Nez Perce-Clearwater NFs - Weitas Creek Bridge Repairs

Award Notice Posted

Solicitation number
AG-02RC-S-14-0143
Agency
Awarded
to Engleman Steel Erection, Inc.
Set-aside
Total Small Business

Opportunity facts

Contract number
AG-02RC-P-14-0346 Federal contract award
NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Not on record
Place of performance
North Fork Ranger District 12730 Hwy 12 Pierce, Idaho 83546, United States

Notice details come from SAM.gov. Updated .

Notice text

5 versions

Update #5 · Latest ·

Award made on 7/19/14.

Update #4 ·

Weitas Creek Bridge Repairs:  This project consists of jacking and shoring the bridge steel superstructure at the intermediate pier and repairing the intermediate concrete pier caps.  The end pier caps will be repaired as well but jacking and shoring will not be required.  Other work consists of repairing concrete spalls in the pier walls and tightening miscellaneous bolts on the steel superstructure.  If funding allows, scour mitigation may also be performed at the base of the intermediate pier. 

The Weitas Creek Bridge is located on the North Fork Ranger District of the Nez Perce-Clearwater National Forests.  The bridge can be reached by heading east on US Hwy 12 from Orofino, ID.  Travel 7 miles and turn left onto State Hwy 11 at the Greer Junction.  Take State Hwy 11 to Pierce, ID.  Just before entering Pierce, turn right onto USFS Road 250 and proceed 29 miles to the North Fork of the Clearwater river.  After crossing the North Fork river, turn right and proceed up river approximately 5 miles.  The Weitas Creek Bridge is on the right. 

Project completion deadline for base bid is 7/15/2015; scour mitigation, if awarded, shall be performed between 8/15/2015 and 9/15/2015.  Government price estimate for this project is between $100,000-$250,000 for the base and optional items combined.  A pre-bid tour shall be held on 8/27/2014, see Section L for details.  Bid bonds are required if the total value quoted exceeds $150,000.  Project has been set-aside for small businesses. 

Solicitation was amended 8/21/14 to confirm that site visit is scheduled for Wednesday, August 27, 2014. 

Solicitation Amendment 2 was issued 9/2/14 to addess two items that came up during the site visit.  Contractors must acknowledge receipt of this amendment in writing with their quote.

Update #3 ·

Weitas Creek Bridge Repairs:  This project consists of jacking and shoring the bridge steel superstructure at the intermediate pier and repairing the intermediate concrete pier caps.  The end pier caps will be repaired as well but jacking and shoring will not be required.  Other work consists of repairing concrete spalls in the pier walls and tightening miscellaneous bolts on the steel superstructure.  If funding allows, scour mitigation may also be performed at the base of the intermediate pier. 

The Weitas Creek Bridge is located on the North Fork Ranger District of the Nez Perce-Clearwater National Forests.  The bridge can be reached by heading east on US Hwy 12 from Orofino, ID.  Travel 7 miles and turn left onto State Hwy 11 at the Greer Junction.  Take State Hwy 11 to Pierce, ID.  Just before entering Pierce, turn right onto USFS Road 250 and proceed 29 miles to the North Fork of the Clearwater river.  After crossing the North Fork river, turn right and proceed up river approximately 5 miles.  The Weitas Creek Bridge is on the right. 

Project completion deadline for base bid is 7/15/2015; scour mitigation, if awarded, shall be performed between 8/15/2015 and 9/15/2015.  Government price estimate for this project is between $100,000-$250,000 for the base and optional items combined.  A pre-bid tour shall be held on 8/27/2014, see Section L for details.  Bid bonds are required if the total value quoted exceeds $150,000.  Project has been set-aside for small businesses. 

Solicitation was amended 8/21/14 to confirm that site visit is scheduled for Wednesday, August 27, 2014. 

Update #2 ·

Weitas Creek Bridge Repairs:  This project consists of jacking and shoring the bridge steel superstructure at the intermediate pier and repairing the intermediate concrete pier caps.  The end pier caps will be repaired as well but jacking and shoring will not be required.  Other work consists of repairing concrete spalls in the pier walls and tightening miscellaneous bolts on the steel superstructure.  If funding allows, scour mitigation may also be performed at the base of the intermediate pier. 

The Weitas Creek Bridge is located on the North Fork Ranger District of the Nez Perce-Clearwater National Forests.  The bridge can be reached by heading east on US Hwy 12 from Orofino, ID.  Travel 7 miles and turn left onto State Hwy 11 at the Greer Junction.  Take State Hwy 11 to Pierce, ID.  Just before entering Pierce, turn right onto USFS Road 250 and proceed 29 miles to the North Fork of the Clearwater river.  After crossing the North Fork river, turn right and proceed up river approximately 5 miles.  The Weitas Creek Bridge is on the right. 

Project completion deadline for base bid is 7/15/2015; scour mitigation, if awarded, shall be performed between 8/15/2015 and 9/15/2015.  Government price estimate for this project is between $100,000-$250,000 for the base and optional items combined.  A pre-bid tour shall be held on 8/27/2014, see Section L for details.  Bid bonds are required if the total value quoted exceeds $150,000.  Project has been set-aside for small businesses. 

Update #1 ·

Weitas Creek Bridge Repairs:  This project consists of jacking and shoring the bridge steel superstructure at the intermediate pier and repairing the intermediate concrete pier caps.  The end pier caps will be repaired as well but jacking and shoring will not be required.  Other work consists of repairing concrete spalls in the pier walls and tightening miscellaneous bolts on the steel superstructure.  If funding allows, scour mitigation may also be performed at the base of the intermediate pier. 

The Weitas Creek Bridge is located on the North Fork Ranger District of the Nez Perce-Clearwater National Forests.  The bridge can be reached by heading east on US Hwy 12 from Orofino, ID.  Travel 7 miles and turn left onto State Hwy 11 at the Greer Junction.  Take State Hwy 11 to Pierce, ID.  Just before entering Pierce, turn right onto USFS Road 250 and proceed 29 miles to the North Fork of the Clearwater river.  After crossing the North Fork river, turn right and proceed up river approximately 5 miles.  The Weitas Creek Bridge is on the right. 

Project completion deadline is 9/15/2015.  Government price estimate for this project is between $100,000-$250,000.  A pre-bid tour shall be held.  Date and time shall be announced in the solicitation.  Project has been set-aside for small businesses. 

Files

File Type Posted
Amend2AttachmentSheet6Revision.pdf PDF
Amendment2.doc DOC document
SiteTourNotes.docx DOCX document
Amend1SiteVisitDetails.doc DOC document
CNF_Weitas-Final_Plans_2014-08-06.pdf PDF
CNF_Weitas-FSSS.pdf PDF
ConstructionRFQ.doc DOC document