NOAA Fast Rescue Boat (FRB) Long Lead Time Material (LLTM) Procurement
Closed Pre-Solicitation Posted
- Solicitation number
- 140802-25-0325
- Agency
-
National Oceanic and Atmospheric Administration
Department of Commerce
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 336611 Ship Building and Repairing
- Place of performance
- Norfolk, Virginia 23510, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The National Oceanic and Atmospheric Administration (NOAA) is seeking to procure Long Lead Time Material (LLTM) for a Fast Rescue Boat (FRB) 5-year overhaul project scheduled for Fiscal Year 2026. The procurement is a sole-source contract intended to be awarded to Allied Systems Company, the original equipment manufacturer (OEM) of the boat's davit system. This acquisition will cover specific replacement parts including a complete winch, wire rope assembly, off-load hook, foundation hardware, gauges, actuators, and coupling parts. The contract will be executed under FAR Part 13 procedures, with statutory authority provided by 41 U.S.C. 3304(a)(1), which allows for procurement from the only responsible source capable of meeting agency requirements. Interested parties have until 10:00 AM EST on March 14, 2025, to submit a capability statement to Contract Specialist Andre Frantz, demonstrating their comprehensive understanding and technical ability to meet the project specifications.
The contract is not set aside for any specific business category and falls under NAICS code 336611 for Ship Building and Repairing, with a business size standard of 1,300 employees. Allied Systems Company is the sole source for this procurement due to their status as the OEM, and only their service technicians are authorized to perform maintenance and install parts for the rescue boat davit system. Materials are scheduled for delivery on or before August 29, 2025, to the Marine Operations Center Atlantic in Norfolk, Virginia. While no specific contract value is disclosed, the procurement is focused on critical long lead time materials necessary for the ship's maintenance. The contract represents a targeted approach to ensuring proper equipment functionality and maintaining the manufacturer's warranty by using original manufacturer components and technicians.
Notice text
2 versions
Update #2 · Latest ·
Synopsis: Notice of Intent to Award a Sole-Source Contract
Announcement Number: 140802-25-0325
Project Title: NOAA Fast Rescue Boat (FRB) Long Lead Time Material (LLTM) Procurement
The US Department of Commerce (DOC), National Oceanic and Atmospheric Administration (NOAA), Eastern Acquisition Division (EAD) intends to negotiate on a sole source basis with Allied Systems Company, using the procedures in FAR Part 13, to provide required LLTM required for the 5-year overhaul to be completed during the FY2026 Dockside Repair project from the manufacturer’s representative in accordance with the Statement of Work (SOW). Allied Systems Company is the OEM of the Fast Rescue Boat and per the Allied Systems Company technical specifications, and Allied Systems Company service technicians must be used for any parts or maintenance on the davits. The statutory authority permitting other than full and open competition is 41 U.S.C. 3304(a)(1) as implemented by the Federal Acquisition Regulation (FAR) Subpart 6.302-1 entitled, Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements.
The North American Industry Classification Code (NAICS) for this acquisition is 336611, Ship Building and Repairing with a business size standard of 1300 employees.
This is not a solicitation for competitive quotes, nor will one be posted on the Government Entry Point, SAM.gov.
A determination by the Government not to compete this proposed requirement based upon responses to this notice is solely within the discretion of the Government. However, if any interested party believes that it is capable of meeting the requirements, and in an effort to comply with the requirements outlined in FAR 5.102, a firm may submit a written notice expressing their comprehensive understanding of the requirement along with a narrative statement of the company’s capabilities, including technical information to support the company’s ability to meet the requirement. Please note, the capability statement must contain material in sufficient detail to allow NOAA to determine if the party can meet all of the requirements.
Please send your correspondence to the Contract Specialist, Andre Frantz, at Andre.Frantz@noaa.gov, with the subject line to include the Announcement Number: Project Title.
Any notice, to include all supporting documentation, must be received on or before 10:00 AM EST on March 14, 2025.
Attachments:
1. SOW DRAFT (TJ_FY26_FRB_SOW_Draft).
Update #1 ·
Synopsis: Notice of Intent to Award a Sole-Source Contract
Announcement Number: 140802-25-0325
Project Title: NOAA Fast Rescue Boat (FRB) Long Lead Time Material (LLTM) Procurement
The US Department of Commerce (DOC), National Oceanic and Atmospheric Administration (NOAA), Eastern Region Acquisition Division intends to negotiate on a sole source basis with Allied Systems Company, using the procedures in FAR Part 13, to provide required LLTM required for the 5-year overhaul to be completed during the FY2026 Dockside Repair project from the manufacturer’s representative in accordance with the Statement of Work (SOW). Allied Systems Company is the OEM of the Fast Rescue Boat and per the Allied Systems Company technical specifications, and Allied Systems Company service technicians must be used for any parts or maintenance on the davits. The statutory authority permitting other than full and open competition is 41 U.S.C. 3304(a)(1) as implemented by the Federal Acquisition Regulation (FAR) Subpart 6.302-1 entitled, Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements.
The North American Industry Classification Code (NAICS) for this acquisition is 336611, Ship Building and Repairing with a business size standard of 1300 employees.
This is not a solicitation for competitive quotes, nor will one be posted on the Government Entry Point, SAM.gov.
A determination by the Government not to compete this proposed requirement based upon responses to this notice is solely within the discretion of the Government. However, if any interested party believes that it is capable of meeting the requirements, and in an effort to comply with the requirements outlined in FAR 5.102, a firm may submit a written notice expressing their comprehensive understanding of the requirement along with a narrative statement of the company’s capabilities, including technical information to support the company’s ability to meet the requirement. Please note, the capability statement must contain material in sufficient detail to allow NOAA to determine if the party can meet all of the requirements.
Please send your correspondence to the Contract Specialist, Andre Frantz, at Andre.Frantz@noaa.gov, with the subject line to include the Announcement Number: Project Title.
Any notice, to include all supporting documentation, must be received on or before 10:00 AM EST on March 14, 2025.
Attachments:
1. SOW DRAFT (TJ_FY26_FRB_SOW_Draft).
Files
| File | Type | Posted |
|---|---|---|
| TJ_FY26_FRB_SOW_Draft.pdf |