Office Repairs for Hastings, MN
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W912ES26QA030
- Agency
-
ENDIST St Paul
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238310 Drywall and Insulation Contractors
- Place of performance
- Hastings, Minnesota 55033, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Army Corps of Engineers Engineering District St Paul is soliciting bids for office repair and restoration services at the Hastings Resident Office building located at Lock and Dam 2 in Hastings, Minnesota. The scope of work encompasses removal and replacement of materials damaged by a burst 3/4-inch copper water pipe, including wall base molding, drywall, insulation (foam, batt, R-13 and R-19 fiberglass), water vapor barrier, bathroom wall tiles, carpet, and ceiling tiles. Additional work includes repairing the burst water pipe, reconnecting plumbing fixtures and hot water heater, painting, remounting electrical conduit and fire alarm annunciators, testing fire alarm system functionality, remounting fire extinguishers, steam cleaning carpet, applying epoxy non-slip flooring in the server room, and conducting air sampling mold testing before and after repairs. All replaced materials must match existing undamaged materials or be approved by the Contracting Officer. Evaluation will be based on past performance (including CPARS data) and price. The proposal due date is March 19, 2026, with a mandatory site visit scheduled for March 12, 2026 at 10:00 a.m. central time.
This is a Total Small Business set-aside contract, meaning only small businesses as defined by the Small Business Administration are eligible to compete. No incumbent contractor or current contract information is identified in the solicitation documents. The specific contract award value is not disclosed in the available materials. Key scope modifications detailed in Amendment 0001 include increasing ceiling tile disposal from 20 to approximately 50 units, increasing installation of new ceiling tiles from 45 to approximately 70 units, and adding replacement of two indoor fire alarm horn strobes with System Sensor L-Series specifications. Prospective contractors must be registered in both SAM and PIEE, acknowledge all terms and conditions via completed SF 1442, and submit all pricing in whole penny amounts. Performance will take place at the Hastings Resident Office building located at 1350 Lock and Dam Road, Hastings, MN 55033.
Notice text
2 versions
Update #2 · Latest ·
Posted Amendment 0001, new site visit date 12 March 2026 (see attached for details)
The Hastings Resident Office building at Lock and Dam 2 in Hastings, MN experienced flood damage caused by a ? copper water pipe which froze and burst. The Contractor shall remove and replace all damaged material as indicated in paragraph 2.3. Damaged material includes, but is not limited to, 4? wall base molding, drywall, wall and above ceiling insulation (foam, batt, R-13 and R-19 fiberglass), water vapor barrier, bathroom wall tiles, stained carpet sections, ceiling tiles, and LED light panels. All replaced materials shall match existing material that was not damaged or otherwise approved by the Contracting Officer. Other work includes repairing the burst section of water pipe, reconnecting plumbing fixtures for the kitchenette to include hot water heater, painting new sheetrock as well as any damaged areas (walls, around floor molding, and along electrical conduit), remounting electrical conduit and fire alarm annunciators, testing the fire alarm system to validate functionality, remount fire extinguisher, steam cleaning the carpet, applying epoxy floor with non-slip grip in server room, and conducting air sampling mold testing before and after repairs.
Update #1 ·
The Hastings Resident Office building at Lock and Dam 2 in Hastings, MN experienced flood damage caused by a ? copper water pipe which froze and burst. The Contractor shall remove and replace all damaged material as indicated in paragraph 2.3. Damaged material includes, but is not limited to, 4? wall base molding, drywall, wall and above ceiling insulation (foam, batt, R-13 and R-19 fiberglass), water vapor barrier, bathroom wall tiles, stained carpet sections, ceiling tiles, and LED light panels. All replaced materials shall match existing material that was not damaged or otherwise approved by the Contracting Officer. Other work includes repairing the burst section of water pipe, reconnecting plumbing fixtures for the kitchenette to include hot water heater, painting new sheetrock as well as any damaged areas (walls, around floor molding, and along electrical conduit), remounting electrical conduit and fire alarm annunciators, testing the fire alarm system to validate functionality, remount fire extinguisher, steam cleaning the carpet, applying epoxy floor with non-slip grip in server room, and conducting air sampling mold testing before and after repairs.
Files
| File | Type | Posted |
|---|---|---|
| Amendment 0001 IMG_1725.JPG | JPG image | |
| Amendment 0001 Fire Alarm Horn Strobes.pdf | ||
| Amendment 0001 W912ES26QA0300001 SF 30.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Office Repairs for Hastings, MN | Award Notice | |
| This notice | Solicitation | |
| Office Repairs for Hastings, MN | Pre-Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity