESCRIPTION: The Project is located in Lake Thunderbird State Park, near Norman, Oklahoma. This rehabilitation (3R) project consists full depth reclamation (FDR) and asphalt overlay of 0.91 miles of two road segments and one parking area. The terrain consists of rolling hills varying in elevations from 1086 feet to 1138 feet.
The Project consist of a base bid Schedule (A) and one Option (X):
- Schedule A: Main entrance (0.74 miles) and parking area/boat Ramp
- Option X: Area 2 Road (0.17 miles)
SCOPE OF THE WORK:
The project proposes to utilize FDR with minor widening to achieve a smooth, durable surface to accommodate the large volume of recreational traffic the facility serves. Also included will be repair of failing subgrade through subgrade stabilization at select locations, improving roadside parking and pull-outs, incorporating new signing and striping throughout, and updating facilities to meet American Disabilities Act (ADA) requirements.
All portions of the Project are considered 4(f) resources because they are within Lake Thunderbird State Park. Great attention to detail will be required in achieving customer satisfaction in areas of roadway and parking lot construction, traffic control, visitor relations and timely completion of work.
PRINCIPAL WORK ITEMS:
1,200 linear feet, ditch excavation
260 square feet, reinforced concrete retaining wall
450 tons of roadway aggregate
20,000 square yards of Full Depth Reclamation with Cement, 8-inches deep
4,000 tons of asphalt concrete pavement (PG 70-28 OK)
150 square yards concrete sidewalk
1,600 linear feet of concrete curb
ANTICIPATED SCHEDULE:
The anticipated schedule is:
- Advertisement: March 7, 2023
- Award: May 4, 2023
- Notice to Proceed: May 26, 2023
- Construction: July 5, 2023 through November 30, 2023
To avoid the Park’s busy season, no work will occur from Memorial Day to the end of the Independence Day holiday. Construction duration is estimated to be about two to four months.
ESTIMATED COST RANGE:
The estimated price range is:
- Schedule A, between $700,000 and $2,000,000.
- Option X, between $250,000 and $700,000.
Notice history
| Notice | Type | Posted |
|---|---|---|
| OK FLAP CLE 10(1), Lake Thunderbird Access | Solicitation | |
| OK FLAP CLE 10(1), Lake Thunderbird Access | Pre-Solicitation | |
| OK FLAP CLE 10(1), Lake Thunderbird Access | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity