Non-Slip Flooring Project

Closed Solicitation Posted

Solicitation number
W91QV124R0127
Agency
MICC Fort Sam Houston Mission and Installation Contracting Command, Department of Defense
Responses due
Set-aside
Competitive 8(a)

Opportunity facts

NAICS code
238390 Other Building Finishing Contractors
PSC
7220 Floor Coverings
Place of performance
Fort Belvoir, Virginia 22060, United States
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

Paragraph 1:

This federal contract opportunity, identified as ID 9c0b611c95894117abcee76c17aaefa9, seeks a contractor to add non-slip flooring to Fire Station 9 (Building 989) at the Fort Walker Army installation. The Department of the Army Materiel Command Mission and Installation Contracting Command Fort Sam Houston is the procuring agency. The key requirements include prepping the concrete garage floor, applying a texture/non-slip surface treatment, and complying with all applicable laws and regulations, including OSHA. The contract will be awarded on a firm-fixed price basis, and the contractor's quality control plan and personnel qualifications must be approved. The government will perform quality assurance inspections, and the contractor must repair any damages at no additional cost. The contract is due August 16, 2024.

Paragraph 2:

This contract opportunity is set aside for competitive 8(a) contractors. The North American Industry Classification System (NAICS) code is 238390 - Other Building Finishing Contractors, and the Product and Service Code (PSC) is 7220 - Floor Coverings. The magnitude of the action is less than $25,500, and the period of performance is 60 days from the date of award. The work will be performed at the Fort Belvoir Army installation in Virginia.

Notice text

This statement of work will outline the general scope of adding non-slip flooring to Fire
Station 9 (Building 989). Work Area at this location will be the concrete floor within the
garage bays Building 989 at Fort Walker. Contractor awarded the contract will be
responsible for all labor and materials as needed to complete the scope of work, to
include delivery of those materials.
The main objective for this project, will be to prep and add texture/non-slip surface to
Building 989 at Fort Walker. This project is to prevent further injuries.

Attachments

Files attached to this notice, newest first
File Type Posted
PWS FY24 - FS9 Flooring.pdf PDF
24R0127 Replace Floor Fire Station 9.pdf PDF

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity