North breakwater repairs at redondo beach-king harbor
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W912PL25B0004
- Agency
-
ENDIST Los Angeles
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Place of performance
- Redondo Beach, Los Angeles County, California 90277
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers Los Angeles District is procuring repairs to the North Breakwater at King Harbor in Redondo Beach, California, through Invitation for Bid W912PL25B0004. The project involves repairs to a shore-connected, rubble-mound breakwater that protects the harbor from ocean waves, including resetting existing armor stone and furnishing and placing approximately 8,000 tons of new armor stone with a median size of 14 tons. Additional work includes repairs to an armor stone bench on the harborside at elevation +10.0 feet MLLW with an 8-foot width. This acquisition is being conducted as an unrestricted sealed bid under FAR Part 14, with bid submissions processed through the Procurement Integrated Enterprise Environment (PIEE) system. The bid opening occurred on August 8, 2025, with large businesses required to submit subcontracting plans if the award exceeds $1.5 million.
This procurement does not utilize any set-aside designations and is open to all qualified contractors. The contract was awarded to Connolly-Pacific Company from Long Beach, California, who submitted the sole bid of $6,830,360, which came in approximately $364,876 under the Independent Government Estimate of $7,195,236. The estimated contract value ranges between $5 million and $10 million, with a total performance duration of 210 calendar days. The work will be performed at King Harbor in Redondo Beach, Los Angeles County, California, and includes nine contract line items covering mobilization, breakwater repairs, concrete base replacement, and environmental surveying activities. The project scope encompasses quantities ranging from 700 to 5,900 tons of armor stone placement across various repair activities.
Notice text
8 versions
Update #8 · Latest ·
Update 0007 to transmit SF30 of Amendment 0004 for IFB W912PL25B0004, amendment does not extend the bid opening date of 8/8/2025. Update 0006 is to transmit the SF30 of Amendment 0003 for the IFB W912PL25B0004, this amendment does not extend the bid opening date. This is to revise Table of Contents, revise Section 35 31 23 Breakwaters, and replace plan sheets CN101, CN102, CN302, CN303 and CN304. Update 0005 is for information only, Amendment 0002 updated the bid opening date to 8 August 2025 and Update 0005 reflects this in the PIEE system. Amendment 0002 is also provided in Update 0005. Update 0004 is to transmit the SF30 of Amendment 0002 for the IFB W912PL25B0004. This is the extend the bid opening date, remove references of bid submission through DoD Safe, revise Table of Contents, revise Section 00 10 00 CLIN Schedule, revise Section 01 22 00 Price and Payment Procedures, revise Section 01 57 19 Temporary Environmental Controls, and revise Section 35 31 23 Breakwaters. Update 0003 is For Information Only, any official amendment will be accompanied by an SF30. This to transmit survey data for the IFB W912PL25B0004. Update 0002 is to transmit the SF-30 (3 pages) for Amendment 0001 of the IFB W912PL25B0004. This is to update the Bid Guarantee details. Update 0001 is to provide site visit information. The project will consist of repairs to a shore-connected, rubble-mound breakwater that provides protection from ocean waves to King Harbor in Redondo Beach, Los Angeles County, California. Repair work will consist of resetting of existing armor stone as needed and furnishing and placement of approximately 8,000 tons of new armor stone having a median stone size of 14-tons. There is an armor stone bench on the harborside of the structure that also requires repairs, the bench is at elevation +10.0 feet MLLW and has a width of 8.0 feet. The work will restore the structures to the design elevations and slopes in observed damage areas. The estimated magnitude of this project is: Between $5,000,000 and $10,000,000. The total contract duration is estimated at 210 calendar days. This acquisition will be issued as an Unrestricted Sealed Bid awarded under FAR Part 14 Sealed Bidding. The solicitation to be issued on or about 17 March 2025 with a tentative bid opening date of 17 April 2025. Sub-contracting plans are required for all construction contracts awarded to a large business when the award amount exceeds $1,500,000. If the offeror is a large business, the firm will be required to submit a subcontracting plan as part of its bid package. Plans and specifications will not be provided in hard paper copy. When the Solicitation is issued, it will be available through the Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE) suite at https://piee.eb.mil/For instructions on how to post an offer, please refer to the Posting Offer demo: https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf. Additional information is available via Web Based Training for the Solicitation Module at: https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/solicitation/proposals.xhtml The Government is not responsible for any loss of internet connectivity or for an offeror?s inability to access the documents posted at the referenced website. All offerors are advised that this project may be delayed, cancelled or revised at any time during the solicitation, selection, evaluation, negotiation and/or final award process. *PIEE Amendment 0001 is for administrative purposes only; this administrative Amendment is to increase the proposed solicitation issue date to on or about May 13, 2025, and response date to on or about June 17, 2025. Please be advised any official amendment issued will be accompanied by an SF-30. *PIEE Amendment 0002 is for administrative purposes only; this administrative Amendment is to increase the proposed solicitation issue date to on or about June 27, 2025, and response date to on or about July 29, 2025. Please be advised any official amendment issued will be accompanied by an SF-30.
Update #7 ·
Update 0007 to transmit SF30 of Amendment 0004 for IFB W912PL25B0004, amendment does not extend the bid opening date of 8/8/2025. Update 0006 is to transmit the SF30 of Amendment 0003 for the IFB W912PL25B0004, this amendment does not extend the bid opening date. This is to revise Table of Contents, revise Section 35 31 23 Breakwaters, and replace plan sheets CN101, CN102, CN302, CN303 and CN304. Update 0005 is for information only, Amendment 0002 updated the bid opening date to 8 August 2025 and Update 0005 reflects this in the PIEE system. Amendment 0002 is also provided in Update 0005. Update 0004 is to transmit the SF30 of Amendment 0002 for the IFB W912PL25B0004. This is the extend the bid opening date, remove references of bid submission through DoD Safe, revise Table of Contents, revise Section 00 10 00 CLIN Schedule, revise Section 01 22 00 Price and Payment Procedures, revise Section 01 57 19 Temporary Environmental Controls, and revise Section 35 31 23 Breakwaters. Update 0003 is For Information Only, any official amendment will be accompanied by an SF30. This to transmit survey data for the IFB W912PL25B0004. Update 0002 is to transmit the SF-30 (3 pages) for Amendment 0001 of the IFB W912PL25B0004. This is to update the Bid Guarantee details. Update 0001 is to provide site visit information. The project will consist of repairs to a shore-connected, rubble-mound breakwater that provides protection from ocean waves to King Harbor in Redondo Beach, Los Angeles County, California. Repair work will consist of resetting of existing armor stone as needed and furnishing and placement of approximately 8,000 tons of new armor stone having a median stone size of 14-tons. There is an armor stone bench on the harborside of the structure that also requires repairs, the bench is at elevation +10.0 feet MLLW and has a width of 8.0 feet. The work will restore the structures to the design elevations and slopes in observed damage areas. The estimated magnitude of this project is: Between $5,000,000 and $10,000,000. The total contract duration is estimated at 210 calendar days. This acquisition will be issued as an Unrestricted Sealed Bid awarded under FAR Part 14 Sealed Bidding. The solicitation to be issued on or about 17 March 2025 with a tentative bid opening date of 17 April 2025. Sub-contracting plans are required for all construction contracts awarded to a large business when the award amount exceeds $1,500,000. If the offeror is a large business, the firm will be required to submit a subcontracting plan as part of its bid package. Plans and specifications will not be provided in hard paper copy. When the Solicitation is issued, it will be available through the Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE) suite at https://piee.eb.mil/For instructions on how to post an offer, please refer to the Posting Offer demo: https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf. Additional information is available via Web Based Training for the Solicitation Module at: https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/solicitation/proposals.xhtml The Government is not responsible for any loss of internet connectivity or for an offeror?s inability to access the documents posted at the referenced website. All offerors are advised that this project may be delayed, cancelled or revised at any time during the solicitation, selection, evaluation, negotiation and/or final award process. *PIEE Amendment 0001 is for administrative purposes only; this administrative Amendment is to increase the proposed solicitation issue date to on or about May 13, 2025, and response date to on or about June 17, 2025. Please be advised any official amendment issued will be accompanied by an SF-30. *PIEE Amendment 0002 is for administrative purposes only; this administrative Amendment is to increase the proposed solicitation issue date to on or about June 27, 2025, and response date to on or about July 29, 2025. Please be advised any official amendment issued will be accompanied by an SF-30.
Update #6 ·
Update 0006 is to transmit the SF30 of Amendment 0003 for the IFB W912PL25B0004, this amendment does not extend the bid opening date. This is to revise Table of Contents, revise Section 35 31 23 Breakwaters, and replace plan sheets CN101, CN102, CN302, CN303 and CN304. Update 0005 is for information only, Amendment 0002 updated the bid opening date to 8 August 2025 and Update 0005 reflects this in the PIEE system. Amendment 0002 is also provided in Update 0005. Update 0004 is to transmit the SF30 of Amendment 0002 for the IFB W912PL25B0004. This is the extend the bid opening date, remove references of bid submission through DoD Safe, revise Table of Contents, revise Section 00 10 00 CLIN Schedule, revise Section 01 22 00 Price and Payment Procedures, revise Section 01 57 19 Temporary Environmental Controls, and revise Section 35 31 23 Breakwaters. Update 0003 is For Information Only, any official amendment will be accompanied by an SF30. This to transmit survey data for the IFB W912PL25B0004. Update 0002 is to transmit the SF-30 (3 pages) for Amendment 0001 of the IFB W912PL25B0004. This is to update the Bid Guarantee details. Update 0001 is to provide site visit information. The project will consist of repairs to a shore-connected, rubble-mound breakwater that provides protection from ocean waves to King Harbor in Redondo Beach, Los Angeles County, California. Repair work will consist of resetting of existing armor stone as needed and furnishing and placement of approximately 8,000 tons of new armor stone having a median stone size of 14-tons. There is an armor stone bench on the harborside of the structure that also requires repairs, the bench is at elevation +10.0 feet MLLW and has a width of 8.0 feet. The work will restore the structures to the design elevations and slopes in observed damage areas. The estimated magnitude of this project is: Between $5,000,000 and $10,000,000. The total contract duration is estimated at 210 calendar days. This acquisition will be issued as an Unrestricted Sealed Bid awarded under FAR Part 14 Sealed Bidding. The solicitation to be issued on or about 17 March 2025 with a tentative bid opening date of 17 April 2025. Sub-contracting plans are required for all construction contracts awarded to a large business when the award amount exceeds $1,500,000. If the offeror is a large business, the firm will be required to submit a subcontracting plan as part of its bid package. Plans and specifications will not be provided in hard paper copy. When the Solicitation is issued, it will be available through the Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE) suite at https://piee.eb.mil/For instructions on how to post an offer, please refer to the Posting Offer demo: https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf. Additional information is available via Web Based Training for the Solicitation Module at: https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/solicitation/proposals.xhtml The Government is not responsible for any loss of internet connectivity or for an offeror?s inability to access the documents posted at the referenced website. All offerors are advised that this project may be delayed, cancelled or revised at any time during the solicitation, selection, evaluation, negotiation and/or final award process. *PIEE Amendment 0001 is for administrative purposes only; this administrative Amendment is to increase the proposed solicitation issue date to on or about May 13, 2025, and response date to on or about June 17, 2025. Please be advised any official amendment issued will be accompanied by an SF-30. *PIEE Amendment 0002 is for administrative purposes only; this administrative Amendment is to increase the proposed solicitation issue date to on or about June 27, 2025, and response date to on or about July 29, 2025. Please be advised any official amendment issued will be accompanied by an SF-30.
Update #5 ·
Update 0005 is for information only, Amendment 0002 updated the bid opening date to 8 August 2025 and Update 0005 reflects this in the PIEE system. Amendment 0002 is also provided in Update 0005. Update 0004 is to transmit the SF30 of Amendment 0002 for the IFB W912PL25B0004. This is the extend the bid opening date, remove references of bid submission through DoD Safe, revise Table of Contents, revise Section 00 10 00 CLIN Schedule, revise Section 01 22 00 Price and Payment Procedures, revise Section 01 57 19 Temporary Environmental Controls, and revise Section 35 31 23 Breakwaters. Update 0003 is For Information Only, any official amendment will be accompanied by an SF30. This to transmit survey data for the IFB W912PL25B0004. Update 0002 is to transmit the SF-30 (3 pages) for Amendment 0001 of the IFB W912PL25B0004. This is to update the Bid Guarantee details. Update 0001 is to provide site visit information. The project will consist of repairs to a shore-connected, rubble-mound breakwater that provides protection from ocean waves to King Harbor in Redondo Beach, Los Angeles County, California. Repair work will consist of resetting of existing armor stone as needed and furnishing and placement of approximately 8,000 tons of new armor stone having a median stone size of 14-tons. There is an armor stone bench on the harborside of the structure that also requires repairs, the bench is at elevation +10.0 feet MLLW and has a width of 8.0 feet. The work will restore the structures to the design elevations and slopes in observed damage areas. The estimated magnitude of this project is: Between $5,000,000 and $10,000,000. The total contract duration is estimated at 210 calendar days. This acquisition will be issued as an Unrestricted Sealed Bid awarded under FAR Part 14 Sealed Bidding. The solicitation to be issued on or about 17 March 2025 with a tentative bid opening date of 17 April 2025. Sub-contracting plans are required for all construction contracts awarded to a large business when the award amount exceeds $1,500,000. If the offeror is a large business, the firm will be required to submit a subcontracting plan as part of its bid package. Plans and specifications will not be provided in hard paper copy. When the Solicitation is issued, it will be available through the Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE) suite at https://piee.eb.mil/For instructions on how to post an offer, please refer to the Posting Offer demo: https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf. Additional information is available via Web Based Training for the Solicitation Module at: https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/solicitation/proposals.xhtml The Government is not responsible for any loss of internet connectivity or for an offeror?s inability to access the documents posted at the referenced website. All offerors are advised that this project may be delayed, cancelled or revised at any time during the solicitation, selection, evaluation, negotiation and/or final award process. *PIEE Amendment 0001 is for administrative purposes only; this administrative Amendment is to increase the proposed solicitation issue date to on or about May 13, 2025, and response date to on or about June 17, 2025. Please be advised any official amendment issued will be accompanied by an SF-30. *PIEE Amendment 0002 is for administrative purposes only; this administrative Amendment is to increase the proposed solicitation issue date to on or about June 27, 2025, and response date to on or about July 29, 2025. Please be advised any official amendment issued will be accompanied by an SF-30.
Update #4 ·
Update 0003 is For Information Only, any official amendment will be accompanied by an SF30. This to transmit survey data for the IFB W912PL25B0004. Update 0002 is to transmit the SF-30 (3 pages) for Amendment 0001 of the IFB W912PL25B0004. This is to update the Bid Guarantee details. Update 0001 is to provide site visit information. The project will consist of repairs to a shore-connected, rubble-mound breakwater that provides protection from ocean waves to King Harbor in Redondo Beach, Los Angeles County, California. Repair work will consist of resetting of existing armor stone as needed and furnishing and placement of approximately 8,000 tons of new armor stone having a median stone size of 14-tons. There is an armor stone bench on the harborside of the structure that also requires repairs, the bench is at elevation +10.0 feet MLLW and has a width of 8.0 feet. The work will restore the structures to the design elevations and slopes in observed damage areas. The estimated magnitude of this project is: Between $5,000,000 and $10,000,000. The total contract duration is estimated at 210 calendar days. This acquisition will be issued as an Unrestricted Sealed Bid awarded under FAR Part 14 Sealed Bidding. The solicitation to be issued on or about 17 March 2025 with a tentative bid opening date of 17 April 2025. Sub-contracting plans are required for all construction contracts awarded to a large business when the award amount exceeds $1,500,000. If the offeror is a large business, the firm will be required to submit a subcontracting plan as part of its bid package. Plans and specifications will not be provided in hard paper copy. When the Solicitation is issued, it will be available through the Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE) suite at https://piee.eb.mil/For instructions on how to post an offer, please refer to the Posting Offer demo: https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf. Additional information is available via Web Based Training for the Solicitation Module at: https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/solicitation/proposals.xhtml The Government is not responsible for any loss of internet connectivity or for an offeror?s inability to access the documents posted at the referenced website. All offerors are advised that this project may be delayed, cancelled or revised at any time during the solicitation, selection, evaluation, negotiation and/or final award process. *PIEE Amendment 0001 is for administrative purposes only; this administrative Amendment is to increase the proposed solicitation issue date to on or about May 13, 2025, and response date to on or about June 17, 2025. Please be advised any official amendment issued will be accompanied by an SF-30. *PIEE Amendment 0002 is for administrative purposes only; this administrative Amendment is to increase the proposed solicitation issue date to on or about June 27, 2025, and response date to on or about July 29, 2025. Please be advised any official amendment issued will be accompanied by an SF-30.
Update #3 ·
Update 0002 is to transmit the SF-30 (3 pages) for Amendment 0001 of the IFB W912PL25B0004. This is to update the Bid Guarantee details. Update 0001 is to provide site visit information. The project will consist of repairs to a shore-connected, rubble-mound breakwater that provides protection from ocean waves to King Harbor in Redondo Beach, Los Angeles County, California. Repair work will consist of resetting of existing armor stone as needed and furnishing and placement of approximately 8,000 tons of new armor stone having a median stone size of 14-tons. There is an armor stone bench on the harborside of the structure that also requires repairs, the bench is at elevation +10.0 feet MLLW and has a width of 8.0 feet. The work will restore the structures to the design elevations and slopes in observed damage areas. The estimated magnitude of this project is: Between $5,000,000 and $10,000,000. The total contract duration is estimated at 210 calendar days. This acquisition will be issued as an Unrestricted Sealed Bid awarded under FAR Part 14 Sealed Bidding. The solicitation to be issued on or about 17 March 2025 with a tentative bid opening date of 17 April 2025. Sub-contracting plans are required for all construction contracts awarded to a large business when the award amount exceeds $1,500,000. If the offeror is a large business, the firm will be required to submit a subcontracting plan as part of its bid package. Plans and specifications will not be provided in hard paper copy. When the Solicitation is issued, it will be available through the Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE) suite at https://piee.eb.mil/For instructions on how to post an offer, please refer to the Posting Offer demo: https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf. Additional information is available via Web Based Training for the Solicitation Module at: https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/solicitation/proposals.xhtml The Government is not responsible for any loss of internet connectivity or for an offeror?s inability to access the documents posted at the referenced website. All offerors are advised that this project may be delayed, cancelled or revised at any time during the solicitation, selection, evaluation, negotiation and/or final award process. *PIEE Amendment 0001 is for administrative purposes only; this administrative Amendment is to increase the proposed solicitation issue date to on or about May 13, 2025, and response date to on or about June 17, 2025. Please be advised any official amendment issued will be accompanied by an SF-30. *PIEE Amendment 0002 is for administrative purposes only; this administrative Amendment is to increase the proposed solicitation issue date to on or about June 27, 2025, and response date to on or about July 29, 2025. Please be advised any official amendment issued will be accompanied by an SF-30.
Update #2 ·
Update 0001 is to provide site visit information. The project will consist of repairs to a shore-connected, rubble-mound breakwater that provides protection from ocean waves to King Harbor in Redondo Beach, Los Angeles County, California. Repair work will consist of resetting of existing armor stone as needed and furnishing and placement of approximately 8,000 tons of new armor stone having a median stone size of 14-tons. There is an armor stone bench on the harborside of the structure that also requires repairs, the bench is at elevation +10.0 feet MLLW and has a width of 8.0 feet. The work will restore the structures to the design elevations and slopes in observed damage areas. The estimated magnitude of this project is: Between $5,000,000 and $10,000,000. The total contract duration is estimated at 210 calendar days. This acquisition will be issued as an Unrestricted Sealed Bid awarded under FAR Part 14 Sealed Bidding. The solicitation to be issued on or about 17 March 2025 with a tentative bid opening date of 17 April 2025. Sub-contracting plans are required for all construction contracts awarded to a large business when the award amount exceeds $1,500,000. If the offeror is a large business, the firm will be required to submit a subcontracting plan as part of its bid package. Plans and specifications will not be provided in hard paper copy. When the Solicitation is issued, it will be available through the Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE) suite at https://piee.eb.mil/For instructions on how to post an offer, please refer to the Posting Offer demo: https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf. Additional information is available via Web Based Training for the Solicitation Module at: https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/solicitation/proposals.xhtml The Government is not responsible for any loss of internet connectivity or for an offeror?s inability to access the documents posted at the referenced website. All offerors are advised that this project may be delayed, cancelled or revised at any time during the solicitation, selection, evaluation, negotiation and/or final award process. *PIEE Amendment 0001 is for administrative purposes only; this administrative Amendment is to increase the proposed solicitation issue date to on or about May 13, 2025, and response date to on or about June 17, 2025. Please be advised any official amendment issued will be accompanied by an SF-30. *PIEE Amendment 0002 is for administrative purposes only; this administrative Amendment is to increase the proposed solicitation issue date to on or about June 27, 2025, and response date to on or about July 29, 2025. Please be advised any official amendment issued will be accompanied by an SF-30.
Update #1 ·
The project will consist of repairs to a shore-connected, rubble-mound breakwater that provides protection from ocean waves to King Harbor in Redondo Beach, Los Angeles County, California. Repair work will consist of resetting of existing armor stone as needed and furnishing and placement of approximately 8,000 tons of new armor stone having a median stone size of 14-tons. There is an armor stone bench on the harborside of the structure that also requires repairs, the bench is at elevation +10.0 feet MLLW and has a width of 8.0 feet. The work will restore the structures to the design elevations and slopes in observed damage areas. The estimated magnitude of this project is: Between $5,000,000 and $10,000,000. The total contract duration is estimated at 210 calendar days. This acquisition will be issued as an Unrestricted Sealed Bid awarded under FAR Part 14 Sealed Bidding. The solicitation to be issued on or about 17 March 2025 with a tentative bid opening date of 17 April 2025. Sub-contracting plans are required for all construction contracts awarded to a large business when the award amount exceeds $1,500,000. If the offeror is a large business, the firm will be required to submit a subcontracting plan as part of its bid package. Plans and specifications will not be provided in hard paper copy. When the Solicitation is issued, it will be available through the Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE) suite at https://piee.eb.mil/For instructions on how to post an offer, please refer to the Posting Offer demo: https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf. Additional information is available via Web Based Training for the Solicitation Module at: https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/solicitation/proposals.xhtml The Government is not responsible for any loss of internet connectivity or for an offeror?s inability to access the documents posted at the referenced website. All offerors are advised that this project may be delayed, cancelled or revised at any time during the solicitation, selection, evaluation, negotiation and/or final award process. *PIEE Amendment 0001 is for administrative purposes only; this administrative Amendment is to increase the proposed solicitation issue date to on or about May 13, 2025, and response date to on or about June 17, 2025. Please be advised any official amendment issued will be accompanied by an SF-30. *PIEE Amendment 0002 is for administrative purposes only; this administrative Amendment is to increase the proposed solicitation issue date to on or about June 27, 2025, and response date to on or about July 29, 2025. Please be advised any official amendment issued will be accompanied by an SF-30.
Files
| File | Type | Posted |
|---|---|---|
| W912PL25B0004_Abstract_Redondo_Breakwater_Repair_08Aug2025_-signed.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| North breakwater repairs at redondo beach-king harbor | Award Notice | |
| This notice | Solicitation | |
| North breakwater repairs at redondo beach-king harbor | Pre-Solicitation |