North breakwater repairs at redondo beach-king harbor

Closed Pre-Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
W912PL25B0004
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Redondo Beach, Los Angeles County, California 90277

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Army Corps of Engineers Engineering District Los Angeles is seeking contractors for the North Breakwater Repairs at Redondo Beach-King Harbor project, which involves repairing a shore-connected, rubble-mound breakwater that protects King Harbor from ocean waves in Redondo Beach, California. The repair work will consist of resetting existing armor stone and furnishing and placing approximately 8,000 tons of new armor stone with a median stone size of 14 tons, along with repairs to an armor stone bench located at elevation +10.0 feet MLLW with a width of 8.0 feet. This acquisition will be issued as an Unrestricted Sealed Bid awarded under FAR Part 14 Sealed Bidding procedures. The solicitation is scheduled to be issued on or about March 17, 2025, with a tentative bid opening date of April 17, 2025. Large businesses awarded contracts exceeding $1,500,000 will be required to submit subcontracting plans as part of their bid package, and all plans and specifications will be available electronically through the Procurement Integrated Enterprise Environment (PIEE) suite rather than in hard copy format.

This procurement opportunity has no set-aside designation and is open to all qualified contractors. The estimated project value ranges between $5,000,000 and $10,000,000, with a total contract duration estimated at 210 calendar days. The project falls under NAICS code 237990 for Other Heavy and Civil Engineering Construction and PSC code Z2KZ for Repair or Alteration of Other Conservation and Development Facilities. The work involves placing approximately 8,000 tons of new armor stone to restore the breakwater structures to their design elevations and slopes in areas where damage has been observed. The government has advised that this project may be delayed, cancelled, or revised at any time during the solicitation, selection, evaluation, negotiation, and final award process.

Notice text

3 versions

Update #3 · Latest ·

The project will consist of repairs to a shore-connected, rubble-mound breakwater that provides protection from ocean waves to King Harbor in Redondo Beach, Los Angeles County, California. Repair work will consist of resetting of existing armor stone as needed and furnishing and placement of approximately 8,000 tons of new armor stone having a median stone size of 14-tons. There is an armor stone bench on the harborside of the structure that also requires repairs, the bench is at elevation +10.0 feet MLLW and has a width of 8.0 feet. The work will restore the structures to the design elevations and slopes in observed damage areas. The estimated magnitude of this project is: Between $5,000,000 and $10,000,000. The total contract duration is estimated at 210 calendar days. This acquisition will be issued as an Unrestricted Sealed Bid awarded under FAR Part 14 Sealed Bidding. The solicitation to be issued on or about 17 March 2025 with a tentative bid opening date of 17 April 2025. Sub-contracting plans are required for all construction contracts awarded to a large business when the award amount exceeds $1,500,000. If the offeror is a large business, the firm will be required to submit a subcontracting plan as part of its bid package. Plans and specifications will not be provided in hard paper copy. When the Solicitation is issued, it will be available through the Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE) suite at https://piee.eb.mil/For instructions on how to post an offer, please refer to the Posting Offer demo: https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf. Additional information is available via Web Based Training for the Solicitation Module at: https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/solicitation/proposals.xhtml The Government is not responsible for any loss of internet connectivity or for an offeror?s inability to access the documents posted at the referenced website. All offerors are advised that this project may be delayed, cancelled or revised at any time during the solicitation, selection, evaluation, negotiation and/or final award process. *PIEE Amendment 0001 is for administrative purposes only; this administrative Amendment is to increase the proposed solicitation issue date to on or about May 13, 2025, and response date to on or about June 17, 2025. Please be advised any official amendment issued will be accompanied by an SF-30. *PIEE Amendment 0002 is for administrative purposes only; this administrative Amendment is to increase the proposed solicitation issue date to on or about June 27, 2025, and response date to on or about July 29, 2025. Please be advised any official amendment issued will be accompanied by an SF-30.

Update #2 ·

The project will consist of repairs to a shore-connected, rubble-mound breakwater that provides protection from ocean waves to King Harbor in Redondo Beach, Los Angeles County, California. Repair work will consist of resetting of existing armor stone as needed and furnishing and placement of approximately 8,000 tons of new armor stone having a median stone size of 14-tons. There is an armor stone bench on the harborside of the structure that also requires repairs, the bench is at elevation +10.0 feet MLLW and has a width of 8.0 feet. The work will restore the structures to the design elevations and slopes in observed damage areas. The estimated magnitude of this project is: Between $5,000,000 and $10,000,000. The total contract duration is estimated at 210 calendar days. This acquisition will be issued as an Unrestricted Sealed Bid awarded under FAR Part 14 Sealed Bidding. The solicitation to be issued on or about 17 March 2025 with a tentative bid opening date of 17 April 2025. Sub-contracting plans are required for all construction contracts awarded to a large business when the award amount exceeds $1,500,000. If the offeror is a large business, the firm will be required to submit a subcontracting plan as part of its bid package. Plans and specifications will not be provided in hard paper copy. When the Solicitation is issued, it will be available through the Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE) suite at https://piee.eb.mil/For instructions on how to post an offer, please refer to the Posting Offer demo: https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf. Additional information is available via Web Based Training for the Solicitation Module at: https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/solicitation/proposals.xhtml The Government is not responsible for any loss of internet connectivity or for an offeror?s inability to access the documents posted at the referenced website. All offerors are advised that this project may be delayed, cancelled or revised at any time during the solicitation, selection, evaluation, negotiation and/or final award process. *PIEE Amendment 0001 is for administrative purposes only; this administrative Amendment is to increase the proposed solicitation issue date to on or about May 13, 2025, and response date to on or about June 17, 2025. Please be advised any official amendment issued will be accompanied by an SF-30.

Update #1 ·

The project will consist of repairs to a shore-connected, rubble-mound breakwater that provides protection from ocean waves to King Harbor in Redondo Beach, Los Angeles County, California. Repair work will consist of resetting of existing armor stone as needed and furnishing and placement of approximately 8,000 tons of new armor stone having a median stone size of 14-tons. There is an armor stone bench on the harborside of the structure that also requires repairs, the bench is at elevation +10.0 feet MLLW and has a width of 8.0 feet. The work will restore the structures to the design elevations and slopes in observed damage areas. The estimated magnitude of this project is: Between $5,000,000 and $10,000,000. The total contract duration is estimated at 210 calendar days. This acquisition will be issued as an Unrestricted Sealed Bid awarded under FAR Part 14 Sealed Bidding. The solicitation to be issued on or about 17 March 2025 with a tentative bid opening date of 17 April 2025. Sub-contracting plans are required for all construction contracts awarded to a large business when the award amount exceeds $1,500,000. If the offeror is a large business, the firm will be required to submit a subcontracting plan as part of its bid package. Plans and specifications will not be provided in hard paper copy. When the Solicitation is issued, it will be available through the Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE) suite at https://piee.eb.mil/For instructions on how to post an offer, please refer to the Posting Offer demo: https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf. Additional information is available via Web Based Training for the Solicitation Module at: https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/solicitation/proposals.xhtml The Government is not responsible for any loss of internet connectivity or for an offeror?s inability to access the documents posted at the referenced website. All offerors are advised that this project may be delayed, cancelled or revised at any time during the solicitation, selection, evaluation, negotiation and/or final award process.

Notice history

Notice Type Posted
North breakwater repairs at redondo beach-king harbor Award Award Notice
North breakwater repairs at redondo beach-king harbor Latest solicitation Solicitation
This notice Original Pre-Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity