Nez Perce-Clearwater NFs - East Fork Imnamatnoon Creek Culvert Replacement

Award Notice Posted

Solicitation number
AG-02RC-S-15-0047
Agency
Awarded
to Stone Ridge Construction, Inc.
Set-aside
HUBZone

Opportunity facts

Contract number
AG-02RC-C-15-0012 Federal contract award
NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Not on record
Place of performance
Powell Ranger Station (located 13 miles west of the ID-MT border off US Hwy 12) 192 Powell Road (mailing address) Lolo, Montana 59847, United States

Notice details come from SAM.gov. Updated .

Notice text

5 versions

Update #5 · Latest ·

Award made June 1, 2015.

Update #4 ·

This project is being done in collaboration with the Nez Perce Tribe Watershed program. The work requires removal of an existing 57"x 38" corrugated steel culvert on a tributary of the EF Imnamatnoon Creek and replacement with a structural plate arch culvert on precast concrete footings. The replacement structure is 90 linear feet in length and the excavation is considered a deep fill.


The work includes, but is not limited to, clearing and grubbing, erosion control measures, structure excavation, roadway embankment, removing and disposing an existing culvert, compaction, riprap, installation of geocell reinforcement along the length of the foundations, roadway surfacing, furnishing and installing a 4'5" rise by 10' span Structural Plate Arch Corrugated Steel Pipe, and all other incidental items necessary to complete the project in accordance with the plans and specifications.


This project is located in the Nez Perce-Clearwater National Forest on National Forest System Road No. 568 at Mile Post 4.50 in the Powell Ranger District in Section 7, T. 37 N., R. 14 E., Idaho County, Idaho.  To reach the site, travel approximately 88.1 miles east on Highway 12 from Kooskia, ID.


The Government's estimate is between $250,000 and $500,000. No formal pre-bid tour is scheduled. The site is currently accessible on foot or via a tracked ATV/UTV due to the presence of approximately .5-2 feet of snow. Interested offerors are encouraged to view the site prior to offer submittal due to the depth of excavation required and the resultant logistical challenges.


Solicitation was issued April 22, 2015. Construction work on the project shall commence no earlier than July 1, 2015. All in-stream work must take place between July 15th and August 30th and all work shall be completed by October 15, 2015.


Original bid bonds are required. The acquisition has been set-aside for HUBzone certified small business concerns.

The presolicitation notice was modified on 3/25/15 to correct the number of the road on which this project site is located.  The correct National Forest System Road No. is 568; the original presolicitation notice gave a National Forest System Road No.5689 by mistake.

Amended the solicitation on 5/19/15 to allow for stockpiling material on the 568B road.  Response deadline was extended to Tuesday, May 26th; 4:00 PM local time.

Update #3 ·

This project is being done in collaboration with the Nez Perce Tribe Watershed program. The work requires removal of an existing 57"x 38" corrugated steel culvert on a tributary of the EF Imnamatnoon Creek and replacement with a structural plate arch culvert on precast concrete footings. The replacement structure is 90 linear feet in length and the excavation is considered a deep fill.


The work includes, but is not limited to, clearing and grubbing, erosion control measures, structure excavation, roadway embankment, removing and disposing an existing culvert, compaction, riprap, installation of geocell reinforcement along the length of the foundations, roadway surfacing, furnishing and installing a 4'5" rise by 10' span Structural Plate Arch Corrugated Steel Pipe, and all other incidental items necessary to complete the project in accordance with the plans and specifications.


This project is located in the Nez Perce-Clearwater National Forest on National Forest System Road No. 568 at Mile Post 4.50 in the Powell Ranger District in Section 7, T. 37 N., R. 14 E., Idaho County, Idaho.  To reach the site, travel approximately 88.1 miles east on Highway 12 from Kooskia, ID.


The Government's estimate is between $250,000 and $500,000. No formal pre-bid tour is scheduled. The site is currently accessible on foot or via a tracked ATV/UTV due to the presence of approximately .5-2 feet of snow. Interested offerors are encouraged to view the site prior to offer submittal due to the depth of excavation required and the resultant logistical challenges.


Solicitation was issued April 22, 2015. Construction work on the project shall commence no earlier than July 1, 2015. All in-stream work must take place between July 15th and August 30th and all work shall be completed by October 15, 2015.


Original bid bonds are required. The acquisition has been set-aside for HUBzone certified small business concerns.

The presolicitation notice was modified on 3/25/15 to correct the number of the road on which this project site is located.  The correct National Forest System Road No. is 568; the original presolicitation notice gave a National Forest System Road No.5689 by mistake.

Update #2 ·

This project is being done in collaboration with the Nez Perce Tribe Watershed program. The work requires removal of an existing 57"x 38" corrugated steel culvert on a tributary of the EF Imnamatnoon Creek and replacement with a structural plate arch culvert on precast concrete footings. The replacement structure is 90 linear feet in length and the excavation is considered a deep fill.


The work includes, but is not limited to, clearing and grubbing, erosion control measures, structure excavation, roadway embankment, removing and disposing an existing culvert, compaction, riprap, installation of geocell reinforcement along the length of the foundations, roadway surfacing, furnishing and installing a 4'5" rise by 10' span Structural Plate Arch Corrugated Steel Pipe, and all other incidental items necessary to complete the project in accordance with the plans and specifications.


This project is located in the Nez Perce-Clearwater National Forest on National Forest System Road No. 568 at Mile Post 4.50 in the Powell Ranger District in Section 7, T. 37 N., R. 14 E., Idaho County, Idaho.  To reach the site, travel approximately 88.1 miles east on Highway 12 from Kooskia, ID.


The Government's estimate is between $250,000 and $500,000. No formal pre-bid tour is scheduled. The site is currently accessible on foot or via a tracked ATV/UTV due to the presence of approximately .5-2 feet of snow. Interested offerors are encouraged to view the site prior to offer submittal due to the depth of excavation required and the resultant logistical challenges.


It is estimated that the solicitation will be issued in mid-April. Construction work on the project shall commence no earlier than July 1, 2015. All in-stream work must take place between July 15th and August 30th and all work shall be completed by October 15, 2015.


Original bid bonds are required. The acquisition has been set-aside for HUBzone certified small business concerns.

The presolicitation notice was modified on 3/25/15 to correct the number of the road on which this project site is located.  The correct National Forest System Road No. is 568; the original presolicitation notice gave a National Forest System Road No.5689 by mistake.

Update #1 ·

This project is being done in collaboration with the Nez Perce Tribe Watershed program. The work requires removal of an existing 57"x 38" corrugated steel culvert on a tributary of the EF Imnamatnoon Creek and replacement with a structural plate arch culvert on precast concrete footings. The replacement structure is 90 linear feet in length and the excavation is considered a deep fill.


The work includes, but is not limited to, clearing and grubbing, erosion control measures, structure excavation, roadway embankment, removing and disposing an existing culvert, compaction, riprap, installation of geocell reinforcement along the length of the foundations, roadway surfacing, furnishing and installing a 4'5" rise by 10' span Structural Plate Arch Corrugated Steel Pipe, and all other incidental items necessary to complete the project in accordance with the plans and specifications.


This project is located in the Nez Perce-Clearwater National Forest on National Forest System Road No. 5689 at Mile Post 4.50 in the Powell Ranger District in Section 7, T. 37 N., R. 14 E., Idaho County, Idaho.  To reach the site, travel approximately 88.1 miles east on Highway 12 from Kooskia, ID.


The Government's estimate is between $250,000 and $500,000. No formal pre-bid tour is scheduled. The site is currently accessible on foot or via a tracked ATV/UTV due to the presence of approximately .5-2 feet of snow. Interested offerors are encouraged to view the site prior to offer submittal due to the depth of excavation required and the resultant logistical challenges.


It is estimated that the solicitation will be issued in mid-April. Construction work on the project shall commence no earlier than July 1, 2015. All in-stream work must take place between July 15th and August 30th and all work shall be completed by October 15, 2015.


Original bid bonds are required. The acquisition has been set-aside for HUBzone certified small business concerns.

Files

File Type Posted
Amendment1EFimnamatnoon.doc DOC document
EF_Imnamatnoon_Signed_Front_Page_Plans.pdf PDF
ImnamatnoonCulvertFSSS.pdf PDF
Imnamatnoon_Culvert_Plans.pdf PDF
EastForkImnamatnoonConRFPdocx.docx DOCX document
EFRoadPhoto.JPG JPG image
EFDownStreamView.JPG JPG image
EFPhotoThrough_Culvert.JPG JPG image

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors