NV FLAP 100(1), Sierra Vista Lane

Award Notice Posted

Solicitation number
DTFH6817B00028
Agency
Awarded
to A & K Earth Movers Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
6982AF18C000010 Federal contract award
PSC
Not on record
Place of performance
The project is located just outside of Carson City, Nevada 89701. The project elevation is approximately 4600 feet. Carson City, Nevada, United States

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·


The project will reconstruct a 2.5-mile portion of Sierra Vista Lane using full depth reclamation with an asphalt concrete pavement overlay.  Some earthwork is required in areas with drainage improvements.  In addition, two existing parking areas will be improved with gravel surfacing and wayfinding signs to improve recreational access for visitors to federal lands.  Signing along Sierra Vista Lane will be improved to meet current standards. The last major component to this project is efforts to stabilize the bank of Carson River with riprap slope protection where it is close to the road and showing signs of erosion and degradation.   


Schedule A: Approximate Quantities
Embankment Construction: 11,500 CUYD
Placed Riprap: 2,000 CUYD
Roadway Aggregate: 4,000 TON
Full Depth Reclamation: 2.5 MILE
Asphalt Concrete Pavement: 5,600 TON
Pipe Culverts ranging from 18 to 48-inch: 1,200 LNFT
Concrete Curb and Gutter: 3,700 LNFT


It is anticipated that the project will be advertised in November, 2017.  Construction is anticipated to occur from January, 2018 to May, 2018.  Estimated total cost is $1 million to $5 million.



Update #1 ·

THIS IS NOT A REQUEST FOR BID - PLANS AND SPECIFICATIONS ARE NOT AVAILABLE

The project will reconstruct a 2.5-mile portion of Sierra Vista Lane using full depth reclamation with an asphalt concrete pavement overlay.  Some earthwork is required in areas with drainage improvements.  In addition, two existing parking areas will be improved with gravel surfacing and wayfinding signs to improve recreational access for visitors to federal lands.  Signing along Sierra Vista Lane will be improved to meet current standards. The last major component to this project is efforts to stabilize the bank of Carson River with riprap slope protection where it is close to the road and showing signs of erosion and degradation.   


Schedule A: Approximate Quantities
Embankment Construction: 11,500 CUYD
Placed Riprap: 2,000 CUYD
Roadway Aggregate: 4,000 TON
Full Depth Reclamation: 2.5 MILE
Asphalt Concrete Pavement: 5,600 TON
Pipe Culverts ranging from 18 to 48-inch: 1,200 LNFT
Concrete Curb and Gutter: 3,700 LNFT


It is anticipated that the project will be advertised in November, 2017.  Construction is anticipated to occur from January, 2018 to May, 2018.  Estimated total cost is $1 million to $5 million.



Files

Show all 15

Notice history

Notice Type Posted
This notice Latest Award Notice
NV FLAP 100(1), Sierra Vista Lane Original Award Notice

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors