CNF_Weitas-FSSS.pdf
PDF 645 KB Posted
- Solicitation number
- AG-02RC-S-14-0143
About this file
Attachment J-2 Supplemental Specifications 18 pages.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment2.doc | DOC document | |
| Amend2AttachmentSheet6Revision.pdf | ||
| SiteTourNotes.docx | DOCX document | |
| Amend1SiteVisitDetails.doc | DOC document | |
| CNF_Weitas-Final_Plans_2014-08-06.pdf | ||
| ConstructionRFQ.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
i
FOREST SERVICE
SUPPLEMENTAL SPECIFICATIONS
FOR
WEITAS CREEK BRIDGE REPAIRS
ROAD NO. 105 – M.P. 25.0
U.S.D.A Forest Service, Region 1 Nez Perce-Clearwater National Forests
North Fork Ranger District Clearwater County, Idaho
Prepared by:
GREAT WEST ENGINEERING
2501 Belt View Drive
Helena, MT 59604 ii
WEITAS CREEK BRIDGE REPAIRS
Road No. 105 – M.P. 25.0
FOREST SERVICE SUPPLEMENTAL SPECIFICATIONS
TABLE OF CONTENTS
PREFACE
101 - TERMS, FORMAT, AND DEFINITIONS
102 - BID, AWARD, AND EXECUTION OF CONTRACT
103 - SCOPE OF WORK
104 - CONTROL OF WORK
105 - CONTROL OF MATERIAL
106 - ACCEPTANCE OF WORK
107 - LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC
108 - PROSECUTION AND PROGRESS
109 - MEASUREMENT AND PAYMENT
151 - MOBILIZATION
153 – CONTRACTOR QUALITY CONTROL
155 – SCHEDULES FOR CONSTRUCTION CONTRACTS
156 - PUBLIC TRAFFIC
561 – CONCRETE FOUNDATION REPAIR
623 – GENERAL LABOR
PREFACE
Delete all but the first paragraph and add the following:
The Forest Service, US Department of Agriculture has adopted FP-03 for construction of
National Forest System Roads.
101 - TERMS, FORMAT, AND DEFINITIONS
101.01 Meaning of Terms.
Add the following:
Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.
101.03 Abbreviations.
Add the following to (a) Acronyms:
AFPA
MSHA
NIST
NESC
WCLIB
American Forest and Paper Association
Mine Safety and Health Administration
National Institute of Standards and Technology
National Electrical Safety Code
West Coast Lumber Inspection Bureau
Add the following to (b) SI Symbols:
mp Milepost ppm Part Per Million
101.04 Definitions.
Delete the following definitions and substitute the following:
Bid Schedule--The Schedule of Items.
Bridge--No definition.
Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the
“purchaser”.
Culvert--No definition.
Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.
http://www.nist.gov/
Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal
Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale
Contract, as applicable.
Change--“Change” means “change order” as used in the Federal Acquisition
Regulations, or “design change” as used in the Timber Sale Contract.
Design Quantity--“Design quantity” is a Forest Service method of measurement from the FS-96 Forest Service Specifications for the Construction of Roads and Bridges.
Under these FP specifications this term is replaced by the term “Contract Quantities”.
Forest Service--The United States of America, acting through the Forest Service, U.S.
Department of Agriculture.
Neat Line--A line defining the proposed or specified limits of an excavation or structure.
Pioneer Road--Temporary construction access built along the route of the project.
Purchaser--The individual, partnership, joint venture, or corporation contracting with the
Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.
Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.
Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.
Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, methods of measurement, unit price, and amount.
Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.
Add Figure 101-1—Illustration of road structure terms:
Figure 101-1—Illustration of road structure terms.
R ig h t o f
W a y
R o a d s id e R o a d s id e
C le a ri n g W id th
R o a d w a y
C le a ri n g
L im it X
Y
G ro u n d
L in e
T ra v e le d
W a y
C L B e rm
S u rf a c e
C o u rs e
B a s e
C o u rs e
F ill
S lo p e
B a c k S lo p e
D ra in a g e D itc h
G ro u n d
L in e
S u b g ra d e
R o a d B e d
S h a p e s a n d d im e n s io n s w ill v a ry t o f it l o c a l c o n d iti o n s
S e e d ra w in g s f o r ty p ic a l s e c tio n s
X a n d Y d e n o te c le a ri n g o u ts id e o f ro a d w a y
N o te
Right - of - Way Line
Right - of - Way Line
Clearing Limit
Shoulder
Shoulder
102 - BID, AWARD, AND EXECUTION OF CONTRACT
102 Bid, Award, and Execution of Contract
Delete Section 102 in its entirety.
103 - SCOPE OF WORK
Deletions
Delete all but subsection 103.01 Intent of Contract.
The project consists of the repair of an existing four-span bridge consisting of two main
175’ truss spans and two shorter timber approach spans. The overall span of the bridge is approximately 397 feet. Repairs to the existing bridge substructure and superstructure are required in order to re-open the bridge to public traffic. Improvements consist of, but are not limited to: removing unsound concrete, repairing the deteriorated concrete pier caps and patching the foundation spalls, tightening of the upper steel lateral bracing, and placement of riprap at the center pier. The repair of the center pier will require a jacking/shoring system to remove the weight of the truss superstructure in order to repair the pier cap.
The bridge is located on Forest Service Road No. 105 at the North Fork of the Clearwater
River crossing at milepost 25.0. The project is located approximately 34 miles northeast of Pierce in the North Fork Ranger District of the Nez Perce-Clearwater National Forests, in Clearwater County, Idaho (Section 15, Township 38 N, Range 8 E). Refer to the location map on the title sheet of the plans.
104 - CONTROL OF WORK
104 Control of Work.
Delete sections 104.01, 104.02, and 104.04.
Add the following subsection:
104.06 Use of Roads by Contractor
The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.
Add the following subsection:
104.07 Use of Dispersed Site by Contractor
The Contractor is authorized to use the dispersed site located near the northern roadway approach to the Weitas Creek Bridge for the purposes of materials and equipment staging. This location may also be utilized by the Contractor as a fee-free camping area and for all other activities necessary to complete this contract, subject to the limitations and authorizations designated or described in the contract, when such use will not damage national forest resources.
105 - CONTROL OF MATERIAL
105.02 Material Sources.
Add the following before the first paragraph.
Sources have been designated for this project as follows:
Waste Site – Government Furnished - A waste site for excess or unsuitable soil materials will be located by the CO on National Forest lands within ½ mile of the site.
Riprap Source – Government Furnished – A rock source for riprap rock is located at the Garner Point Quarry located in Section 13, Township 39 North, Range 9
East as shown on the cover sheet of the plans. Rock will require development and sorting to meet the specified gradation.
Approved Material Stockpile Site– The Contractor will be allowed to stockpile material, including riprap, and bridge repair components at the site adjacent to the existing roadway. Materials must be stockpiled in such a manner as to allow for safe passage of the general public along Road No. 250, to avoid damage to any trees at the project site and must be placed above the ordinary high water mark of the stream. Provide the CO 72 hours advance notification prior to stockpiling any materials at the construction sites.
Add the following to section (b) Contractor-located sources:
Prior to any pit development or use of materials, the Contractor shall provide to the CO a State certification that the pit site is free of noxious weed as listed on the
"All States Noxious Weeds List”.
106 - ACCEPTANCE OF WORK
106.07 Delete
Delete subsection 106.07.
107 - LEGAL RELATIONS AND RESPONSIBILITY TO THE
PUBLIC
107.05 Responsibility for Damage Claims.
Delete the entire subsection.
107.06 Contractor’s Responsibility for Work.
Delete the following from the first paragraph.
“except as provided in Subsection 106.07”
107.09 Legal Relationship of the Parties.
Delete the entire subsection.
108 - PROSECUTION AND PROGRESS
108 Delete
Delete Section 108 in its entirety.
109 - MEASUREMENT AND PAYMENT
Delete the following entire subsections:
109.06 Pricing of Adjustments.
109.07 Eliminated Work.
109.08 Progress Payments.
109.09 Final Payment.
Add the following Definition:
109.02 Measurement Terms and Definitions.
(b) Contract quantity.
Add the following:
Contract quantities will be adjusted only when there are errors in the original design of
15% or more.
Change the following:
“(b) Cubic yard” to “(c) Cubic yard”.
Add the following definition:
(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.
Add the following Subsection:
109.10 Methods of Measurement
One of the following methods of measurement for determining final payment is
DESIGNATED IN THE SCHEDULE OF ITEMS for each PAY ITEM:
(a) Actual Quantities (AQ). These quantities are determined from measurements of completed work.
(b) Contract Quantities (CQ). As defined in 109.02 (b) and supplemented above.
151 - MOBILIZATION
151.01 Description
A preliminary construction schedule shall be submitted 7 days prior to the preconstruction meeting.
Work also includes cleaning all construction equipment prior to entry on to Forest Lands.
Remove all dirt, plant parts and material that may carry noxious weed seeds into the area.
Only construction equipment inspected by the Forest Service will be allowed to operate within the project area. Treat subsequent move-ins of equipment the same as the initial move-in. Clean truck beds and dump boxes hauling to the project site prior to entering the work area. The Contractor shall give the Forest Service at least 24 hours advance notification when equipment is ready for inspection. The location for inspection shall be as agreed upon in the preconstruction meeting.
151.03 Payment
Include all costs associated with the cleaning of equipment in the unit price for
Mobilization.
153 – CONTRACTOR QUALITY CONTROL
Add the following.
153.07. Project Submittals
At a minimum the contractor shall provide project submittals as shown on the below
Submittal Log. Submittal requirements are listed in the Standard Specifications, Supplemental Specifications, and Plans.
Submittal Log
Log
No.
Incidental to
Pay
Item(s) Description of Submittal
Type of
Submittal
Requirement found in
Specification No.
/Drawings
Additional
Specification
References
1 151 Submittal Schedule Schedule
2 151 Weed Free Material Source
Certification
Material
Certification FSSS 105.02(b)
3 151 Hazardous Spill Plan Plan FSSS 107.10
4 151 Contractor Quality Control Plan Plan 153.02 552.09
5 151 Material Storage/Staging Plan Plan and
Description FSSS 151 Drawings
6 251 Riprap Installation Plan Plan Drawings
7 552
Pier Cap Demolition & Repair Plan
Temporary bracing and shoring plan.
Jacking systems
Plan Drawings
8 552 Structural Concrete: Mix Design Mix Design 552.03 553,553A, Drawings
9 552 Structural Concrete: Testing Test Results 552.19 106, Drawings
10 554 Reinforcing Steel
Order List, Material
Certification
554.03 553, 553A, 709, Drawings
11 561 Miscellaneous Material: Grout Material
Certification FSSS 725.40 553, Drawings
12 561 Miscellaneous Material: Grout Product
Approval FSSS 725.40 553, Drawings
155 – SCHEDULES FOR CONSTRUCTION CONTRACTS
155 Delete
Delete Section 155 in its entirety.
156 - PUBLIC TRAFFIC
156.03 Accommodating Traffic During Work.
Delete the following from the last paragraph:
According to Subsection 106.07(b)
Delete the first paragraph and replace with the following:
Accommodate traffic according to the requirements set forth below, MUTCD, and
Section 635. Submit a traffic control plan for acceptance at least 30 days before intended use.
Add the following project specific requirements:
During construction, the existing bridge will remain closed to public traffic.
It is the responsibility of the Contractor to schedule delivery of materials, equipment and all necessary supplies to the site, to ensure that the bridge repairs can be substantially completed within the specified contract time. The Contractor shall be responsible for providing, installing, maintaining, and removal of type 3 barricades.
156.08 Traffic and Safety Supervisor.
Delete this subsection in its entirety.
156.10 Measurement and payment.
Delete this subsection in its entirety and replace with the following:
Do not measure Public Traffic for payment. Compensation for this item shall be incidental to Mobilization.
561 – CONCRETE FOUNDATION REPAIR
Add the following:
561.01 Description - Cementitious Patching Material.
Furnish early strength gaining cementitious material and polymer modified protective coating that is packaged and ready for use with the addition of components at the construction site.
Deliver materials in original, unopened containers with manufacturer’s name, labels, product identification, and batch numbers. Damaged materials must be removed from the site. Store all materials off the ground and protect from rain, freezing or excessive heat until ready to use.
Delivery storage and handling, surface preparation, mixing, and application shall conform to the manufacturer’s requirements and recommendations.
561.02 Requirements. The Contractor shall furnish material that conforms to specifications in the following section and subsections:
Reinforcing Steel................................................................ 709.01
561.03 Material.
Use materials that meet the following conditions:
(a) SikaRepair 222 with Latex R by Sika Restoration Systems or equivalent.
(b) Sika Armatec 110 Epocem (bonding agent and anti-corrosion coating) by Sika
Restoration Systems or equivalent.
(c) Silane-based water-repellent surface sealant. Sikagard740W or equivalent.
Clear, breathable, solvent-based, VOC-compliant, greater than 40 percent alkylalkoxysilane or alkytrialkoxy, penetrating sealer. Must penetrate and chemically react with concrete/mortar/grout-based surfaces to form a long-lasting water-repellent surface
Furnish the CO with product literature and certification as required in Section 106.03 for review and approval prior to installation. When requested by the CO, furnish a sample of the material from each lot for verification testing. As specified on the contract plans, the above products meet the project requirements.
Measurement
561.04. Use the method of measurement that is DESIGNATED IN THE SCHEDULE OF
ITEMS.
623 – GENERAL LABOR
Delete the first two sentences of the first paragraph and add the following:
Furnish competent trained workers, appropriate hand tools, power tools, safety gear, fall protection gear, hazard pay (as required), and equipment for work including, but not limited to the following; bolt tightening, member straightening, member replacement, scale/rust removal; application of corrosion resistant coatings/surfacing; miscellaneous repairs, or other as directed by the CO.