Notice of intent to award modification for lincoln hall renovation, bldg. 607
Closed Special Notice Posted
Not the latest version. See the latest special notice from .
- Solicitation number
- W912DS24S0040
- Agency
-
ENDIST New York
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- West Point, New York, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This Special Notice is issued by the Department of the Army Corps of Engineers Engineering District New York. It announces the government's intent to modify the existing construction contract W912DS23C0025 for the Lincoln Hall Renovation project, Building 607, to include the installation of a cellular distributed antenna system, wireless access points, and outside plant fiber and telecommunication cables.
The purpose of this modification is to install these additional telecommunications systems during the ongoing Lincoln Hall renovation project to minimize impacts to operations at the United States Military Academy. The government intends to award these items of work as construction modifications to the existing Lincoln Hall renovation contract, as the current contractor is already familiar with the project and has the necessary resources and infrastructure in place. The total estimated cost for the additional work is $496,000. There is no set-aside for this modification, and the government has provided a deadline of April 27, 2024, for potential offerors to respond to this notice.
Notice text
2 versions
Update #2 · Latest ·
1. This notice of intent announcement is to:
A. Notify potential offerors of the Government’s intent to modify contract W912DS23C0025, Lincoln Hall Renovation, Bldg. 607, to include installation of the following items:
- Cellular Distributed Antenna System
- Wireless Access Points
- Outside Plant Fiber
B. Notify potential offerors of the Government’s intent to modify the construction contract as described below.
- Install cellular distributed antenna system (estimated cost = $325,000)
- Install wireless access point system (estimated cost = $41,000)
- Install outside plant fiber and telecommunication cables (estimated cost = $130,000)
The requirement is to award modifications to the construction contract to include all work associated with installation of the cellular distributed antenna system (cDAS), wireless access points (WAP), and outside plant fiber in support of the Lincoln Hall Renovation project.
The work associated with installation of the cDAS includes head-end equipment, cabling, devices, integration and testing as detailed in the telecommunication plans and specifications associated with the Lincoln Hall Renovation project through C-Squared per the approved sole source justification. The Lincoln Hall Renovation contract includes installation of pathways and conduit and will not be included in this modification.
The work associated with installation of the WAP system includes head-end equipment, cabling, devices, amplifiers as detailed in the telecommunication plans and specifications associated with the Lincoln Hall Renovation project. The Lincoln Hall Renovation contract includes installation of pathways and conduit and will not be included in this modification. Equipment that is existing to be relocated or new equipment will be provided by the Government and installed by the Lincoln Hall Renovation contractor.
The work associated with the installation of the outside plant fiber includes installing fiber in support of the Television Studio that will be located in Lincoln Hall from Building 600 as detailed in the telecommunication contract documents associated with the Lincoln Hall Renovation project. Other outside plant fiber work in support of Lincoln Hall includes extending from telecommunication installed during the Cullum Hall (Building 600) project as well as splicing existing lines and installing new exterior lines. This outside plant work is required during the demolition of the Lincoln Hall construction project to minimize impacts to service at adjacent buildings. Coordination is required with other Government agency for installation of new fiber prior to demolition of the existing fiber terminated within Lincoln Hall. The work includes verifying existing cable lengths and providing necessary equipment required to re-install or splice cables with connector modules to the proper terminations. Existing conduit will be inspected and if found to be in good condition, will be reused. There may be locations where conduit will need to be repaired or replaced as necessary.
This work was originally included in the Lincoln Hall Renovation solicitation and resulting contract as optional work, but the options were not exercised due to a lack of available funding at the time. Funding is now available to perform this work.
The Government intends to award these items of work as construction modifications to the contract W912DS23C0025 contractor. Installation of these systems is required during performance of the Lincoln Hall Renovation construction project to minimize impacts to operations at the United States Military Academy. Modifications to the existing Lincoln Hall contract are beneficial to the Government because the Lincoln Hall contractor is familiar with the Lincoln Hall Renovation contract. The Lincoln Hall construction contractor currently has supervisors and administrative staff onsite overseeing other contract work as well as dedicated laydown areas established within the work area. Awarding this work to a new contractor would be cost prohibitive to the Government because a separate contractor would be required to coordinate with an active construction project and within an active construction site, as well as provide additional overhead and storage/laydown.
Any vendor wishing to propose a capabilities statement must provide a copy of all relevant data demonstrating that they can satisfy the above requirements, by the required due date and time, to Adrian.J.Stafford-Browne@usace.army.mil.
This is not a request to respond to a solicitation.
Update #1 ·
1. This notice of intent announcement is to:
A. To notify potential Offerors of the Governments intent to modify contract W912DS23C0025, Lincoln Hall Renovation, Bldg. 607, to include installation of the following items:
- Cellular Distributed Antenna System
- Wireless Access Points
- Outside Plant Fiber
B. Notification of the Army’s intent to modify the construction contract as described below.
- Install cellular distributed antenna system (estimated cost = $325,000)
- Install wireless access point system (estimated cost = $41,000)
- Install outside plant fiber and telecommunication cables (estimated cost = $130,000)
The requirement is to award modifications to the construction contract to include all work associated with installation of the cellular distributed antenna system (cDAS), wireless access points (WAP) and outside plant fiber in support of the Lincoln Hall Renovation project.
The work associated with installation cDAS includes head-end equipment, cabling, devices, integration and testing as detailed in the telecommunication plans and specifications associated with the Lincoln Hall Renovation project through C-Squared per the approved sole source justification. The Lincoln Hall Renovation contract includes installation of pathways and conduit and will not be included in this modification.
The work associated with installation of the WAP system includes head-end equipment, cabling, devices, amplifiers as detailed in the telecommunication plans and specifications associated with the Lincoln Hall Renovation project. The Lincoln Hall Renovation contract includes installation of pathways and conduit and will not be included in this modification. Equipment that is existing to be relocated or new equipment will be provided by the government and installed by the contractor.
The work associated with the installation of the outside plant fiber includes installing fiber in support of the Television Studio that will be located in Lincoln Hall from building 600 as detailed in the telecommunication contract documents associated with the Lincoln Hall Renovation project. Other outside plant fiber work in support of Lincoln Hall includes extending from telecommunication installed during the Cullum Hall project as well as splicing existing lines and installing new exterior lines. This outside plant work is required during the demolition of the Lincoln Hall construction project to minimize impacts to service at adjacent buildings. Coordination is required with other government agency for installation of new fiber prior demo of the existing fiber terminated within Lincoln Hall. The work includes verifying existing cable lengths and provide necessary equipment required to re-install or splice cables with connector modules to the proper terminations. Existing conduit will be inspected and if found to be in good condition, will be reused. There may be locations where conduit will need to be repaired or replaced as necessary.
The Government intends to award these items of work as construction modifications to the contract W912DS23C0025 contractor. These systems are required during the Lincoln Hall renovation construction project to minimize impacts to operations at the United States Military Academy. Modifications to the existing Lincoln Hall contract is beneficial to the government because the Lincoln Hall contractor is familiar with the Lincoln Hall renovation contract. The Lincoln Hall construction contractor currently has supervisors and administrative staff onsite overseeing other contract work as well as a dedicated laydown areas established within the work area. Awarding this work to a new contractor would be cost prohibitive to the government because a separate contractor would be required to coordinate with an active construction project and within an active constriction site, as well as provide additional overhead and storage/laydown costs.
Notice history
| Notice | Type | Posted |
|---|---|---|
| Notice of Intent (NoI) for additional Wireless Access Points in Lincoln Hall | Special Notice | |
| Notice of intent to award modification for lincoln hall renovation, bldg. 607 | Special Notice | |
| Notice of intent to award modification for lincoln hall renovation, bldg. 607 | Special Notice | |
| This notice | Special Notice | |
| North Dock Repair Project at the West Point Army Garrison | Award Notice | |
| Lincoln hall renovation, bldg. 607 | Award Notice | |
| Notice of Intent to Sole Source a Brand Name, for construction of the IDT Shielded Auxiliary Power Generation Facility at Ft. Drum, NY | Pre-Solicitation | |
| Lincoln hall renovation, bldg. 607 | Solicitation | |
| Lincoln hall renovation, bldg. 607 | Solicitation | |
| Lincoln hall renovation, bldg. 607 | Pre-Solicitation | |
| Lincoln Hall Renovation, Bldg. 607 | Special Notice | |
| Repair Lincoln Hall, Bldg. 607 | Pre-Solicitation | |
| Fire Island Inlet to Montauk Point, Suffolk County, NY, Contract 2 Project | Award Notice |
Show all 13
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Notice of Intent to Receive Additional Contract Capacity for Contract No. W912DS25D0003 | ENDIST New York | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity