Nez Perce-Clearwater NFs - Road 285 and 357 Road Rehabilitation
Award Notice Posted
- Solicitation number
- 12034318Q0276
- Agency
-
Region 1 - Northern Region
Forest Service, Department of Agriculture
- Awarded
- to Stone Ridge Construction, Inc.
- Set-aside
- HUBZone
Opportunity facts
- Contract number
- 12034318C0094 Federal contract award
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Not on record
- Place of performance
- Red River Ranger Station 300 American River Road Elk City, Idaho 83525, United States
Notice details come from SAM.gov. Updated .
Notice text
3 versions
Update #3 · Latest ·
Award was made on 8/9/2018.. Awarded Vendors: Stone Ridge Construction, Inc.. Contract Award Dollar Amount: $197,398. Contract Award Date: 2018-08-09.
Update #2 ·
This project is to make improvements to roads 285 and 357 near Elk Mountain. The work includes but is not limited to road reconditioning, hauling and placing aggregate base and surface course, light roadside brushing, removing and disposing of existing culverts and open tops, installation of new culverts, sign installation, and all other incidental items necessary to complete the project in accordance with the plans and specifications.
The project is approximately 50 miles east of Grangeville, ID. This project is on roads 285 and 357 located about 18 miles east of the Red River Ranger Station following the Magruder Rd (RD 468). The project starts at the Junction of Road 468 and 285 and includes the entire length of roads 285 and 357 (27.99 miles). The project is in Red River Ranger District in the Nez Perce-Clearwater National Forests. The project begins in Section 28, Township 28 N, Range 11 E.
The Government's estimate for the project is between $100,000 and $250.000. Work on the project site may commence on or around September 1, 2018, and proceed in accordance with the contractor's approved work schedule and run continuously till the end of the project no later than October 31, 2019. Contractors may opt to perform all the work in 2019.
The RFQ shall be issued apprximately July 15, 2018 with award anticipated in Mid-Auguast. Bid bonds are not required. The project as been set-aside for HUBzone small business concerns.
This presolicitation was posted on 6/22/2018 to an incorrect USFS FBO location by mistake under solicitation number 12034318Q0247. The original posting, made under the R-1 Northern Region location, should have been made under this R-1 IMAT location (Clearwater, Idaho Panhandle, Kootenai and Nez Perce NFs). In order to ensure that the notice and solicitation reach the correct market and pool of vendors, the notice was re-posted with this new solicitation number: 12034318Q0276. The orginal notice (12034318Q0247) satisfies the 15-day FAR required presolicitation posting for the procurement.
Request for Quotes was issued on 7/16/2018.
.
Update #1 ·
This project is to make improvements to roads 285 and 357 near Elk Mountain. The work includes but is not limited to road reconditioning, hauling and placing aggregate base and surface course, light roadside brushing, removing and disposing of existing culverts and open tops, installation of new culverts, sign installation, and all other incidental items necessary to complete the project in accordance with the plans and specifications.
The project is approximately 50 miles east of Grangeville, ID. This project is on roads 285 and 357 located about 18 miles east of the Red River Ranger Station following the Magruder Rd (RD 468). The project starts at the Junction of Road 468 and 285 and includes the entire length of roads 285 and 357 (27.99 miles). The project is in Red River Ranger District in the Nez Perce-Clearwater National Forests. The project begins in Section 28, Township 28 N, Range 11 E.
The Government's estimate for the project is between $100,000 and $250.000. Work on the project site may commence on or around September 1, 2018, and proceed in accordance with the contractor's approved work schedule and run continuously till the end of the project no later than October 31, 2019. Contractors may opt to perform all the work in 2019.
The RFQ shall be issued apprximately July 15, 2018 with award anticipated in Mid-Auguast. Bid bonds are not requried. The project as been set-aside for HUBzone small business concerns.
This presolicitation was posted on 6/22/2018 to an incorrect USFS FBO location by mistake under solicitation number 12034318Q0247. The original posting, made under the R-1 Northern Region location, should have been made under this R-1 IMAT location (Clearwater, Idaho Panhandle, Kootenai and Nez Perce NFs). In order to ensure that the notice and solicitation reach the correct market and pool of vendors, the notice was re-posted with this new solicitation number: 12034318Q0276. The orginal notice (12034318Q0247) satisfies the 15-day FAR required presolicitation posting for the procurement.
.
Files
| File | Type | Posted |
|---|---|---|
| A-7_AttachmentJ2__FSSSpecs.docx | DOCX document | |
| A-7_RFQ.doc.docx | DOCX document | |
| A-7_AttachmentJ3_Drawings.pdf |