Noca - install and finish sheetrock
Closed Solicitation Posted
- Solicitation number
- 140P8325Q0019
- Agency
- Pacific West Region National Park Service, Department of the Interior
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238310 Drywall and Insulation Contractors
- Points of contact
-
- Mickey Chisolm mickey_chisolm@nps.gov (360) 565-3025
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Interior National Park Service Pacific West Region is soliciting contractors to install and finish sheetrock in the Marblemount Administrative Building at North Cascades National Park, covering less than 2,250 square feet of ceiling surface area. The project requires installing sheetrock over existing acoustic tiles and finishing to level 4 standards, with careful attention to blending the new materials with the historic building's current walls. Contractors must demonstrate at least 5 years of relevant experience and submit detailed technical approaches, references, and past performance information. The evaluation will be based on price and other factors considered approximately equal, including technical capability and past performance. A mandatory pre-proposal site visit is scheduled for July 17, 2025, at 10:00 AM Pacific, with proposals due by 5:00 PM Pacific on August 11, 2025, via email to the contracting officer.
This opportunity is designated as a 100% small business set-aside under NAICS code 238310 (Drywall and Insulation Contractors) with a size standard of $19 million. The estimated contract value ranges between $25,000 and $100,000, to be awarded on a lump sum basis. The contractor must begin work within 10 calendar days of award and complete the project within 30 calendar days, with work limited to Monday through Thursday from 6:00 AM to 5:00 PM. The work will be performed at 7280 Ranger Station Road, Marblemount, WA 98267, with no performance or payment bonds required. The project is scheduled for completion in fall 2025, and contractors must maintain strict adherence to National Park Service guidelines while ensuring minimal disruption to park operations.
Notice text
North Cascades National Park (NOCA) has a requirement to install sheetrock the Marblemount Administrative Building less than 2,250 Square feet of surface area. Sheetrock will be installed over existing acoustic tiles and be finished flush with existing wall sheetrock. As this project is in a historic building all new sheetrock will need to blend in with current walls.
Attachments
| File | Type | Posted |
|---|---|---|
| Sol_140P8325Q0019.pdf | ||
| B08_Attachment_04_Forms_to_Return_with_Quote.pdf | ||
| B08_Attachment_01_Solicitation_Provisions__Terms__and_Clauses.pdf | ||
| B08_Attachment_02_Updated_SOW__Sheetrock_MMT_8_May_2025.pdf | ||
| B08_Attachment_03_Wage_Determination_SAM.pdf |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity