This is a Design Document and Damage Survey Report for a 2025 Emergency Watershed Protection (EWP) streambank stabilization project prepared by the Natural Resources Conservation Service (NRCS) for a site located on Ohley Hollow Road in Kanawha County, West Virginia. The project involves constructing gabion wall streambank stabilization measures totaling 45 linear feet of gabion walls (15 feet of 4.5-foot high wall and 30 feet of 6-foot high wall) to address streambank erosion on an Unnamed Tributary No. 1 to Cabin Creek. The scope of work includes channel clearing and debris disposal, foundation preparation (conditional rebar reinforcement on shallow bedrock or rock riprap placement), gabion wall installation with specific lacing and construction requirements, earthfill placement, and channel bottom restoration to approximately 10 feet width with positive drainage configuration.

The estimated quantities include 44 cubic yards of gabions, 66 square yards of gabion geotextile, as needed earthfill, 23 square yards of shallow bedrock foundation preparation, 79 tons of rock riprap foundation preparation with 113 square yards of geotextile, and zero riprap tons (conditional). Construction specifications address site access restoration, fence removal and reinstallation, subsurface excavation and grading, pollution control measures, traffic control, waste disposal in approved landfills (contractor responsible for tipping fees), pipe extensions through structures, concrete encasement for pipes 12 inches or larger (2500 PSI minimum), and road maintenance during hauling operations. The NRCS representative retains authority to determine actual foundation preparation requirements in the field following excavation, with conditional foundation preparation quantities excluded from the variation in quantity clause. The project utilizes gabion baskets in 6-foot by 3-foot and 6-foot by 4.5-foot configurations with varying depths, requiring 13.5 gauge wire lacing using specific two-one-two looping procedures and interior counterfort support at designated locations.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Na tu ra l R es ou rc es

Co ns er va tio n

Se rv ice

U ni te d

St at es D ep ar tm en t of

Ag ric ul tu re

LOCATION MAP

E W

P

ST

R

EA

M

BA

N K

ST

AB

IL

IZ

AT

IO

N

KA

N

AW

H A

C O

U N

TY

, W

ES

T

VI

R

G

IN

IA

O

H

LE

Y H

O

LL

O W

R O

AD

SI

TE

C

O

VE

R S

H

EE

T

N . K

N O

X

/2

UTILITY NOTIFICATION

"THE NATURAL RESOURCES CONSERVATION SERVICE MAKES NO

REPRESENTATION AS TO THE EXISTENCE OR NON-EXISTENCE OF

ANY UTILITIES AT THE CONSTRUCTION SITE. SHOWN ON THESE

CONSTRUCTION DRAWINGS ARE THOSE UTILITIES WHICH HAVE

BEEN IDENTIFIED. IT IS THE RESPONSIBILITY OF THE

CONTRACTOR(S) TO ASSURE THEMSELVES THAT NO HAZARD

EXISTS OR DAMAGE WILL OCCUR TO UTILITIES."

COVER SHEET

QUANTITIES AND CONSTRUCTION NOTES

LOCATION MAP

SHEET LIST TABLE

SITE MAP

SHEET TITLE

PLAN VIEW

TYPICAL CHANNEL BOTTOM CONFIGURATION

TYPICAL FOUNDATION PREPARATION ON ROCK RIPRAP DETAILS

TYPICAL 4.5' HIGH GABION WALL SECTION & DETAILS

TYPICAL 4.5' HIGH GABION WALL DETAILS

TYPICAL FOUNDATION PREPARATION ON SHALLOW BEDROCK DETAILS

/2

/2

/2

A.

D

EI

C

H

ER

T

A.

D

EI

C

H

ER

T

J.

W

IC

KL

IN

E

KANAWHA COUNTY

TYPICAL 6' HIGH GABION WALL SECTION & DETAILS

TYPICAL 6' HIGH GABION WALL DETAILS

AutoCAD SHX Text Checked

AutoCAD SHX Text Approved

AutoCAD SHX Text Designed

AutoCAD SHX Text Drawn

AutoCAD SHX Text Sheet of

AutoCAD SHX Text Drawing Name

AutoCAD SHX Text File Name

AutoCAD SHX Text Date

AutoCAD SHX Text K E N T U C K Y

AutoCAD SHX Text O H I O

AutoCAD SHX Text V I R G I N I A

AutoCAD SHX Text P E N N S Y L V A N I A

AutoCAD SHX Text M A R Y

AutoCAD SHX Text L A N D

AutoCAD SHX Text

JOB APPROVAL

AutoCAD SHX Text

CLASS VI

AutoCAD SHX Text DRAWINGS PREPARED UNDER THE AUTHORITY OF THE EMERGENCY WATERSHED PROTECTION ACT by the NATURAL RESOURCES CONSERVATION SERVICE of the UNITED STATES DEPARTMENT OF AGRICULTURE STREAMBANK STABILIZATION OHLEY HOLLOW ROAD - SITE 2 DAMAGE SURVEY REPORT NO. 54-01-25-5091-001 KANAWHA COUNTY, WEST VIRGINIA ra l R es ou rc es

Co ns er va tio n

Se rv ice

U ni te d

St at es D ep ar tm en t of

Ag ric ul tu re N

. K N

O X

/2

* THE AREA REQUIRED FOR OVERLAP IS NOT

INCLUDED IN THE QUANTITY FOR GEOTEXTILE.

SITE 2 - TABLE OF ESTIMATED QUANTITIES

GABION

GEOTEXTILE

SY*

RIPRAP

TONS

GABIONS

CY

EARTH FILL

CY

FOUNDATION PREPARATION

SHALLOW BEDROCK

SY**

FOUNDATION PREPARATION

ROCK RIPRAP

TONS***

FOUNDATION PREPARATION

ROCK RIPRAP GEOTEXTILE

SY***

66 0 44 23 79 113AS NEEDED

** QUANTITIES ASSUMING BEDROCK

ENCOUNTERED FOR ENTIRE LENGTH.

*** QUANTITIES ASSUMING ROCK RIPAP

FOUNDATION FOR ENTIRE AREA.

E W

P

ST

R

EA

M

BA

N K

ST

AB

IL

IZ

AT

IO

N

KA

N

AW

H A

C O

U N

TY

, W

ES

T

VI

R

G

IN

IA

O

H

LE

Y H

O

LL

O W

R O

AD

SI

TE

Q

U

AN

TI

TI

ES

A

N D

C O

N

ST

R U

C

TI

O N

N O

TE

S

CONSTRUCTION NOTES

1. CALL 811 TO LOCATE PUBLIC UTILITIES PRIOR TO MOBILIZATION AND EXCAVATION. IT IS THE

RESPONSIBILITY OF THE CONTRACTOR(S) TO CONSULT WITH LOCAL LANDOWNERS TO

IDENTIFY UNMARKED PRIVATE UTILITIES PRIOR TO WORK BEGINNING. ANY DAMAGE DONE TO

UTILITIES AS A RESULT OF THE CONTRACTOR'S OPERATIONS SHALL BE REPAIRED AND

RESTORED.

2. ACCESS ROADS SHALL BE RESTORED TO PRE-CONSTRUCTION CONDITION OR BETTER.

3. ALL FENCES REMOVED AND/OR DAMAGED AS A RESULT OF THE CONTRACTOR'S OPERATIONS

SHALL BE RESTORED TO A CONDITION EQUAL TO OR BETTER THAN THEY EXISTED BEFORE

THE START OF WORK.

4. SOIL COMPACTED AS A RESULT OF CONSTRUCTION OPERATIONS SHALL BE LOOSENED FOR A

DEPTH OF 6-INCHES BELOW THE COMPACTED SOIL LAYER AND RE-GRADED TO BLEND WITH

EXISTING GROUND.

5. PROVIDE SUB-CHANNEL AS SHOWN ON TYPICAL CHANNEL BOTTOM CONFIGURATION

DRAWING.

6. WHILE WORKING IN THE STREAM ALL EFFORTS WILL BE MADE TO REDUCE DOWNSTREAM

IMPACTS INCLUDING KEEPING THE EXCAVATOR TRACKS ELEVATED ABOVE FLOWING WATER.

A DIVERSION BERM SHALL BE ESTABLISHED AT THE TOP OF EACH STREAM ACCESS POINT TO

MINIMIZE SURFACE WATER FROM FLOWING TOWARD THE STREAM.

7. REQUIRED POLLUTION CONTROL MEASURES SHALL BE INSTALLED AS NEEDED IN

ACCORDANCE WITH CONSTRUCTION SPECIFICATION 5, POLLUTION CONTROL.

8. SITE ACCESS SHALL BE OFF THE MAIN ROAD AND SHALL BE IN ACCORDANCE WITH ALL WEST

VIRGINIA DEPARTMENT OF TRANSPORTATION RULES AND GUIDELINES. THE CONTRACTOR

SHALL PROVIDE SIGNAGE AND FLAGMEN FOR TRAFFIC CONTROL AS REQUIRED. SEE

CONSTRUCTION SPECIFICATION 9, TRAFFIC CONTROL.

9. EXCESS MATERIAL FROM THE EXCAVATION & OBSTRUCTION REMOVAL SHALL BE WASTED

OFF-SITE IN ACCORDANCE WITH ALL LOCAL, STATE, & FEDERAL REGULATIONS AND AS

APPROVED BY THE NRCS REPRESENTATIVE IN THE FIELD. FLOODPLAINS WILL NOT BE

ALLOWED AS WASTE AREAS UNDER ANY CIRCUMSTANCES. WASTE AREAS SHALL BE SEEDED

ACCORDING TO CONSTRUCTION SPECIFICATION 6, SEEDING, SPRIGGING AND MULCHING.

10. THE CONTRACTOR SHALL PROVIDE APPROVED FILL AS REQUIRED TO COMPLETE THE WORK.

SEE CONSTRUCTION SPECIFICATION 23, EARTHFILL AND CONSTRUCTION SPECIFICATION 25

ROCKFILL FOR DETAILS.

11. TRASH, TIRES, & WOODY DEBRIS WITHIN THE WORK LIMITS SHALL BE DISPOSED OF OFF-SITE

IN AN APPROVED LANDFILL. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE LANDFILL

TIPPING FEES.

12. ALL PIPES ENCOUNTERED IN THE EMBANKMENT SHALL BE EXTENDED THROUGH THE ROCK

RIPRAP AND/OR GABIONS WITH THE SAME PIPE MATERIAL OR BETTER TO THE FACE OF THE

SLOPE OR BASKETS.

13. PIPES 12" DIAMETER AND LARGER SHALL BE ENCASED IN A MINIMUM OF 6" OF CONCRETE

WHEN PASSING THROUGH ROCK RIPRAP AND/OR GABIONS. CONCRETE SHALL HAVE A

MINIMUM COMPRESSIVE STRENGTH OF 2500 PSI.

14. THE CONTRACTOR SHALL MAINTAIN THE CLEANLINESS OF PUBLIC AND PRIVATE ROADS

IMPACTED BY HAULING OPERATIONS DURING THE DURATION OF THE WORK.

15. STARTING LOCATION OF THE STREAMBANK STABILIZATION MEASURE WILL BE MARKED IN THE

FIELD.

16. RESHAPE/TRANSITION THE STREAM'S BANK AT THE UPSTREAM AND DOWNSTREAM ENDS OF

STABILIZATION MEASURES AS DIRECTED BY NRCS REPRESENTATIVE.

17. AFTER THE FOUNDATION IS EXCAVATED, NRCS REPRESENTATIVE SHALL DETERMINE IF

CONDITIONAL FOUNDATION PREPARATION WILL BE REQUIRED AND WHICH TYPE WILL BE USED.

CONDITIONAL FOUNDATION PREPARATION QUANTITIES ARE NOT INCLUDED OR COVERED BY

THE VARIATION IN QUANTITY CLAUSE.

AutoCAD SHX Text Checked

AutoCAD SHX Text Approved

AutoCAD SHX Text Designed

AutoCAD SHX Text Drawn

AutoCAD SHX Text Sheet of

AutoCAD SHX Text Drawing Name

AutoCAD SHX Text File Name

Date ra l R es ou rc es

Co ns er va tio n

Se rv ice

U ni te d

St at es D ep ar tm en t of

Ag ric ul tu re

SITE 2

LAT: N38.105954

LONG: W81.440858

N . K

N O

X

/2

E W

P

ST

R

EA

M

BA

N K

ST

AB

IL

IZ

AT

IO

N

KA

N

AW

H A

C O

U N

TY

, W

ES

T

VI

R

G

IN

IA

O

H

LE

Y H

O

LL

O W

R O

AD

SI

TE

LO

C

AT

IO

N

M

AP

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Checked

AutoCAD SHX Text Approved

AutoCAD SHX Text Designed

AutoCAD SHX Text Drawn

AutoCAD SHX Text Sheet of

AutoCAD SHX Text Drawing Name

AutoCAD SHX Text File Name

GABION WALL STREAMBANK STABILIZATION.

SEE DETAILS, SHEETS 5 - 9.

TBM1

0.2 MILES TO CABIN CREEK ROAD

CONSTRUCTION LIMITS

C L

CL

CL

CL

CL

C L

E W

P

ST

R

EA

M

BA

N K

ST

AB

IL

IZ

AT

IO

N

KA

N

AW

H A

C O

U N

TY

, W

ES

T

VI

R

G

IN

IA

O

H

LE

Y H

O

LL

O W

R O

AD

SI

TE

SI

TE

M

AP

Na tu ra l R es ou rc es Co ns er va tio n Se rv ice

U ni te d

St at es D ep ar tm en t of

Ag ric ul tu re N

. K N

O X

/2

NAD83 WV STATE PLANE, SOUTH ZONE, US FOOT GRID. NAVD88 VERTICAL DATUM

ELEVATIONEASTINGNORTHINGDESCRIPTION

PROJECT CONTROL

TBM1 - WOOD HUB W/TACK 797.231841436.69403043.62

AutoCAD SHX Text Checked

AutoCAD SHX Text Approved

AutoCAD SHX Text Designed

AutoCAD SHX Text Drawn

AutoCAD SHX Text Sheet of

AutoCAD SHX Text Drawing Name

AutoCAD SHX Text File Name

AutoCAD SHX Text Date

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

2025 Maxar ©CNES (2025) Distribution Airbus DS © 2025 TomTom

X

X X

X X X X X X X

X X

GAS GAS GAS GAS GAS

RESIDENCE

GARAGE

SHED

CAR

PORT

TBM1

CL

C L

C L

CL

C L

CL

CL

CL

C L

CL

C L

C L

X X

X

RESTORE ORIGINAL STREAM

BOTTOM WIDTH APPROX 10'

EXISTING STUMP

TO BE REMOVED

EXISTING (3) 4" DIA

DRAIN PIPES.

REMOVE FENCE AS NEEDED.

RE-INSTALL AFTER WORK

HAS BEEN COMPLETED.

AC

C

ES

S

UPSTREAM - BEGIN GABION WALL

FOUNDATION AT ELEVATION 793.5

SEE TYPICAL 4.5' HIGH GABION

WALL DETAILS, SHEETS 6 & 7.

DOWNSTREAM - END GABION WALL

FOUNDATION AT ELEVATION 792.3

SEE TYPICAL 6' HIGH GABION WALL

DETAILS, SHEETS 8 & 9.

EXISTING SHED, DO NOT DISTURB.

CAR PORT REMOVED BY OTHERS.

OHLEY HOLLOW ROAD

UNNAMED TRIBUTARY NO. 1 TO CABIN CREEK

X

G

AS

EXISTING GATE

30' OF 6' HIGH

GABION WALL

15' OF 4.5' HIGH

GABION WALL

E W

P

ST

R

EA

M

BA

N K

ST

AB

IL

IZ

AT

IO

N

KA

N

AW

H A

C O

U N

TY

, W

ES

T

VI

R

G

IN

IA

O

H

LE

Y H

O

LL

O W

R O

AD

SI

TE

PL

AN

V

IE

W

Na tu ra l R es ou rc es

Co ns er va tio n

Se rv ice

U ni te d

St at es D ep ar tm en t of

Ag ric ul tu re N

.K N

O X

/2

LEGEND

TOP OF BANK

TOE OF SLOPE

EXISTING FENCEX

CONSTRUCTION LIMITSCL

CONTROL POINT

NOTES

1. CHANNEL CLEARING AND DEBRIS DISPOSAL SHALL BE DIRECTED BY

THE NRCS REPRESENTATIVE.

2. BORROW MATERIAL SHALL BE TAKEN FROM WITHIN THE

CONSTRUCTION LIMITS AS DIRECTED BY THE NRCS REPRESENTATIVE.

3. DISPOSAL AREA FOR EXCAVATED MATERIAL AND DEBRIS SHALL BE AT

AN APPROVED LOCATION OFFSITE.

4. GABION WALL ALIGNMENT, LAYOUT, LENGTH AND HEIGHT MAY VARY

AS DETERMINED BY THE NRCS REPRESENTATIVE.

5. FILL MATERIAL BEHIND GABIONS SHALL BE FROM CHANNEL SHAPING

AND/OR STOCKPILED MATERIAL AS DIRECTED BY THE NRCS

REPRESENTATIVE.

UTILITY POLE

TBM#

SEWER MAN HOLE

WATER METER

UNDERGROUND GAS LINEGAS

x x

AutoCAD SHX Text Checked

AutoCAD SHX Text Approved

AutoCAD SHX Text Designed

AutoCAD SHX Text Drawn

AutoCAD SHX Text Sheet of

AutoCAD SHX Text Drawing Name

AutoCAD SHX Text File Name

AutoCAD SHX Text Date

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

Leslie.Sears Line

Leslie.Sears Line

Leslie.Sears Callout Temporarily Configure Fence to Provide Enclosure for Landowners Dog. Chain Link Fence or Other Materials May be Used.

Leslie.Sears Callout Potential Abandoned Septic Tank. If Didsturbed, Decommission As Stated in Mobilization Specification

Leslie.Sears Callout Pet Cemetery Located Between Swing and Gargage. Do Not Disturb.

Leslie.Sears Oval

SECTION - 4.5' HIGH GABION WALL

2' MIN. EMBEDMENT OR TO BEDROCK. BEDROCK

ENCOUNTERED 0'- 2' BELOW CHANNEL BOTTOM,

SEE FOUNDATION PREPARATION SHALLOW

BEDROCK DETAIL, SHEET 10.

6'x 4.5'x 3'

2' MIN. 1' MIN.

LOWEST POINT

IN STREAM

EXCAVATION LIMITS

FILL PER NOTE 5, THIS SHEET.

EXCAVATION LIMITS

GEOTEXTILE

2.5'

EXISTING

GROUND

TYP.

1.5'

1 POSITIVE DRAINAGE

4.5' MIN.

NOTES

1. SEE TYPICAL CHANNEL BOTTOM CONFIGURATION SHEET 12.

2. REFER TO SHEET 2 FOR ESTIMATED QUANTITIES.

3. AFTER THE FOUNDATION IS EXCAVATED, NRCS

REPRESENTATIVE SHALL DETERMINE IF FOUNDATION

TREATMENT WILL BE REQUIRED AND TYPE. SEE

CONDITIONAL FOUNDATION DETAILS ON SHEETS 10 & 11.

4. THE CONTRACTOR SHALL ONLY EXCAVATE THE AMOUNT OF

FOUNDATION NEEDED TO INSTALL THE BOTTOM LAYER OF

GABION WALL INTENDED TO PLACE PER MANUFACTURER'S

RECOMMENDATIONS DURING THE SAME WORKDAY.

5. PLACE FILL BEHIND EACH LAYER OF GABIONS AS THE

LAYERS PROGRESS VERTICALLY. FILL MATERIAL SHALL BE

APPROVED AND BE FREE OF TRASH, CONCRETE, WOODY

DEBRIS, ETC. SEE CONSTRUCTION SPECIFICATION 23,

EARTHFILL AND CONSTRUCTION SPECIFICATION 25,

ROCKFILL FOR DETAILS.

6. THE CONTRACTOR SHALL CONSERVE SUITABLE MATERIALS

FOR FINAL GRADING AND SEEDING OPERATIONS.

1' (MIN.)

BACKFILL

OR FLATTER BASED

ON ACTUAL SITE

CONDITIONS

9.5

6°

FINAL GRADE. SEE TYPICAL

CHANNEL BOTTOM CONFIGURATION

ON SHEET 12.

EXISTING CHANNEL

BOTTOM

12' (MAX.) LEADING

EXCAVATION

SEE NOTE 4

BACKFILL AND NEXT LAYER

TRAILING COMPLETED

LOWER LAYER

WHEN MORE GABIONS ARE INTENDED,

LEAVE LAST GABION EMPTY TO

FACILITATE LACING THE NEXT AS

PLACEMENT PROGRESSES.

PROFILE - GABION

PLACEMENT/FILLING SEQUENCE

FOUNDATION GRADE

BOTTOM LAYER

9' (MIN.) COMPLETED LOWER LAYER IN

ADVANCE OF BACKFILL OF ADJACENT

GABIONS AND START OF NEXT LAYER

6'x 3'x 1.5'

UPSTREAM - BEGIN GABION WALL

FOUNDATION AT ELEVATION 793.5

SEE NOTE 4, SHEET 5.

Na tu ra l R es ou rc es

Co ns er va tio n

Se rv ice

U ni te d

St at es D ep ar tm en t of

Ag ric ul tu re N

. K N

O X

/2

NOT TO SCALE

E W

P

ST

R

EA

M

BA

N K

ST

AB

IL

IZ

AT

IO

N

KA

N

AW

H A

C O

U N

TY

, W

ES

T

VI

R

G

IN

IA

O

H

LE

Y H

O

LL

O W

R O

AD

SI

TE

TY

PI

C

AL

.5 ' H

IG

H

G

AB

IO

N

W

AL

L

SE

C

TI

O N

D

ET

AI

L

AutoCAD SHX Text Checked

AutoCAD SHX Text Approved

AutoCAD SHX Text Designed

AutoCAD SHX Text Drawn

AutoCAD SHX Text Sheet of

AutoCAD SHX Text Drawing Name

AutoCAD SHX Text File Name

CONSTRUCTION NOTES

1. EACH VERTICAL SEAM SHALL BE LACED PRIOR TO SETTING BASKET

IN PLACE AND PRIOR TO LACING TO ADJOINING BASKETS.

2. EACH BASKET SHALL BE LACED TO THE ADJOINING BASKET AT ALL

VERTICAL EDGES AND HORIZONTAL EDGES.

3. EACH DIAPHRAGM SHALL BE LACED TO THE LID OF THE BASKET

AFTER CLOSING. DIAPHRAGM SHALL BE LACED ALONG ALL SIDES.

4. ALL LACING SHALL BE DONE WITH 13.5 GAUGE WIRE USING THE TWO,

ONE, TWO, LOOPING PROCEDURE AS SHOWN IN THE LACING DETAILS.

5. ALL WIRE SHALL BE TIGHTLY LACED AND THE ENDS OF THE LACING

WIRE SHALL BE DOUBLED BACK AND TWISTED NOT LESS THAN THREE

TURNS AROUND ITSELF IN A LENGTH NOT GREATER THAN ONE INCH.

6. INSTALL ACCORDING TO MANUFACTURER'S RECOMMENDATIONS.

7. GABION BASKET LENGTH MAY VARY FROM TYPICAL LAYER DIAGRAM

WHERE APPLICABLE TO STAGGER SEAM WITH LAYER BELOW AS

APPROVED BY THE NRCS REPRESENTATIVE.

4.5' HIGH GABION WALL

WITH COUNTERFORT

1/3 H

1/3 H

1/3 H

1/3 L 1/3 L

1/3 L

INTERIOR SUPPORT DETAIL

5"5"

LACING DETAIL

1/3 L 1/3 L

1/3 L

LA

YE

R

LAYER 1

4.

5'

6'x 4.5'x 3'

6' x

3' x

1.

5'

LAYER 2 LAYER 1

FR

O

N T

FA

C

E

FR

O

N T

FA

C

E

6' x

3' x

1.

5'

4.5' 3'

10.5'

COUNTERFORT

LAYER DIAGRAM

INSTALL COUNTERFORT

AT BOTH ENDS OF

GABION WALL.6'

9'x 3'x 1.5'

6'x 3'x 1.5'

6'x 4.5'x 3'

6'x 4.5'x 3'

6'x 3'x 3'

WIRE DOUBLED BACK

AND TWISTED

6'x 4.5'x 3'

6'x 4.5'x 3' 6'x 3'x 1.5'

Na tu ra l R es ou rc es

Co ns er va tio n

Se rv ice

U ni te d

St at es D ep ar tm en t of

Ag ric ul tu re N

. K N

O X

/2

NOT TO SCALE

E W

P

ST

R

EA

M

BA

N K

ST

AB

IL

IZ

AT

IO

N

KA

N

AW

H A

C O

U N

TY

, W

ES

T

VI

R

G

IN

IA

O

H

LE

Y H

O

LL

O W

R O

AD

SI

TE

TY

PI

C

AL

.5 ' H

IG

H

G

AB

IO

N

W

AL

L D

ET

AI

LS

AutoCAD SHX Text Checked

AutoCAD SHX Text Approved

AutoCAD SHX Text Designed

AutoCAD SHX Text Drawn

AutoCAD SHX Text Sheet of

AutoCAD SHX Text Drawing Name

AutoCAD SHX Text File Name

SECTION - 6' HIGH GABION WALL

2' MIN. EMBEDMENT OR TO BEDROCK. BEDROCK

ENCOUNTERED 0'- 2' BELOW CHANNEL BOTTOM,

SEE FOUNDATION PREPARATION SHALLOW

BEDROCK DETAIL, SHEET 10.

6'x 4.5'x 3'

2' MIN. 1' MIN.

LOWEST POINT

IN STREAM

EXCAVATION LIMITS

FILL PER NOTE 5, THIS SHEET.

EXCAVATION LIMITS

GEOTEXTILE

4'

EXISTING

GROUND

TYP.

1.5'

1 POSITIVE DRAINAGE

4.5' MIN.

1' (MIN.)

BACKFILL

OR FLATTER BASED

ON ACTUAL SITE

CONDITIONS

9.5

6°

FINAL GRADE. SEE TYPICAL

CHANNEL BOTTOM CONFIGURATION

ON SHEET 12.

EXISTING CHANNEL

BOTTOM

12' (MAX.) LEADING

EXCAVATION

SEE NOTE 4

BACKFILL AND NEXT LAYER

TRAILING COMPLETED

LOWER LAYER

WHEN MORE GABIONS ARE INTENDED,

LEAVE LAST GABION EMPTY TO

FACILITATE LACING THE NEXT AS

PLACEMENT PROGRESSES.

PROFILE - GABION

PLACEMENT/FILLING SEQUENCE

FOUNDATION GRADE

BOTTOM LAYER

9' (MIN.) COMPLETED LOWER LAYER IN

ADVANCE OF BACKFILL OF ADJACENT

GABIONS AND START OF NEXT LAYER

6'x 3'x 3'

NOTES

1. SEE TYPICAL CHANNEL BOTTOM CONFIGURATION SHEET 12.

2. REFER TO SHEET 2 FOR ESTIMATED QUANTITIES.

3. AFTER THE FOUNDATION IS EXCAVATED, NRCS

REPRESENTATIVE SHALL DETERMINE IF FOUNDATION

TREATMENT WILL BE REQUIRED AND TYPE. SEE

CONDITIONAL FOUNDATION DETAILS ON SHEETS 10 & 11.

4. THE CONTRACTOR SHALL ONLY EXCAVATE THE AMOUNT OF

FOUNDATION NEEDED TO INSTALL THE BOTTOM LAYER OF

GABION WALL INTENDED TO PLACE PER MANUFACTURER'S

RECOMMENDATIONS DURING THE SAME WORKDAY.

5. PLACE FILL BEHIND EACH LAYER OF GABIONS AS THE

LAYERS PROGRESS VERTICALLY. FILL MATERIAL SHALL BE

APPROVED AND BE FREE OF TRASH, CONCRETE, WOODY

DEBRIS, ETC. SEE CONSTRUCTION SPECIFICATION 23,

EARTHFILL AND CONSTRUCTION SPECIFICATION 25,

ROCKFILL FOR DETAILS.

6. THE CONTRACTOR SHALL CONSERVE SUITABLE MATERIALS

FOR FINAL GRADING AND SEEDING OPERATIONS.

DOWNSTREAM - END GABION WALL

FOUNDATION AT ELEVATION 792.3

SEE NOTE 4, SHEET 5.

Na tu ra l R es ou rc es

Co ns er va tio n

Se rv ice

U ni te d

St at es D ep ar tm en t of

Ag ric ul tu re N

. K N

O X

/2

NOT TO SCALE

E W

P

ST

R

EA

M

BA

N K

ST

AB

IL

IZ

AT

IO

N

KA

N

AW

H A

C O

U N

TY

, W

ES

T

VI

R

G

IN

IA

O

H

LE

Y H

O

LL

O W

R O

AD

SI

TE

TY

PI

C

AL

' H

IG

H G

AB

IO

N W

AL

L

SE

C

TI

O

N

D

ET

AI

LS

AutoCAD SHX Text Checked

AutoCAD SHX Text Approved

AutoCAD SHX Text Designed

AutoCAD SHX Text Drawn

AutoCAD SHX Text Sheet of

AutoCAD SHX Text Drawing Name

AutoCAD SHX Text File Name

CONSTRUCTION NOTES

1. EACH VERTICAL SEAM SHALL BE LACED PRIOR TO SETTING BASKET

IN PLACE AND PRIOR TO LACING TO ADJOINING BASKETS.

2. EACH BASKET SHALL BE LACED TO THE ADJOINING BASKET AT ALL

VERTICAL EDGES AND HORIZONTAL EDGES.

3. EACH DIAPHRAGM SHALL BE LACED TO THE LID OF THE BASKET

AFTER CLOSING. DIAPHRAGM SHALL BE LACED ALONG ALL SIDES.

4. ALL LACING SHALL BE DONE WITH 13.5 GAUGE WIRE USING THE TWO,

ONE, TWO, LOOPING PROCEDURE AS SHOWN IN THE LACING DETAILS.

5. ALL WIRE SHALL BE TIGHTLY LACED AND THE ENDS OF THE LACING

WIRE SHALL BE DOUBLED BACK AND TWISTED NOT LESS THAN THREE

TURNS AROUND ITSELF IN A LENGTH NOT GREATER THAN ONE INCH.

6. INSTALL ACCORDING TO MANUFACTURER'S RECOMMENDATIONS.

7. GABION BASKET LENGTH MAY VARY FROM TYPICAL LAYER DIAGRAM

WHERE APPLICABLE TO STAGGER SEAM WITH LAYER BELOW AS

APPROVED BY THE NRCS REPRESENTATIVE.

6' HIGH GABION WALL

WITH COUNTERFORT

1/3 H

1/3 H

1/3 H

1/3 L 1/3 L

1/3 L

INTERIOR SUPPORT DETAIL

5"5"

LACING DETAIL

1/3 L 1/3 L

1/3 L

6'x 4.5'x 3'

6' x

3' x

3'

LAYER 2 LAYER 1

FR

O

N T

FA

C

E

FR

O

N T

FA

C

E

6' x

3' x

3'

4.5' 3'

LAYER DIAGRAM

INSTALL COUNTERFORT 6' FROM

DOWNSTREAM END OF GABION WALL.

6'x 4.5'x 3'

WIRE DOUBLED BACK

AND TWISTED

LA

YE

R

LA

YE

R

6'

6'

9'x 3'x 3'

6'x 3'x 3'

6'x 4.5'x 3'

6'x 4.5'x 3'

6'x 4.5'x 3'6'x 3'x 3'

1.5'

COUNTERFORT

6'

GABION WALLEND

6'x 3'x 3'

Na tu ra l R es ou rc es

Co ns er va tio n

Se rv ice

U ni te d

St at es D ep ar tm en t of

Ag ric ul tu re N

. K N

O X

/2

NOT TO SCALE

E W

P

ST

R

EA

M

BA

N K

ST

AB

IL

IZ

AT

IO

N

KA

N

AW

H A

C O

U N

TY

, W

ES

T

VI

R

G

IN

IA

O

H

LE

Y H

O

LL

O W

R O

AD

SI

TE

TY

PI

C

AL

' H

IG

H G

AB

IO

N W

AL

L

D

ET

AI

LS

AutoCAD SHX Text Checked

AutoCAD SHX Text Approved

AutoCAD SHX Text Designed

AutoCAD SHX Text Drawn

AutoCAD SHX Text Sheet of

AutoCAD SHX Text Drawing Name

AutoCAD SHX Text File Name

1.25'

(TYP.)

VARIES

VA

R

IE

S

1' MIN. TO 1.5' MAX.

0' TO 2' MAX.

CHANNEL BOTTOM

1.5'

2.5'

PROFILE - GABIONS WITH REBAR SPACING

BEDROCK

1.25' MAX.

(TYP.)

2.

5'

M

AX

(T

YP

1.25' (TYP.)

NO. 10 REBAR

(TYP.)

NO. 10 REBAR

(TYP.)

G

AB

IO

N

W

ID

TH

VARIES

FOUNDATION PREPARATION PAYMENT LIMITS

1' MIN. TO 1.5' MAX.

FO

U

N D

AT

IO

N

PR

EP

AR

AT

IO

N

PA

YM

EN

T

LI

M

IT

S

PLAN - GABIONS WITH REBAR/DRILLHOLE PATTERN

0' TO 2' MAX.

VA

R

IE

S

1.5'

2.5'

2.5' MAX.

(TYP.)1' MIN. TO 1.5' MAX.

FINAL GRADE

SECTION - GABIONS WITH REBAR SPACING

MAXIMUM ANGLE OF

REBAR/DRILLHOLE PATTERN

~1.5'

~2.5'

15° MAX.

VERTICAL NO. 10 REBAR

(TYP.)

MAX. TILT OF

REBAR/DRILLHOLE

FRONT OF

GABION

BACK OF

GABION

CHANNEL BOTTOM

BEDROCK

1' MAX.

BEDROCK

FOUNDATION PREPARATION SHALLOW BEDROCK

CONDITIONAL APPLICATION. THIS ITEM MAY OR MAY NOT BE USED.

SEE CONSTRUCTION NOTE 17, SHEET 2.

NOTES:

1. DRILL HOLES FOR REBAR SHALL BE 1 3/8" DIAMETER. THE USE OF EPOXY OR NON-SHRINK GROUT IS NOT REQUIRED. THE REBAR SHALL BE DRIVEN BY HAMMER TO THE REQUIRED DEPTH WITHOUT

BENDING.

2. CARE SHALL BE TAKEN BY THE CONTRACTOR TO PREVENT DAMAGE TO THE REBAR DURING

GABION FILLING OPERATIONS.

3. DIFFERENT GABION BOTTOM LAYER CONFIGURATIONS WILL REQUIRE ADDITIONAL REBAR BY

REPEATING THE PATTERN SHOWN. QUANTITIES ON SHEET 2 BASED ON BOTTOM WIDTH X

LENGTH.

4. FINAL PATTERN AND SPACING TO BE DIRECTED BY NRCS REPRESENTATIVE IN THE FIELD.

Na tu ra l R es ou rc es

Co ns er va tio n

Se rv ice

U ni te d

St at es D ep ar tm en t of

Ag ric ul tu re

E

W P

ST

R

EA

M

BA

N

K

ST

AB

IL

IZ

AT

IO

N

KA

N

AW

H

A C

O U

N

TY

, W

ES

T

VI

R G

IN

IA

O H

LE

Y

H O

LL

O

W R

O

AD

SI

TE

TY

PI

C

AL

F O

U N

D

AT

IO

N

P R

EP

AR

AT

IO

N O

N S

H

AL

LO

W

B

ED

R O

C K

D

ET

AI

L

N . K

N O

X

/2

NOT TO SCALE

AutoCAD SHX Text Checked

AutoCAD SHX Text Approved

AutoCAD SHX Text Designed

AutoCAD SHX Text Drawn

AutoCAD SHX Text Sheet of

AutoCAD SHX Text Drawing Name

AutoCAD SHX Text File Name

9.5

6°

FINAL

GRADE

EXCAVATION LIMITS. FILL AFTER

GABION INSTALLATION. SEE NOTE

10, SHEET 2.

POSITIVE DRAINAGE

SECTION - GABION WALL

1.5'

3' MIN.

VA

R

IE

S

FOUNDATION PREPARATION PAYMENT LIMITS

VARIES WITH GABION CONFIGURATION.

ASSUMED 10.5' FOR QUANTITIES ON SHEET 2.

NRCS REPRESENTATIVE WILL DETERMINE

DEPTH OF ROCK RIPRAP IN THE FIELD.

ASSUMED 3' FOR QUANTITIES ON SHEET 2.

GEOTEXTILE

0.6'

ROCK RIPRAP,

6"- 18" GRADATION.

OR FLATTER BASED ON

ACTUAL SITE CONDITIONS

2' MIN. BACKFILL

NRCS REPRESENTATIVE WILL DETERMINE

DISTANCE BASED ON ACTUAL SITE CONDITIONS

ASSUMED 3' FOR QUANTITIES ON SHEET 2.

FINAL GRADE. SEE TYPICAL CHANNEL

BOTTOM CONFIGURATION ON

SHEET 12.

FOUNDATION PREPARATION ROCK RIPRAP

CONDITIONAL APPLICATION. THIS ITEM MAY OR MAY NOT BE USED.

SEE CONSTRUCTION NOTE 17, SHEET 2.

FOUNDATION

LAYER

Na tu ra l R es ou rc es

Co ns er va tio n

Se rv ice

U ni te d

St at es D ep ar tm en t of

Ag ric ul tu re

E

W P

ST

R

EA

M

BA

N

K

ST

AB

IL

IZ

AT

IO

N

KA

N

AW

H

A C

O U

N

TY

, W

ES

T

VI

R G

IN

IA

O H

LE

Y

H O

LL

O

W R

O

AD

SI

TE

TY

PI

C

AL

F O

U N

D

AT

IO

N

P R

EP

AR

AT

IO

N O

N R

O C

K R

IP

R

AP

D

ET

AI

LS

N . K

N O

X

/2

NOT TO SCALE

AutoCAD SHX Text Checked

AutoCAD SHX Text Approved

AutoCAD SHX Text Designed

AutoCAD SHX Text Drawn

AutoCAD SHX Text Sheet of

AutoCAD SHX Text Drawing Name

AutoCAD SHX Text File Name

EXISTING

GROUND

FINAL CHANNEL BOTTOM SHALL

BE ROUGH & IRREGULAR.

PROVIDE POSITIVE DRAINAGE

TOWARD SUBCHANNEL.

~1

~1

1'

1/3 BW

SUBCHANNEL

BOTTOM WIDTH (BW)

SEE PLAN VIEW

~2

CHANNEL BOTTOM CONFIGURATION

STREAMBANK STABILIZATION

MEASURE, GABION WALL OR

ROCK RIPRAP SLOPE.

DEPOSITION REMOVAL

VARIES

NOTES:

1. FINAL LOCATION OF SUBCHANNEL TO BE LOCATED IN THE FIELD BY THE NRCS

REPRESENTATIVE. THE SUBCHANNEL SHALL BE TRANSITIONED AS NECESSARY TO

MEET EXISTING GRADES AT THE UPSTREAM AND DOWNSTREAM SITE EXTENTS.

2. SUBCHANNELS ARE NOT REQUIRED FOR BEDROCK STREAMBEDS.

3. USE MATERIAL FROM THE REQUIRED EXCAVATIONS AND/OR APPROVED FILL FROM

OFFSITE TO RECONSTRUCT STREAMBANKS AS NECESSARY. SEED AND MULCH PER

CONSTRUCTION SPECIFICATION 6, SEEDING, SPRIGGING AND MULCHING.

Na tu ra l R es ou rc es

Co ns er va tio n

Se rv ice

U ni te d

St at es D ep ar tm en t of

Ag ric ul tu re

E

W P

ST

R

EA

M

BA

N

K

ST

AB

IL

IZ

AT

IO

N

KA

N

AW

H

A C

O U

N

TY

, W

ES

T

VI

R G

IN

IA

O H

LE

Y

H O

LL

O

W R

O

AD

SI

TE

TY

PI

C

AL

C H

AN

N

EL

B

O

TT

O M

C O

N

FI

G U

R

AT

IO

N

N . K

N O

X

/2

NOT TO SCALE

AutoCAD SHX Text Checked

AutoCAD SHX Text Approved

AutoCAD SHX Text Designed

AutoCAD SHX Text Drawn

AutoCAD SHX Text Sheet of

AutoCAD SHX Text Drawing Name

AutoCAD SHX Text File Name

Sheets and Views
8.5x11 Cover
KC-OHR_2-Quantities&Notes.pdf
Sheets and Views
2-QuantitiesNotes
KC-OHR_3-LocationMap.pdf
Sheets and Views
8.5x11 Landscape
KC-OHR_4-SiteMap.pdf
Sheets and Views
8.5x11 Portrait
KC-OHR_5-PlanView.pdf
Sheets and Views
8.5x11 Portrait
KC-OHR_6-Typ4ftGabSec.pdf
Sheets and Views
6_4.5FT-SEC
KC-OHR_7-Typ4ftGabDetails.pdf
Sheets and Views
7_4.5FT-GABION DETAILS
KC-OHR_8-Typ6ftGabSec.pdf
Sheets and Views
8_6FT-SEC
KC-OHR_9-Typ6ftGabDetails.pdf
Sheets and Views
9_6FT-GABION DETAILS
KC-OHR_10-TypBedrock.pdf
Sheets and Views
12-TYP BEDROCK
KC-OHR_11-TypRiprap.pdf
Sheets and Views
13-RIPRAP FOUNDATION
KC-OHR_12-TypChanConf.pdf
Sheets and Views
14-TYP CHANNEL
KC-OHR_4-SiteMap.pdf
Sheets and Views
8.5x11 Portrait
KC-OHR_5-PlanView.pdf
Sheets and Views
8.5x11 Portrait
KC-OHR_1-Cover.pdf
Sheets and Views
8.5x11 Cover
KC-OHR_1-Cover.pdf
Sheets and Views
8.5x11 Cover

File details come from the government source that posted it. Updated .