NRCS-WV Kanawha County EWP Streambank Stabilization Sharon Hollow and Ohley Hollow Road
Closed Solicitation Posted
- Solicitation number
- 12FPC326B0010
- Agency
-
Farm Production and Conservation
Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Place of performance
- West Virginia, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Agriculture, through the Natural Resources Conservation Service (NRCS), seeks construction services for streambank stabilization at two sites in Kanawha County, West Virginia—Sharon Hollow Road and Ohley Hollow Road—with bids due June 24, 2026, at 12:00 p.m. CST. This is a 100% total small business set-aside; bidders must be registered in SAM with active status and may not exceed $45.0 million in average annual revenue.
Place of performance is West Virginia. The project consists of channel clearing, erosion control installation, seeding and mulching, mobilization and demobilization, and excavation and earthwork at both sites. Sharon Hollow Road (Site 1) requires rock riprap stabilization across approximately 336 linear feet, with estimated quantities of 788 square yards of geotextile, 664 tons of riprap (D50 = 18 inches), and 28 cubic yards of grouted foundation preparation for shallow bedrock. Ohley Hollow Road (Site 2) requires 45 linear feet of gabion wall installation, with 44 cubic yards of gabions and 66 square yards of gabion geotextile; foundation riprap quantities and steel reinforcement (Item 3B) are conditional on bedrock encountered during excavation and will be determined by the NRCS representative in the field. The contractor must complete all work within 70 calendar days of Notice to Proceed, with maximum 10-hour days Monday through Saturday. Amendments dated June 15, 2026, updated Ohley Hollow Road drawings and specifications to reflect potential abandoned septic tank decommissioning, pet cemetery avoidance, temporary fencing requirements, modified seeding specifications, and concrete removal procedures for reused chain-link posts.
The estimated project value is between $125,000 and $175,000. NAICS code is 237990 (Other Heavy and Civil Engineering Construction); PSC code is Y1QA. A mandatory site visit is scheduled May 27, 2026, at 10:30 a.m. Eastern Time at coordinates 38.159194, -81.448000. Bidders must submit a bid bond equal to 20% of the bid price or $3 million, whichever is less, and the successful bidder must furnish a Performance Bond (SF-25A), Irrevocable Letter of Credit, or Tripartite Escrow Agreement equal to 100% of project cost within 10 calendar days of award. Award will be made to the responsible bidder offering the lowest price; the Government will evaluate bids on price alone and may reject materially unbalanced or unrealistically low bids. Davis-Bacon wage rates apply per Wage Determination WV20260069 (Kanawha County) and WV20250073 (Ohio County). Bids shall be submitted electronically to mark.domingo@usda.gov. Bid opening is scheduled June 24, 2026, at 2:30 p.m. Eastern Time via MS Teams conference.
Notice text
3 versions
Update #3 · Latest ·
See changes to Ohley Hollow Rd. Drawings and to Specification document - updated 6/15/2026.
Changes to the Ohley Hollow Road Drawings:
- Note showing the potential that an abandoned septic tank (unknown location) may be encountered and will need to be decommissioned if it is disturbed.
- Note showing the location of a pet cemetery and to avoid this location.
- Note showing a temporary fence must be constructed between the corner of the house and the fence along the road.
Changes to the specs:
Seeding Spec:
- Added a different seed mixture for the Ohley site.
- Added note showing the maximum rock size shall be ½” in top 1-1/2” where the special seedbed preparation is required.
- Added note specifying compacted and disturbed areas must be loosened and blended into adjacent area to remove depressions.
Mob Spec:
- Added procedure for decommissioning an abandoned septic tank if one is disturbed.
- Added requirement to remove concrete from chain link posts if they are going to be reused.
- Added requirement that temporary fence must be constructed at the Ohley site
Please see attachments and comibined synopsis solicitaiton for further deatails.
Kanawha County EWP 5091-001 Streambank Stabilization Sharon Hollow and Ohley Hollow Road for USDA NRCS-WV.
The project consists of clearing designated areas by the removal and disposal of trees, logs, stumps, shrubs, brush, and rubbish and the shaping of the channel.
Installing measures or performing work to control erosion and minimize the production of sediment and
other pollutants to water and air from construction activities.
Preparing the area for treatment; furnishing and placing seed, sprigs, mulch, fertilizer, inoculant, lime, and
other soil amendments; and anchoring mulch in designated areas as specified.
The work consists of the mobilization and demobilization of the contractor’s forces and equipment
necessary for performing the work required under the contract.
Establishing traffic control and maintaining safe, convenient use of public roads and right of way.
Removal of surface water and ground water as necessary to perform the construction required by the
contract in accordance with the specifications. It must include: (1) constructing, installing, building, and
maintaining all necessary temporary water containment facilities, channels, and diversions; (2) furnishing,
installing, and operating all necessary pumps, piping, and other facilities and equipment; and (3)
removing all such temporary works and equipment after their intended function is no longer required.
Excavation required by the drawings and specifications, as well as the disposal of the excavated materials.
Construction of earth embankments, other earthfills, and earth backfills required by the drawings and
specifications.
*See Specifications document attached to posting for full details of required work.
Update #2 ·
Please see attachments and comibined synopsis solicitaiton for further deatails.
Kanawha County EWP 5091-001 Streambank Stabilization Sharon Hollow and Ohley Hollow Road for USDA NRCS-WV.
The project consists of clearing designated areas by the removal and disposal of trees, logs, stumps, shrubs, brush, and rubbish and the shaping of the channel.
Installing measures or performing work to control erosion and minimize the production of sediment and
other pollutants to water and air from construction activities.
Preparing the area for treatment; furnishing and placing seed, sprigs, mulch, fertilizer, inoculant, lime, and
other soil amendments; and anchoring mulch in designated areas as specified.
The work consists of the mobilization and demobilization of the contractor’s forces and equipment
necessary for performing the work required under the contract.
Establishing traffic control and maintaining safe, convenient use of public roads and right of way.
Removal of surface water and ground water as necessary to perform the construction required by the
contract in accordance with the specifications. It must include: (1) constructing, installing, building, and
maintaining all necessary temporary water containment facilities, channels, and diversions; (2) furnishing,
installing, and operating all necessary pumps, piping, and other facilities and equipment; and (3)
removing all such temporary works and equipment after their intended function is no longer required.
Excavation required by the drawings and specifications, as well as the disposal of the excavated materials.
Construction of earth embankments, other earthfills, and earth backfills required by the drawings and
specifications.
*See Specifications document attached to posting for full details of required work.
Update #1 ·
Please see attachments and comibined synopsis solicitaiton for further deatails.
Ohio County EWP 5091-001 Streambank Stabilization Sharon Hollow and Ohley Hollow Road for USDA NRCS-WV.
The project consists of clearing designated areas by the removal and disposal of trees, logs, stumps, shrubs, brush, and rubbish and the shaping of the channel.
Installing measures or performing work to control erosion and minimize the production of sediment and
other pollutants to water and air from construction activities.
Preparing the area for treatment; furnishing and placing seed, sprigs, mulch, fertilizer, inoculant, lime, and
other soil amendments; and anchoring mulch in designated areas as specified.
The work consists of the mobilization and demobilization of the contractor’s forces and equipment
necessary for performing the work required under the contract.
Establishing traffic control and maintaining safe, convenient use of public roads and right of way.
Removal of surface water and ground water as necessary to perform the construction required by the
contract in accordance with the specifications. It must include: (1) constructing, installing, building, and
maintaining all necessary temporary water containment facilities, channels, and diversions; (2) furnishing,
installing, and operating all necessary pumps, piping, and other facilities and equipment; and (3)
removing all such temporary works and equipment after their intended function is no longer required.
Excavation required by the drawings and specifications, as well as the disposal of the excavated materials.
Construction of earth embankments, other earthfills, and earth backfills required by the drawings and
specifications.
*See Specifications document attached to posting for full details of required work.